Title: GOVERNMENT OF ROMANIA
1GOVERNMENT OF ROMANIA
MINISTRY OF ECONOMY AND COMMERCE
MOST IMPORTANT PRIVATIZATION PROJECTS 2005
2Privatization of S.C. Electrica Muntenia Sud S.A.
- Subsidiary of SC ELECTRICA S.A.,
- Sector of activity Electricity transport and
distribution
- Comprises the following counties Bucuresti,
Ilfov, and Giurgiu - No. of Clients 1.061.448
- Sales MWh 4.384.362
- Residential Customers 33,0
- Consultant selected for privatization
PriceWaterhouseCoopers - Program for 2005 continuation of the
privatization process based on the Privatization
strategy approved by the Government
3Privatization of S.C. Electrica Muntenia Nord S.A.
- Subsidiary of SC ELECTRICA S.A.,
- Sector of activity Electricity transport and
distribution
- Comprises the following counties Prahova,
Dambovita, Buzau, Vrancea, Braila and Galati - No. of Clients 1.204.510
- Sales MWh 4.719.791
- Residential Customers 19,9
- Consultant for privatization to be selected
- Program for 2005 - offer of 10 shares on the
Stock Exchange Market - - initiation of the privatization
process, assisted by an international consultant,
through a strategy approved by the Romanian
Government
4Privatization of S.C. Electrica Transilvania Nord
S.A.
- Subsidiary of SC ELECTRICA S.A.,
- Sector of activity Electricity transport and
distribution
- Comprises the following counties Cluj,
Maramures, Salaj, Bihor, Satu Mare and Bistrita - No. of Clients 1.084.038
- Sales MWh 3.803.413
- Residential Customers 22,9
- Consultant for privatization to be selected
- Program for 2005 - offer of 10 shares on the
Stock Exchange Market - - initiation of the privatization
process, assisted by an international consultant,
through a strategy approved by
the Romanian Government
5Privatization of S.C. Electrica Transilvania Sud
S.A.
- Subsidiary of SC ELECTRICA S.A.,
- Sector of activity Electricity transport and
distribution
- Comprises the following counties Brasov,
Mures, Alba, Covasna, Harghita and Sibiu - No. of Clients 1.019.441
- Sales MWh 3.970.421
- Residential Customers 21,1
- Consultant for privatization to be selected
- Program for 2005 - initiation of the
privatization process, assisted by an
international consultant, through a strategy
approved by the Romanian Government
6Privatization of S.N.G.N. ROMGAZ S.A.
- Activities
- Geological researches for discovering
hydrocarbons - Production and supply of natural gas and
condensate - Underground storage of natural gas in depleted
deposits - Import of natural gas
- Research, deposit engineering and technological
engineering.
- Key figures
- More than 3600 output wells from which 252 serve
the activity of underground storage of natural
gas - 20 compression stations with an installed power
of 160.000 kW - 3 underground warehouses for storage of natural
gas having an actual capacity of 3 550 mil. m3 /
cycle - 15 dry station of natural gas
- More than 1900 km adducting pipes and 1240 km
collecting pipes - 460 pipe technological groups
- 30 station for separation and injection of
residual waters - 118 injections wells for residual waters
Privatization Program for 2005 - sale of a
majority stake towards a strategic investor, by
selecting an international
financial
consultant that will establish the privatization
strategy
- sale on the Stock Exchange
Market of a share stake of minimum 5 of capital.
7Projects in the Hydro Power Sector
- S.C. Hidroelectrica S.A.
- unique administrator of the Romanian hydropower
resources. - 350 hydropower plants and power pumping stations
summing up an installed power of 6288,44 MW
(from which 81,5 MW in power pumping station) - power generation in an average hydrological year
of 17298,35 GWh.
- Privatization and investment attracting program
for 2005 - it is envisaged private capital attracting
necessary for modernization and development in
hydropower sector by setting up structures of
independent producers type IPP, in which
Hidroelectrica should contribute with assets from
hydro power plants that need investment in a
balanced production mixture. There are under
negotiation the setting up of 4 (four) such IPP
structures. - it will continue the privatization process
initiated for 8 chains of micro hydropower
plants, located on River Doftana, River Arges,
River Manaileasa, River Olanesti, River
Dambovita, River Targului, as well as for CHE
Paltinul, through their sale as assets it will
be also initiated the privatization of other
chains of micro hydropower in exploitation - it will be initiated the privatization process
of the companies for services and maintenance in
hydro sector Hidroserv.
8Privatization of S.C. Complexul Energetic TURCENI
S.A.
- Turceni Power Plant
- Installed capacity 2,310 MW
- Current operational capacity 1,260 MW
- Facilities
- Boiler tower type, forced draught, intermediary
superheating, Babcock license - Turbine Rateau-Schneider license, 4 cylinders on
one rotor line - Generator synchronous, Alstom license, hydrogen
cooling
The Associated Coal Mines The Turceni TPP is
supplied with lignite from various coalmines that
are within between 15 and 85 kilometres from the
power plant.
Equity ROL thousands 4,567,414,652 as per
1st of April 2004
Total no. of employees 1,313
The hired privatization consultant is preparing
the privatization strategy draft.
9Privatization of S.C. Complexul Energetic CRAIOVA
S.A.
- ISALNITA TPP
- Installed capacity 2x315 MW
- Current operational capacity 2x300 MW
- Facilities
- Boiler tower type, forced draught, intermediary
superheating, MAN license - Turbine Rateau-Schneider license, 4 cilinders on
one rotor line - Generator synchronous, Alsthom
- CRAIOVA TPP
- Facilities
- Boiler tower design, forced draught, with the
following parameters - Turbine FIL 150 type, Romanian manufacturing,
three cilinders, 3000 rotations/minute, steam
extraction at 1.2 bar for district heating,
condensation at 0.04 bar - Generator Romanian manufacturing, 150 MW active
power, 176 MVA apparent power
The Associated Coal Mines The Craiova power
plants are supplied by lignite from various coal
mines that are within a 100 km distance from the
power plants. The mining exploitations included
are Ruget-Seciuri, that has supplied 650,000 tons
of lignite to Craiova TPP and it is placed at a
distance of about 100 km.
Equity ROL thousands 2,096,920,737 as per 1st of
April 2004
Total no. of employees 1,678
The negotiations with the selected privatization
consultant are in progress.
10Privatization of S.C. Complexul Energetic
ROVINARI S.A.
- ROVINARI TPP
- Installed capacity 1320 MW
- Current operational capacity 860 MW
- Facilities
- Boiler Benson, tower type, forced draught,
intermediary superheating, ABB Babcock license - Turbine Rateau Schneider license, 4 cilindres
on one rotor line - Generator synchronous, Alsthom license, hydrogen
cooling
The Associated Coal Mines The Rovinari TPP is
supplied with lignite from various coalmines that
are within 6 Km radius from the power plant.
Rovinari mining aria is situated on the
south-west side of Tg-Jiu town, on the right side
of Jiu River.
Equity ROL thousands 2,227,953,465 as per 31st
of December 2003
Total no. of employees4,035
The negotiations with the selected privatization
consultant are in progress.