Testing is the process of executing a program with the intent of finding errors. Glen Myers ... One classification is based on the following methodologies: ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 18
Provided by: isid3
Category:

less

Transcript and Presenter's Notes

Title: How to manage the testing phase of the PSIPs


1
How to manage the testing phase of the PSIP(s)
  • Isidoros Passas URENIO

2
Testing phase
In case of STRATINCA process as well
  • Definition
  • Testing is the process of executing a program
    with the intent of finding errors
  • Glen Myers
  • Objective explained
  • Testing is obviously concerned with errors,
    faults, failures and incidents. A test is the act
    of exercising software with test cases with an
    objective of
  • Finding failure
  • Demonstrate correct execution
  • Paul Jorgensen

3
Classification of Test
  • One classification is based on the following
    methodologies
  • Black box (Functional) Testing inspects
    specified behavior
  • White box (Structural) Testing inspects
    programmed behavior

4
Test methodologies
  • Structural (White box)

Functional (Black box)
5
Presentation methods of the testing phase
  • The cause-effect graph
  • Examine the requirements and restate them as
    logical relation between inputs and outputs.
  • The result is a Boolean graph representing the
    relationships called a cause-effect graph.
  • The decision table
  • each column of the decision table corresponds to
    a test case for functional testing.

6
Steps to create cause-effect graph
  • Study the functional requirements.
  • Mark and number all causes and effects.
  • Numbered causes and effects become nodes of the
    graph.
  • Draw causes on the LHS
  • Draw effects on the RHS
  • Draw logical relationship between causes and
    effects as edges in the graph.
  • Extra nodes can be added to simplify the graph

7
Cause Effect Graph
8
Decision Table
  • Two dimensional mapping of condition against
    actions to be performed
  • Conditions evaluate to Boolean
  • Action corresponds to expected activity
  • They can be derived from Cause Effect graph too
  • Map cause as condition
  • Map effect as action

9
Cause effect graph- Decision table
  • Causes IInvoked Xdont care Ssuppressed
  • Effects Ppresent Aabsent

10
IEEE Standard 829 - 1998
  • Test plan identifier
  • Introduction
  • Test Items
  • Features to be tested
  • Features not to be tested
  • Approach
  • Item pass/fail criteria
  • Suspension criteria and resumption requirements

11
The testing phase of the PSIP in Region of
Central Macedoniaand the ICT cluster
12
Testing phase and STRATINC
  • Two main scopes
  • (a) Test the flow system of Information for the
    Strategic Intelligence platform
  • (b) Test the functionality of the software Pilot
    platform
  • Proposed Methodology
  • White Box for scope (a)
  • Black Box for scope (b)

13
Proposed testing process of the PSIP in RCM
  • The Information collection process into the PSIP
    will be tested based on the white box methodology
    by a Strategic Intelligent expert from URENIO.
  • The functions of the installed PSIP will be
    tested by the 20 companies that answered the
    questionnaires.

14
URENIO RCM Requirements
  • Investigation
  • Watch-Alert
  • Analysis output
  • Information diffusion
  • Type of watch
  • Technological scientific
  • Products
  • Market
  • Managerial
  • Supplier/provider
  • Costumer
  • Patents

15
Points that will be assessed during the Usability
tests
  • All aspects of user interfaces are tested
  • Display screens
  • messages
  • report formats
  • navigation and selection problems

16
Test Summary Report
  • Will be generated towards the end of the testing
    phase.
  • It will cover each subsystem
  • Information collection process
  • And a summary of the tests which have been
    applied to the PSIP.

17
Testing phase deliverables
  • Test deliverables
  • Testing tasks
  • Responsibilities
  • Staffing and training needs
  • Risk and contingencies
  • Approvals
Write a Comment