Validation of WINDOW 6 and THERM 6 for Use in Determining the Solar Heat Gain Coefficients and UFact - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Validation of WINDOW 6 and THERM 6 for Use in Determining the Solar Heat Gain Coefficients and UFact

Description:

Validation of WINDOW 6 and THERM 6 for Use in Determining the Solar Heat Gain Coefficients and UFact – PowerPoint PPT presentation

Number of Views:88
Avg rating:3.0/5.0
Slides: 21
Provided by: william217
Category:

less

Transcript and Presenter's Notes

Title: Validation of WINDOW 6 and THERM 6 for Use in Determining the Solar Heat Gain Coefficients and UFact


1
Validation of WINDOW 6 and THERM 6 for Use in
Determining the Solar Heat Gain Coefficients and
U-Factors of Complex Glazing Systems Research
Project
  • NFRC Project Number 07-101-RP
  • NFRC 2008 Fall Membership Meeting
  • William C. duPont/Sunergy Consulting
  • W. Ross McCluney/Sun Pine Consulting

2
Background
  • WINDOW 6 and THERM 6 are currently under
    development with new capabilities
  • Calculate the SHGC and U-Factor of
  • Woven Shades,
  • Venetian Blinds, and
  • Fritted Glass
  • Shading Systems Can Be Located
  • Indoor
  • Between Glazing
  • Outdoor

3
Project Objectives
  • Perform and coordinate the data collection,
    research, and testing to validate the new
    features within WINDOW 6 and THERM 6

4
Project Tasks and Deliverables
  • Task 1 Literature Search (3 Months)
  • Compile and Evaluate Existing SHGC and U-Factor
    Test Results
  • Describe Existing Methods of Calculating SHGC and
    U-Factors
  • Task 2 Perform Tests and Simulations (7 Months)
  • Identify and Procure Test Specimens
  • Perform SHGC and U-Factor Tests
  • Perform SHGC and U-Factor Simulations
  • Task 3 Compare and Evaluate Results (2 Months)
  • Literature Search
  • SHGC and U-Factor Test Results
  • Task 4 Status Reports Papers (3 Months)

5
Task 1 Overview
  • Existing SHGC and U-Factor Test Results
  • Manufacturer Product Test Results
  • Pella (of 20 sets of tests, 8 sets can be
    simulated)
  • Hunter Douglas (?)
  • ASHRAE Papers and Reports
  • Queens University
  • Tait Solar (RP 947 6-10 Tests Center-of-Glass)
  • University of Waterloo (RP 1131)
  • NFRC Research Projects
  • Black Blind Tilted (6 Tests at 3 Laboratories)
  • Glass Block
  • 7 Glazings with 9 Shades (48 Tests
    Center-of-Glass)
  • European Research Projects
  • Lund University

6
Task 1 Overview(Continued)
  • Existing SHGC and U-Factor Calculation
    Methodologies
  • ASHRAE Methods
  • ASHRAE 1311-RP
  • Existing SHGC Load Calculation Method
  • European Methods
  • ISO 15099
  • EN 14500 EN 14501

7
Task 2a Overview
  • Revision of Test Specimen List (In Collaboration
    with the PMTG)
  • 26 SHGC Tests
  • 20 U-Factor Tests
  • Revised Test Specimen List
  • 6 Simple Glazing System Tests
  • 4 Reference Glazing
  • 2 Fritted Glazing Samples (High Low Density)
  • 8 Inside Shading System Tests
  • 4 Woven Blinds (Loose Dense Weave, Tight
    Loose Fit)
  • 2 Venetian Blinds (Open, 45?, Closed, High Low
    Absorptance)
  • 10 Between-Glazing Shading System Tests
  • 2 Woven Blinds
  • 3 Venetian Blinds (Open, 45?, Closed, Thin
    Thick Pane Spacing, High Low Absorptance)
  • 1 Retracted (Venetian Blind)
  • 2 Outside Shading System Tests
  • 2 Sunscreen (Loose and Dense Weave, High Low
    Absorptance)

8
Task 2b Overview(Continued)
  • Procure Test Specimens
  • Donation of Windows, Glazing and Shades
  • Marvin Windows and Doors
  • Pella Corporation
  • Viracon
  • Glen Raven Custom Fabrics
  • Phifer Wire
  • Hunter Douglas
  • Need to Identify Glazing Layer with Properties of
    Shade

9
Task 2b Overview(Continued)
  • Metal Frame Window
  • Similar to Proposed Base Case Metal Frame Window
  • Designed by PI using common components
  • Built by ATI
  • Single-Glazed Clear
  • Inside Woven Shade
  • 2 Fritted Glass IG

10
Task 2b Overview
  • Perform SHGC Tests
  • Develop Statement of Work for SHGC Testing (NFRC
    Contract)
  • Architectural Testing, Inc. in Fresno, CA (ATI)
    chosen as NFRC 201 Accredited Testing Laboratory
  • SHGC Testing started October 6, 2008
  • PI Visit ATI during the week of October 6-10, 2008

11
Task 2b Overview(Continued)
  • Installation of Fenestration Attachments
  • SHGC and U-Factor Tests on Identical Specimens
  • Sometimes Difficult to Install Attachments at a
    Tilt
  • Shade Materials Sag out of Co-planer Orientation
  • Shade Supports shall have Minimum Impact on SHGG
    and U-Factor Testing
  • Venetian Blinds
  • Between Glazing use 2 Vertical Clear Acrylic
    Square Rods (1/8, ¼ ½) glued to Inside Glass
  • Indoor use Tightly Strung Monofilament
  • Woven Shades
  • Mounted on ½ x ¾ Wooden Frame (Painters
    Canvas)
  • Installation Verified by PI

12
Task 2b Overview(Continued)
13
Task 2b Overview(Continued)
  • Instrumentation of Calorimeter and Test Specimens
  • Added Temperature Sensors To Specimen
  • Modified Means of Attaching Temperature Sensors
    to Glass
  • Indicated Temperature Sensor Locations on Windows
  • Modified Air Temperature Radiation Shield
  • Verified Tracking
  • Solar Time
  • Off-Normal Indicator
  • Need to Retrieve Atmospheric Data to Adjust Solar
    Spectrum

14
Task 2b Overview(Continued)
15
Task 2b Overview(Continued)
16
Task 2b Overview(Continued)
  • Perform U-Factor Tests
  • Develop RFP for U-Factor Testing (NFRC Contract)
  • Primary NFRC 102 Laboratory (All Tests)
  • Architectural Testing, Inc. in Fresno, CA (ATI)
  • Secondary NFRC 102 Laboratories (Two Tests Each)
  • Architectural Testing, Inc. in St. Paul, MI
  • Architectural Testing, Inc. in York, PA
  • U-Factor Testing started October 3, 2008
  • PI Visit ATI during the week of October 6-10, 2008

17
Task 2b Overview(Continued)
18
Task 2c Overview
  • Perform SHGC and U-Factor Simulations
  • Develop RFP for SHGC Testing (NFRC Contract)
  • Response from 2 Laboratories
  • Carli, Inc.
  • ETC Laboratories
  • Carli, Inc. (Carli) Chosen as NFRC 100 and NFRC
    200 Simulation Laboratory
  • Simulated as Tested
  • As Installed in Solar Calorimeter or Thermal
    Chamber
  • At Environmental Conditions Experienced During
    Testing
  • Simulation of New Test Results
  • Window Manufactures have donated THERM files
  • Simulation of Old Test Results
  • More Potential Comparisons than Expected
  • Some Center-of-Glass only
  • Negotiating Final Contract at this meeting

19
Current Tasks
  • Follow-up with Optical Properties Test Results
    for addition to Shading Systems Library
  • Shade Manufacturers Have Donated Test Results
  • Start to Compile and Analyze Test Results
  • Start Simulations...

20
A Happy Scientist!
Write a Comment
User Comments (0)
About PowerShow.com