Title: MINISTRY OF FUEL AND ENERGY OF UKRAINE
1- MINISTRY OF FUEL AND ENERGY
OF UKRAINE - Department of Nuclear Energy and Atomic
Industry -
-
Safety Improvement of Nuclear Power Plants in
Ukraine
Svyshch Andrii
RER/4/027 Strengthening Capabilities for Nuclear
Power Performance and Service Life including
Engineering Aspects Regional Workshop on
Modernization Projects of NPP Instrumentation and
Control Systems Related to Power Uprates and
License Renewals
2NUCLEAR POWER PLANTS OF UKRAINE
?yiv
3 The Comprehensive Program on Upgrading and
Safety Improvement of Ukrainian NPPs
- April, 1999 - first IAEA hearings of Ukraine's
National Report on the Nuclear Safety Convention
implementation. -
- As a result a Comprehensive Program on Upgrading
and Safety Improvement of Ukrainian NPPs was
developed and was acting for a period of
2002-2005. -
- The Comprehensive Program was the main program on
safety upgrade of Ukrainian NPPs for the period
of 2002-2005
4Structure of the Comprehensive Program on
Upgrading and Safety Improvement of Ukrainian
NPPs
- Actions ensuring the nuclear safety
- Actions increasing the level of the fire
prevention - Actions on componential replacement of automatic
control systems. - Actions on NPPs lifetime extension
4
5Structure of the Comprehensive Program on
Upgrading and Safety Improvement of Ukrainian
NPPs
- Actions increasing the radiation security level
- Actions on the electrotechnical equipment
replacement - Actions on equipment qualification
- Actions on the level of capacity factor
increasing
5
6Results of the Structure of the Comprehensive
Program implementation for the period of its
action (2002-2005)
130 actions
33
Level of funding relative to the planned one
- about 30
6
7 The Comprehensive Program on Upgrading and
Safety Improvement of Ukrainian NPPs Revision
- Decision on the Comprehensive Program on
Upgrading and Safety Improvement of Ukrainian
NPPs revision was stated in the National Report
on Implementation of Ukraine's Obligations due to
the Statements of Convention on Nuclear Safety in
April, 2005. -
- It was approved by international experts
7
8The Conception on Safety Improvement of NPPs
- The Conception on Safety Improvement of NPPs
was approved by the order of Cabinet of Ministry
of Ukraine 13/12/2005 ? 515. - For its implementation the List of
Technical-organizational Actions was developed
and introduced by the Order of the Ministry of
Fuel and Energy of Ukraine and the Regulatory
body of Ukraine ?19/10 in January, 25 2006. -
- The Conception includes ways of the safety
improvements, witch are stated as the most
important in Reports on Safety Analyses of
Ukrainian NPPs, taking into account the
international experience in organization of
safety improvement programs. -
8
9Planned implementation of The Conception on
Safety Improvement of NPPs
- For the period of 2006-2008 realization of 244
pilot actions scheduled -
- 2006
31 actions -
- 2007
74 actions -
- 2008
139 actions.
9
10The Conception on Safety Improvement of NPPs
Implementation
-
- In 2006 34 pilot actions on NPPs were fulfilled
and realization of the other pilot actions begun.
- In 2007 103 pilot actions on NPPs were fulfilled
and 68 pilot actions were extended on the other
NPPs units. - For 2008 the residualy actions are scheduled.
- Until 2010 all the pilot actions are scheduled to
be extended on the other NPP units.
10
11Costs Index for the Conception on Safety
Improvement of NPPs
-
- 2006 ?. (fact) 147,4 mln hrn
-
- 2007 ?. (fact) 213,3 mln hrn
-
- 2008 ?. (plan) 322,7 mln hrn
11
12Rivne NPP
- At Rivne NPP unit ?1 all the measures due to
the Conception shall be fulfilled till the end of
2008. According to these the Periodic Safety
Review Report will be developed and allow the
unit's lifetime extension (the projected lifetime
of the unit expires in 2010).
12
13- Thank You for Your Attention!
13
14Comprehensive Program Implementation
- In the period of 2002-2005 for implementation
of the Comprehensive Program 2 026,0 mln hrn.
were funded. -
- For the money provided owing to international
technical cooperation programs actions were
implemented with total cost of 75 mln hrn. - Financing owing to the National Budget for
the Comprehensive Program implementation haven't
been provided. -
14
15Means of the safety Improvement due to the
Conception
- Improvement of the reliability level of the
function of radioactive materials retention in
the containment -
- Improvement of the reliability level of emergency
power supply -
- Improvement of the emergency processes control
function -
- Intensification of analyses and NPP safety
substantiation -
- Limitation of equipment dependent failures and
common cause failures, caused by the internal
events
15
16Means of the safety Improvement due to the
Conception
-
- Control of the coolant leakage with the diameter
equivalent 100 mm from the first circuit to the
second circuit -
- Reliability improvement of the function of
reactor heat removal through the second circuit -
- Reliability improvement of the first circuit high
pressure protection in cold state and the thermal
shock protection -
- Reliability improvement of the first circuit heat
removal and pressure control function
16