Title: E'I'G' EURIDICE


1
E.I.G. EURIDICE
  • Changes in the articles of association
  • Status of the Project
  • Construction method (FBE)

2
Principal Changes in the articles of
association
  • 1. NAME
  • EIG PRACLAY -gt EIG EURIDICE
  • (European Underground Research Infrastructure
    for Disposal of nuclear waste In Clay
    Environment).
  • 2. AIMS
  • Principal changes are
  • management and exploitation of URL and other
    infrastructures (presentation Marc Buyens)
  • possibility of contracting for realization and
    operation of other research projects and
    experiments regarding underground nuclear waste
    disposal
  • communicate about our activities

3. COMMITTEES Elaboration of the POP (advisory
committee for acceptance of underground
experiments) President Bernard NEERDAEL.
3
Underground Infrastructure
4
Status of the Project and Planning
  • Past
  • construction of second shaft accomplished end of
    1999
  • -gt scientific report February 2001
  • EIG will publish a report of the activities
    1998-2000 by the end of April 2001
  • Present (2001)
  • construction of connecting gallery in
    2001. Construction technique will be explained by
    FBE at the end of this presentation
  • call for tender ventilation building
  • dismantling OPHELIE (presentation BDE)
  • report description of PRACLAY experience

5
Future ?
  • As one of the aims of EIG EURIDICE is to
    demonstrate the feasibility
  • of one concept of waste disposal in clay layers
    we have the intention
  • (which will have to be submitted to the board of
    directors of EIG and to the
  • Members of EIG) not to start the design of the
    PRACLAY experiment as long as
  • open questions regarding the reference concept
    are not answered (presentation
    JB)
  • we did not obtain information regarding the
    concept and the in situ experiment from the
    dismantling of the OPHELIE mock-up
  • Effect on future planning of x
    years of Review Period (RP)

6
Milestones (1)
Actual CASE
X years RP
Construction of ventilation building 2002 200
2 Realization reinforcing structure at the
crossing 2002 2002X between connection gallery
and PRACLAY gallery Installation of
instrumentation in clay formation 2002 2002X and
stabilization of the host rock
7
Milestones (2)
Actual CASE
X years RP
Report description of PRACLAY experience
(FBE) 2001X Definition in situ
instrumentation 2002 2002X Realization of
the PRACLAY gallery 2003 2003X
Installation of the PRACLAY experiment 2004 2004
X Heating phase 2005/2010 2005/2010X
Cooling phase 2011 2011X
Dismantling 2012 2012X