09/02 CAL/TKR, First integration. 09/05 Script integration completes ... Insufficient understanding of algorithms. In place revisions of scripts ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 11
Provided by: jimpa95
Category:

less

Transcript and Presenter's Notes

Title: GLAST%20status%20report


1
  • GLAST Large Area Telescope
  • CAL Status report
  • Jim Panetta
  • IT/Online
  • SLAC
  • CAL Delivery
  • CAL Integration
  • CAL Testing
  • CAL Current Status
  • panetta_at_slac.stanford.edu
  • 650-926-2995

2
Timeline
  • 08/05 Calorimeter delivered from NRL to SLAC
  • 08/05 Script integration starts
  • 08/08 Preliminary functional tests complete
  • 08/11 Final functional tests complete. SLAC
    accepts delivery
  • 08/12 Instrument characterization begins
  • 09/02 CAL/TKR, First integration
  • 09/05 Script integration completes
  • 09/18 CAL/TKR Second integration

3
Delivery
  • Delivered on time, 08/05
  • One bad channel, delaminated high energy PIN
    diode
  • Delamination occurred prior to delivery to SLAC

4
Script Migration
  • Migrated to version P01-07-00 of LATTE
  • Crucial for external sites to follow IT
    revisions from this time forward
  • Quite time consuming (1 man-month)
  • Implemented integrated test report class
  • Input parameters and files
  • Output parameters and files
  • Test result presentation
  • Migration from external plotting packages to
    HippoDraw

5
Integration
6
CAL Characterization
  • Pedestals
  • 15 - 20 minute characterization.

end
pedestal sigma (ADC counts)
  • Need understanding of algorithms

- end
xtal number
7
CAL Characterization, cont.
Pedestal noise time history
Integrated system
NRL
8
CAL Characterization, cont.
  • Timing wrt. TKR and External trigger
  • Gains and Noise measurements
  • Single crystal
  • slopes

Light asymmetry Log ( ADC(pos) / ADC(neg) )
Muon traverse Position
9
Script Migration TBD
  • Abstraction of some low level interfaces
  • e.g. Functional interface to trigger
  • Better tracking of configuration data
  • Into FITS data files
  • Into test reports
  • Time tracking of test results
  • Documentation, external internal
  • Finish graphics migration to HippoDraw

10
Current Status and Problems
  • Status
  • Taking data with integrated system
  • Pedestals and noise well understood
  • Total of 5 to 10 M cosmics expected
  • Problems
  • Insufficient understanding of algorithms
  • In place revisions of scripts
  • Require better integration of test reports
  • Test reports not exported (IT in progress)
  • Some configuration files in undocumented format