1
Ranney Collector Construction
2
Ranney Collector Overview
  • Pump Station
  • Central Reinforced Concrete Caisson
  • Horizontal Well Screens

3
Primary Phases of Collector Well Construction
  • Caisson Construction
  • Lateral Projection
  • Screen Installation and Development
  • Performance Testing

4
Caisson Construction
L1
L1
L2
Grade
Grade
Grade
L1
L1
STEP 1
STEP 2
STEP 3
5
Initial Caisson Lift with Cutting Shoe, Toledo
Bend Reservoir
6
Inner and Outer Forms
7
Caisson Lift with Ports, Lake Havasu City
8
Clam Shell Excavation, Louisville
9
Clam Shell Excavation, Lake Havasu City
10
Floor Reinforcing, Iowa City
11
Completed Caisson
12
Primary Phases of Collector Well Construction
  • Caisson Construction
  • Lateral Projection
  • Screen Installation and Development
  • Performance Testing

13
Lateral Projection
Grade
SWL
Caisson
Lateral A
Lateral B
Ports
14
Hydraulic Jacking Machine
15
Lateral Projection, Iowa City
16
TYPICAL BORE PILOT
  • Minimize Friction
  • Remove Material
  • Provide Horizontal Bore

17
Projection Pipe and Sand Line
18
Laterals Installation Bore Pilot Projection
Pipe Centered On Port Assembly
19
Lateral Installation Projection Pipe Advancement
20
Lateral Installation Projection Pipe Advancement
21
Primary Phases of Collector Well Construction
  • Caisson Construction
  • Lateral Projection
  • Screen Installation and Development
  • Performance Testing

22
Screen Installation
Grade
SWL
Caisson
Lateral A
Lateral B
(Wire-Wrap Screen)
(Wire-Wrap Screen)
23
Wire-Wrapped Screen
24
Wire-Wrapped Screen
25
Development By Overpumping
Q
Grade
SWL
Caisson
Pump
Laterals
26
Development By Surging
27
Sand Content Measurement
28
Primary Phases of Collector Well Construction
  • Caisson Construction
  • Lateral Projection
  • Screen Installation and Development
  • Performance Testing

29
Performance Testing, Sonoma County
30
Top Slab Installation
31
Ranney Collector Conceptual Design and Yield
32
Equations to Quantify Yield
33
Input Parameters / Design Assumptions
T 482,600 gpd/ft S 0.313 K 5602 gpd/ft sq B
86 feet A 700 feet Zi 75 feet
Laterals 10 to 12 Lateral Radius 0.5
ft Lateral Length 200 ft Caisson Radius 8
ft Pumping Level 15 ft above laterals
34
Conceptual Design
35
Yield With Recharge
36
Yield Without Recharge
37
Characteristics of Ranney System
  • 12.6 to 16.0 million for Total System
  • 100 of Construction and Maintenance On Shore
  • Yield Remains High When River Migrates
  • Pilot Testing to Confirm Yield