Muon Spectrometer Detector Description - PowerPoint PPT Presentation

About This Presentation
Title:

Muon Spectrometer Detector Description

Description:

A-line : alignment correction (x,y,z,,qxqy,qz) B-line : MDT deformations (8 parameters) ... complicated chain to create SQL files. no maintenance possible ... – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 12
Provided by: laurentc4
Category:

less

Transcript and Presenter's Notes

Title: Muon Spectrometer Detector Description


1
Muon Spectrometer Detector Description
Outline - Present situation -
Missing elements - New chain to update
parameters - Alignment issues -
GeoModel issues - Manpower issues


2
Present situation
  • R_Light_01_01 (R) ATL-CSC-01-00-00
  • primary numbers coming from plans
  • Reference allow cross check and debugging with
    Alignment software
  • R_Light_01_01_EGG(R')
  • egg shape (7.5 mm in vertical direction, except
    BEE)
  • R_Light_01_01_EGG_RNDM (R) ATL-CSC-01-01-00
  • egg shape (7.5 mm in vertical direction) overest
    imated (4mm)
  • shifts 1mm in 3 space directions underestimat
    ed (2 to 4 mm)
  • tilts 1mrd in 3 space directions underestimat
    ed (2 to 4 mm)

all chambers barrel end cap are moved
3
Missing elements
  • Saddle
  • Small big wheel supports
  • MDT barrel supports
  • CSC supports
  • ID patch panels
  • Access platforms
  • Platforms sector 13
  • Services (cable tray...)
  • Tomograph data
  • ....
  • Black already in primary numbers (AMDB) but not
    in GeoModel/G4
  • Red not yet implemented anywhere

4
Detector description parameters chain
GeoModel
G4
Oracle
Primary numbers
AMDB
Active part
automatic-translation
Dead Matter
Reconstruction
5
Primary numbers
  • Primary numbers coming from plans
  • active part MDT,RPC,TGC,CSC
  • dead part coils, feet, cryostat ,..
  • 50 000 parameters
  • No clashes only one way to debug PERSINT

6
Lines A B
  • AMDB description
  • D-line objects Dimensions
  • P-line objects Positioning
  • H-line Cuts out
  • A-line alignment correction (x,y,z,,qxqy,qz)
  • B-line MDT deformations (8 parameters)
  • never been tested

7
Oracle(1)
  • Old way to update Oracle DB
  • Active part
  • complicated chain to create SQL files
  • no maintenance possible
  • primary numbers vs Oracle checked (AmdcOracle
    Svc)
  • position deduced from primary number vs GeoModel
    checked (AmdcMGM)
  • Dead part
  • complicated chain, no maintenance possible,
    update very difficult
  • no way to compare easily primary numbers and
    Oracle parameters due the absence of BREP'S
    Boolean in GeoModel/G4
  • coil, feet, ... done long time ago, parameters no
    coming from primary numbers gt CLASHES

8
Oracle(2)
  • New way to update Oracle DB
  • Active part New chain, clean, from primary
    numbers to SQL files
  • NTU Athena / Saclay share the job
  • SQL files are easier to update Oracle DB
  • CSC cosmic set-up do in that way
  • need to validate with r_01_01 the new path
  • need to update primary numbers to Oracle
  • Dead part
  • primary numbers already in Oracle

9
GeoModel
  • New way to update GeoModel
  • Dead part
  • Source-to-source translator written to
    automatically go from XML to C
  • prototype ok
  • update on BREP'S G4 in place
  • Work to be done to validate the new path
  • stopper need to debug GeoModel for BREP'S
  • need to validate G4 new volumes
  • read at initialisation phase primary numbers from
    oracle DB
  • validation for an already existing volume (ex.
    Voussoirs) with muons
  • update all dead matters parameters
  • full validation

10
ManPower(1)
  • Primary numbers update
  • JF.Laporte D.Pomarede
  • Software to update Oracle DB Active part
  • JF.Laporte, A. Ailiopoulos,V.Tsulaia M
    Koratzinos
  • Software to update Oracle DB Dead matter part
  • M Koratzinos A.Barashkou
  • GeoModel
  • S.Spagnolo V.Tsulaia
  • GeoModel/G4 translation
  • V.Tsulaia

11
ManPower(2)
  • JF.Laporte 10
  • D.Pomarede 5
  • A. Ailiopoulos 50
  • V.Tsulaia 10
  • M Koratzinos 100 last 5 months 0
  • A.Barashkou 10
  • S.Spagnolo 30

Total FTE 1.15
50 000 parameters!!! 7000 m2 chambers!!
Write a Comment
User Comments (0)
About PowerShow.com