Six Sigma Project - PowerPoint PPT Presentation

1 / 52
About This Presentation
Title:

Six Sigma Project

Description:

Six Sigma. Organization details. Write briefly about your Organization and products/services ... Six Sigma. Pareto (Based on last 6 months to 1 year data) ... – PowerPoint PPT presentation

Number of Views:69
Avg rating:3.0/5.0
Slides: 53
Provided by: KRIS293
Category:
Tags: project | sigma | six

less

Transcript and Presenter's Notes

Title: Six Sigma Project


1
Six Sigma Project
Place the team photograph here
2
Organization details
Write briefly about your Organization and
products/services
3
D Define
DEFINE
M A Measure Analyse
MEASURE ANALYSE
I Improve
IMPROVE
C Control
CONTROL
4
Phase 1- Problem Definition
  • Problem Statement
  • Part number selected for study
  • Other similar part numbers having the problem
  • Process stages where the Problem is detected
  • Current average rejection for last 6 months
  • Maximum and Minimum rejection in last 6 months
  • Maximum rejection in a month -
  • Minimum rejection in a month -

5
Phase 1- Problem Definition
  • Number of lines/presses/machines used for
    processing
  • Objective of the Project
  • Annual Savings in Rs. Lakhs if the defect is made
    zero and horizontally deployed to other part
    numbers
  • Response
  • Variable / Attribute
  • Specification (if the response is variable)
  • Is RR study required
  • Yes / No
  • If RR study is required, RR to tolerance

6
Phase 1- Problem Definition
Process Mapping
7
Phase 1- Problem Definition
Project Planning
8
Phase 1- Problem Definition
Photograph of defect part
9
Pareto (Based on last 6 months to 1 year data)
Phase 1- Problem Definition
32 of the rejection is due to Blow holes.
Qty produced 27651 nos. Qty scrap 540
nos. Scrap - 1.74 Blow hole scrap
172nos. Blow hole scrap - 0.62
Double click on the graph to update the graph for
your project
10
COPQ (Cost of Poor Quality) Calculation
Phase 1- Problem Definition
Note Rejection should include both rework and
scrap
11
Phase 1- Problem Definition
  • Suspected Sources of Variation for the Problem
    statement (SSVs)

Transfer the above SSVs to the next slide, write
the tools you have used in the column and
identify which tool has been used for which
cause. Also write the name of the tool in the
Legend
12
Phase 1- Problem Definition
Tool7
Tool9
Tool3
Tool4
Tool5
Tool2
Tool6
Tool1
Tool8
Legend Tool1 , Tool2
, Tool3 , Tool4
, Tool5 ,Tool6 -
, Tool7 -
Tool8 - , Tool 9 -

13
D Define
DEFINE
M A Measure Analyse
MEASURE ANALYSE
I Improve
IMPROVE
C Control
CONTROL
14
Phase 2- Measure and Analyze
Analysis 1
  • Objective
  • Technique/Tool used
  • -

15
Phase 2- Measure and Analyze
16
Phase 2- Measure and Analyze
17
Phase 2- Measure and Analyze
18
Phase 2- Measure and Analyze
Analysis 1
  • Objective
  • Conclusion(s)
  • -

19
Phase 2- Measure and Analyze
Analysis 2
  • Objective
  • Technique/Tool used
  • -

20
Phase 2- Measure and Analyze
21
Phase 2- Measure and Analyze
22
Phase 2- Measure and Analyze
23
Phase 2- Measure and Analyze
Analysis 2
  • Objective
  • Conclusion(s)
  • -

24
Phase 2- Measure and Analyze
Analysis 3
  • Objective
  • Technique/Tool used
  • -

25
Phase 2- Measure and Analyze
26
Phase 2- Measure and Analyze
27
Phase 2- Measure and Analyze
28
Phase 2- Measure and Analyze
Analysis 3
  • Objective
  • Conclusion(s)
  • -

29
Phase 2- Measure and Analyze
Analysis 4
  • Objective
  • Technique/Tool used
  • -

30
Phase 2- Measure and Analyze
31
Phase 2- Measure and Analyze
32
Phase 2- Measure and Analyze
33
Phase 2- Measure and Analyze
Analysis 4
  • Objective
  • Conclusion(s)
  • -

34
Phase 2- Measure and Analyze
Total Analysis summary
  • Cause(s) identified for the problem
  • Root cause(s) identified for the problem
  • -

35
Phase 2 Measure and Analyze
Funneling Summary
Funneling
Cause(s) 1
Tool 1
Funneling 1
Cause(s) 2
Funneling 2
Tool 2
Cause(s) 3
Funneling 3
Tool 3
Funneling 4
Cause(s) 4
Tool 4
36
D Define
DEFINE
M A Measure Analyse
MEASURE ANALYSE
I Improve
IMPROVE
C Control
CONTROL
37
Phase 3 - Improve
Validation of the Root cause(s)
Tool used Data Conclusion
38
Phase 3 - Improve
Validation data for Root cause(s)
39
Phase 3 - Improve
Analysis of Data for Validation
40
Phase 3 Improve Actions Summary
41
Phase 3 Improve
Photograph of actions
42
Phase 3 Improve
Photograph of actions
43
Phase 3 Improve
Photograph of actions
44
D Define
DEFINE
M A Measure Analyse
MEASURE ANALYSE
I Improve
IMPROVE
C Control
CONTROL
45
Phase 4 Control Phase
46
Phase 4- Control
Analysis 1
  • Objective
  • Tool/technique used

47
Phase 4- Control
Data collected for Control
48
Phase 4 - Control
Results
Before
After
49
Phase 4- Control
Project Summary
  • Number of drill downs (funneling) done to reach
    the root cause(s)
  • Number of predominant root cause(s) identified
  • Time in months for completing the project
  • Tools/Techniques used

50
Phase 4 - Control
Tangible Benefits derived through the project
  • Overall scrap reduced from ---- ppm to ----- ppm
  • 2. Defect XXX scrap reduced from --- ppm to
    --- ppm
  • Cycle time reduced from ---- seconds to -----
    seconds.
  • Estimated cost benefits is Rs. ---------- per
    year.

Intangible benefits derived through the project
51
Phase 4 - Control
Current control plan
52
Phase 4 - Control
Proposed Control plan
Write a Comment
User Comments (0)
About PowerShow.com