1
SRF Vertical Test Stand in IB1
  • Camille M. Ginsburg, Fermilab

C. Brown, R. Carcagno, Y. Huang, A. Lunin, J.
Ozelis, T. Peterson, I. Rakhno, C. Sylvester, R.
Rabehl, C. Reid, M. Wong
  • Test bare 1.3 GHz 9-cell SRF cavities
  • Measure Q vs. T
  • Measure Q vs. Eacc at 2 K
  • 250 W (CW) max RF power required at
    cavity (Qgt5x109, Eacclt35 MV/m)
  • Install in a vertical pit in the Fermilab
    Industrial Building 1 floor

Existing Magnet Test Facility in IB1 ? cryogenic
cooling capability of 125 W at 2 K
  • Status and Plans
  • Winter 2005/6 Team named, scope defined
  • Spring 2006 Cryostat, radiation shielding, civil
    engineering design completed
  • Summer 2006 Civil construction RF, cryogenic
    system, mechanical engineering design
  • Fall 2006 Cryostat, instrumentation installation
  • Winter 2006/7 Cryogenic and RF system
    commissioning
  • Spring 2007 Test first cavities

vacuum vessel f42
16
Radiation shielding
  • Personnel protection in existing offices/work
    spaces ?
  • Lead, steel, concrete and borated polyethylene
    radiation shielding
  • Maintain Controlled Area status in IB1
  • lt5 mrem/hr immediately outside shielding
  • lt0.25 mrem/hr in normal working areas