Title: SIS Hardware Update: The Back End
1SIS Hardware Update The Back End the Front End
- UTFAB Presentation
- October 31, 2007
- Rusty Scott
2SIS Back-End Hardware Upgrade Before
After
Back-end - All Oracle Applications
Oracle DB 1 - SIS
Oracle DB 2 Other
Banner Application
Portal/ RAMweb
2
3SIS Hardware Costs
- UTFAB - 173,000
- Exactly as approved by the UTFAB last year
- Central Administration - 173,000
- Information Systems 5,000
- The balance needed for the entire project
3
4Results of Back-End Hardware Upgrade
- Every request for registration this fall was met
during add/drop - Original prime objective of the UTF!!!
- Also allowed a full SIS database refresh in lt 24
hours - Prior projection was 60 hours
- Database server has headroom for future
- A great success!
4
5Pause for Discussion and Questions
5
6Front End Infrastructure
- The RamPoint Portal
- The Message Broker (a nerve center)
- Traffic cop that feeds all critical systems
with student and course data - RamPoint Identities, roles
- RamCT Persons, courses, instructors,
enrollments
6
7RamPoint The Nerve Center
RamWEB
RamCT
Libraries, Research Services, Group Course Tools
RamPoint Portal
ARIES-SIS
Kuali
FAMIS
Email/Collaboration
7
8Rampoint Usage Logins/Month
8
9RamPoint Usage Tab Stats
9
10Front End Upgrade Proposal
- Now 4 years old
- 25k/yr maintenance cost (very expensive)
- Maintenance included in SIS annual costs (50)
- Older software platform
- Concurrent user-limited
- Options
- Maintain continue with existing systems until
they melt - Build deconstruct and replicate all front-end
services - Integration all of those plus new services
infeasible! - Buy upgrade to new, scalable architecture
10
11Front-end Proposed Upgrade Before
After
Multiple, Redundant Boxes
11
12Cost Analysis
- Upgrade front-end hardware
- Net cost 125K
- Consulting (40K estimate) is already paid for!
- Normalized costs
- Annual front-end cost 125K/4 yrs 31,250/yr
- Student portion 15,625/yr
- Given 25,000 students, 2 semesters
- Normalized cost 15,625/2 semesters/25K
students - 31/semester/student
- 2.1 of 15/semester UTF
- 25k savings/yr in maintenance costs
- Initial cost of hardware will include 3 years
maintenance
12
13Why Does CSU Not Fund This?
- ALL available resources this year devoted to
RamCT - Upgrade to new system 330k
- Add disk 30k
- Add back-up capability 60k
- Add spare DB server - 30k
- Need to double back-end server to 4 procs,
- Currently, do not have the for even that
- Use it or lose it consulting services this
fiscal year
13
14Other
- Time to reinvigorate front end services
- Support new (Google/MS) communication services
for students - Create student group to help define new services
- ACNS Targeted hire
- 3-year time frame
- Year 1
- Upgrade hardware, portal software
- Assess tab content (remove noise)
- Integrate new communication tools
- Begin 3rd party integrations
- Years 2 3
- Assess usage
- Refine define new services
15Hardware Upgrade, the Checklist
15
16Discussion and Questions
16