Bridge Deck Life Study - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Bridge Deck Life Study

Description:

Bridge Deck Life Study. Progress Report; Sept. 13, 2001. Dan ... Correlate bridge deck life with salt use. Estimate maintenance costs associated with salting ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 12
Provided by: danf156
Category:

less

Transcript and Presenter's Notes

Title: Bridge Deck Life Study


1
Bridge Deck Life Study
  • Progress Report Sept. 13, 2001

Dan Fisher, Assistant Professor Oklahoma State
University
2
Objectives
  • Correlate bridge deck life with salt use
  • Estimate maintenance costs associated with salting

3
Study Parameters
  • Interstate highway system bridges
  • Constructed in early 60s
  • Relatively uniform standards and methods from
    state to state
  • Bridges in large metro areas
  • High traffic
  • Critical arteries

4
Overall Approach
no exit from the loop!
5
State DOT Data
  • Inspection reports
  • Universally available
  • Bridge-by-bridge data
  • Contain no maintenance or repair info.
  • Contract reports
  • Major repair and replacements only
  • part of the story
  • Usually provides bridge-by-bridge data

6
State DOT Data
  • Maintenance reports
  • not bridge-by-bridge data
  • Not well organized
  • Salt use reports
  • Almost non-existent
  • Purchase orders or invoices

7
Sources of Existing Data
  • TRIS database (Transportation Research
    Information Service)
  • Local studies contacts
  • Starting point for additional data collection
  • ITDB database (Intermodal Transportation
    Database)
  • To be explored

8
Current Target States
  • No Salt State California
  • LA freeways valley side
  • Good contacts, good data
  • High Salt State Illinois
  • Chicago freeways
  • Good contacts, excellent data
  • Moderate Salt State Oklahoma
  • Oklahoma City freeways
  • Good contacts, poor data

9
Some Preliminary Results
  • High Salt
  • 86 of steel beam bridges replaced
  • Avg. Life lt 29.6 years
  • No Salt
  • 0 of steel beam bridges replaced
  • Avg. Life gt35 years

10
Problems
  • We dont know how long the no-salt bridges will
    last.
  • Extrapolate to no-salt life expectancy

11
Next Quarter Plans
  • Complete analysis for 3 target states
  • Add 1 more high-salt and one more low-salt
    state to study
  • Begin to accumulate salt-use and maintenance
    data
Write a Comment
User Comments (0)
About PowerShow.com