Title: High Intensity Neutrino Source R
1High Intensity Neutrino Source RD Program -
Mission, Status, Plans, and Support Needs -For
AD Department HeadsMarch 2007Bob Webber
2High Intensity Neutrino Source RD
- The Mission
- We have been tasked by the Directorate, since
nearly two years ago, to assemble and operate
with beam the front-end of the Proton Driver
linac in Meson Detector Building by the end of
2010.
30.5 MW Initial 8 GeV Linac
PULSED RIA Front End Linac 325 MHz 0-110 MeV
Single 3 MW JPARC Klystron
Modulator
Multi-Cavity Fanout at 10 - 50 kW/cavity Phase
and Amplitude Control w/ Ferrite Tuners
11 Klystrons (2 types) 449 Cavities 51
Cryomodules
H-
RFQ
MEBT
RTSR
SSR
DSR
DSR
ßlt1 TESLA LINAC
10 MW TESLA Multi-Beam Klystrons
Modulator
1300 MHz 0.1-1.2 GeV
48 Cavites / Klystron
2 Klystrons 96 Elliptical Cavities 12 Cryomodules
ß.81
ß.81
ß.81
ß.81
ß.81
ß.81
8 Cavites / Cryomodule
8 Klystrons 288 Cavities in 36 Cryomodules
TESLA LINAC
1300 MHz ß1
80 of the Cost
Modulator
Modulator
Modulator
Modulator
10 MW TESLA Klystrons
36 Cavites / Klystron
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
Modulator
Modulator
Modulator
Modulator
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
ß1
4Following Orbachs ILC Timeline Comments
- Re-invigorated interest in the Directors Office
in Proton Driver synergies with ILC and other
ideas - Directors statement that he would seek to build
6 GeV section of ILC - Establishment of steering group under Young-Kee
Kim to generate strategic plan for accelerator
effort - Immediate impact on HINS/PD effort
- None on HINS Meson RD mission
- Start (actually revival of) discussions on
possibility of using 6 GeV section of ILC as the
high energy end of an 8 GeV Proton Driver - Dont you simply add on the front 2 GeV?
- Are we expected to fit three times the RF power
into the ILC physical geometry?
5From Directors 3/9/07 ILC Fest Talk
6A Possible OutcomeFrom Directors 3/9/07 ILC
Fest Talk
Here we are, although the mission is actually 60
MeV and FY07/FY08 funding is actually 2.2/2.8M
MS
7HINS RD Facilities Plan
- To address accelerator physics questions for
a new concept, low-energy superconducting Linac - we will construct key components of this Linac
and integrate them into a demonstration
accelerator in Meson Detector Building - Pulsed 2.5 MW, 325 MHz klystron RF power source
- 325 MHz high power RF component test facility for
studying RF power control devices - Test stand for 325 MHz RT cavities and a test
cryostat for 325 MHz SC spoke cavities - Ion source and RFQ as a 2.5 MeV beam source
- 10 MeV Room Temperature Linac
- Three 325 MHz SC spoke cavity cryomodules
- All accelerator sections to be operated with beam
up to 60 MeV to verify and quantify performance - This all adds up to building and operating a
first-of-its-kind superconducting 60 MeV H- linac
8325 MHzFront-EndLinac
Single Klystron Feeds SCRF Linac to E gt 100 MeV
SCRF Spoke Resonator Cryomodules
Charging Supply
MEBT
RFQ
Modulator Capacitor / Switch / Bouncer
Ferrite Tuners
RF Distribution Waveguide
115kV Pulse Transformer
325 MHz Klystron Toshiba E3740A (JPARC)
9Layout Through Second ß.4 Cryostat
Ion Source
RFQ
MEBT
Room Temperature 16-Cavity, 16 SC Solenoid Section
2.5 MeV
50 KeV
10 MeV
Two ?0.2 SSR 9-Cavity, 9-Solenoid Cryostats
20 MeV
30 MeV
One ?0.4 SSR 11-Cavity, 6-Solenoid Cryostat
60 MeV
10HINS Floor Plan in Meson Detector Building
ILC HTC Cave
Cavity Test Cave
RF Component Test Facility
Klystron and Modulator Area
60 MeV Linac Cave
Existing CC2 Cave
Ion Source and RFQ Area
150 ft.
11Klystron and Waveguide Installation
12Modulator and Pulse Transformer
Pulse Transformer Output Current 2A/div at 36A
Bouncer Voltage
Capacitor Bank Voltage at 5.6 KV
Modulator Output Current 200A/div
Modulator Signals at 5.6 KV into Resistive
Load February 2, 2007
13RF Component Test Area Cage
14Electronics Installed
Klystron and modulator interlocks
Control system timing crate
Personnel safety interlocks
Klystron solenoid power supplies
15HINS Room Temp Cavity in Production
Body wall roughed in and annealed.
Cavity in concept
Copper spokes rough machined and annealed
Brazed cavity before welding end walls
16Bead Pull thru Completed RT CH-01
View thru RF drive port during bead pull
Relative field amplitudes Blue measured Red -
predicted
17Superconducting Cavity Fabrication
18Quick Status
- 2.5 MW, 325 MHz modulator/klystron system is
installed - Modulator is commissioned
- Klystron commissioning planned to commence on
April 2 - Fast ferrite vector modulators await RF power
testing - Ion source work is proceeding on 50 KeV sources,
both H and H- sources - 2.5 MeV RFQ is in fabrication, delivery expected
end of summer - First Room Temperature spoke cavity will be ready
for power testing in a few weeks - Two superconducting spoke cavities are now in
fabrication, delivery of first expected in April - Prototype superconducting solenoid is built and
final design is progressing - Cryostat for SC cavity testing is in design review
19Recent AD HINS Effort
20Recent AD HINS Effort
21HINS Near-Term Schedule Goals in MDB
- 325 MHz RF power system commissioning
- Commence in two weeks
- Component testing in RF test area
- Awaiting RF power system commissioning
- First room-temp cavity full power tests
- Late April / Early May
- Design and construct fenced ion source / RFQ area
and move 50 KeV proton source from MS-6 to MDB - By mid-summer, i.e. before end of summer
accelerator shutdown - Procure and install RF power distribution system
to RFQ area - By mid-summer, i.e. before end of summer
accelerator shutdown - Install RFQ and commission
- Operate RFQ at full RF power by mid-September
2007 - 2.5 MeV beam before end of calendar year 2007
22Tasks Required for Near-Term Objectives
- Water
- Install new pump on existing skid
- Install water to ion source/RFQ
- Develop design specs for new skid with higher
flow capacity - Mechanical
- Install coax transmission lines to cavity test
cave - Construct ion source/RFQ area fencing
- Support ion source installation in MDB
- Design/Install RF distribution components to RFQ
- Vacuum
- Establish vacuum system for room temp cavity
testing in cave - Design/install vacuum system (with Piekarz et
al.) for ion source/RFQ - EE
- Deliver 6 regulated power supplies for ferrite
vector modulators (testing and RFQ) - Engineering for global solenoid, steering, and
FVM power system design - Charging supply
23Tasks Required for Near-Term Objectives
- Controls
- Provide interface with ILC Controls so we aim
for common methods - Continued/enhanced daily controls support
- EPICs database management and entry
- EPICS applications
- New timing system rate generator hardware
- RF
- Provide/commission initial LLRF system
- Cryo
- Support TD with test cryostat cryogenics system
issues - Install cryo transfer lines into cavity test cave
- Support TD with accelerator spoke cavity cryostat
and interface design to understand Linac
enclosure cryo physical requirements/features - Instrumentation
- Supply Semenov digitizer boards
242008-9 HINS RD Objectives
- Superconducting cavity test cryostat installation
and operation - Linac cave design, construction, and utilities
- Demonstration of independent RF amplitude phase
control of multiple Room Temperature cavities on
single klystron - Room temperature Linac installation
- 10 MeV operation
- Ready to install SC cavity cryostat(s) and high
energy beam transport in Linac cave in 2010
25Tasks Required for 2008-9 Objectives
- Water
- Install new skid
- Install water to Linac cave
- Mechanical
- Install coax transmission lines to room temp
section of Linac cave - Install room temp Linac beam line and components
- Vacuum
- Install vacuum system for room temp Linac
- EE
- Complete engineering design for global solenoid,
steering, and FVM power system - Deliver 40 power supplies for ferrite vector
modulators - Install/commission power system for room
temperature Linac components - Deliver final klystron charging supply
- Vacuum controls
26Tasks Required for 2008-9 Objectives
- Controls
- Provide interface with ILC Controls so we aim
for common methods - Continued/enhanced daily controls support
- EPICs database management and entry
- EPICS applications
- Hardware support
- RF
- Provide/commission multi-cavity LLRF system
- Cryo
- Support TD with test cryostat cryogenics system
issues - Install cryo transfer lines into cavity test cave
- Support TD with accelerator spoke cavity cryostat
and interface design to understand Linac
enclosure cryo physical requirements/features - Completer Linac cave cryo system design
- Instrumentation
- Specification/design/engineering/procurement of
room temp Linac beam instrumentation - Suppy/install room temp Linac beam instrumentation
27Conclusion
- A program to address key accelerator physics and
technology questions of a new concept, low-energy
superconducting Linac is actively being pursued - The present mission is to assemble a 60 MeV
front-end demonstration including three
superconducting cavity cryomodules by 2010 - Facilities are being out-fitted now
- 325 MHz RF power will soon be available
- Copper and Superconducting cavity design and
first article fabrication is well underway - Plan to have 2.5 MeV beam from RFQ by end of 2007
- Increased AD support is needed to stay on track
for coming year objectives