Texas Commission on Environmental Quality - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

Texas Commission on Environmental Quality

Description:

A program of the Texas Commission on Environmental Quality ... Programs of the Pollution Prevention and ... Case Study Herbicide Manufacturing Facility ... – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 24
Provided by: sher56
Category:

less

Transcript and Presenter's Notes

Title: Texas Commission on Environmental Quality


1
Texas Commission on Environmental Quality
  • Programs of the Pollution Prevention and
    Education Section
  • Danielle L. Doss, Engineering Specialist
  • Houston Regional Office

2
Pollution Prevention and Education
  • Mission Statement
  • Help our customers prevent pollution, conserve
    resources, and achieve compliance through
    education, outreach, technical assistance, and
    innovative technologies.

3
Pollution Prevention and Education
  • Programs
  • P2 planning
  • Clean Texas
  • Renew
  • WRPA
  • SAV

4
Bright ideas.
Better performance.
How can SAV benefit your facility?
5
Site Assistance Visit
  • Free, non-regulatory, non-enforcement pollution
    prevention site assessment
  • Multi-media

6
Assistance to Entities
  • Market to entities that are priority for TCEQ
  • Entities with poor compliance history rating that
    want to improve performance
  • Sites identified with help of TCEQ Regional
    Offices

7
Program Goals
  • Pollution Prevention
  • Reduce costs
  • Target emission reductions, energy efficiency,
    water conservation
  • Improve performance

8
SAV
  • Basis is in the Waste Reduction
  • Policy Act
  • Multi-media approach
  • Source reduction and waste minimization the goal
  • Targeted marketing (e.g. poor performers)

9
Why Pollution Prevention?
  • Protects public health
  • Reduces or eliminates the creation of pollutants
    through increased efficiency in the use of raw
    materials, energy, water, or other resources
  • Reduced regulatory exposure
  • Saves money

10
Pollution Prevention Activities
  • Equipment or technology modifications
  • Process/procedure modifications
  • Reformulation or redesign of products
  • Substitution of raw materials
  • Improvements in operational practices

11
Case Study Herbicide Manufacturing Facility
  • Original process - Copper was reacted with
    sulfuric acid to form copper sulfate which in
    turn reacted with caustic soda to form cupric
    oxide and used as a raw material in fungicide
    production. The copper containing water then was
    released to a pond to precipitate the sludge.
    Over the years around 240,000 cubic foot of
    copper rich sludge has been accumulated.
  • Problem identified during SAV visit The copper
    rich sludge poses a threat to the environment by
    leaching copper into the ground and eventually to
    the Sims Bayou.

12
Case Study Herbicide Manufacturing
Facility(contu)
  • Solution The sludge is treated in situ with
    sulfuric acid to leach out the copper and the
    solution is rerouted to the process.
  • End Result of SAV Visit
  • The copper recovery will permanently remove the
    chance of copper being leached out into the
    state waters.
  • Approximately one to two million dollars worth of
    copper will be recovered from the sludge.

13
Commitments
  • SAV identifies P2 opportunities
  • Entity commits to action plan
  • Entity commits to report on progress and
    environmental results

14
Format
  • Half-day to full-day onsite visit
  • Opening meeting (e.g. plant manager)
  • On-site assessment
  • Closing meeting

15
Confidentiality
  • Facility is free to limit access to specific
    parts of a site
  • Facility can withhold process information deemed
    confidential or proprietary
  • Any photos remain property of the facility

16
Confidentiality Waiver
  • SAVs are non-regulatory and confidential.
  • Confidentiality would be forfeited if an imminent
    threat to human health or the environment is
    discovered

17
The SAV Team
  • Composed of professional engineers and scientists
  • Austin, Houston/Beaumont, and Dallas

18
Gulf Coast Oil and Gas Pollution and Prevention
Workshop
  • FREE Workshop to discuss compliance with Texas
    regulations, reduction in pollution and save
    money for owners

19
Oil and Gas Workshop
  • Natural Gas Losses cost us all
  • Money and Product Loss for owner
  • Loss of pollution prevention through VOC
    emissions

20
Oil and Gas Workshop
  • Workshop goals
  • Offer strategies on improving efficiency
  • Decreasing or eliminating pollution of VOCs

21
Oil and Gas Workshop
  • Workshop dates are March 25 and 26
  • Workshop held at University of Houston-Victoria
  • For more information
  • www.p2planning.org

22
Contacts
Jeff Voorhis(512) 239-3178
Danielle Doss (713) 422-8920
Mesha Williams-Jones (713) 422-8915
23
Questions?
Write a Comment
User Comments (0)
About PowerShow.com