Title: Six Sigma Project
1Six Sigma Project
Place the team photograph here
2Organization details
Write briefly about your Organization and
products/services
3D Define
DEFINE
M A Measure Analyse
MEASURE ANALYSE
I Improve
IMPROVE
C Control
CONTROL
4Phase 1- Problem Definition
- Problem Statement
-
- Part number selected for study
-
- Other similar part numbers having the problem
-
- Process stages where the Problem is detected
-
-
-
- Current average rejection for last 6 months
-
- Maximum and Minimum rejection in last 6 months
- Maximum rejection in a month -
- Minimum rejection in a month -
5Phase 1- Problem Definition
- Number of lines/presses/machines used for
processing -
- Objective of the Project
-
- Annual Savings in Rs. Lakhs if the defect is made
zero and horizontally deployed to other part
numbers -
- Response
- Variable / Attribute
- Specification (if the response is variable)
-
- Is RR study required
- Yes / No
- If RR study is required, RR to tolerance
-
6Phase 1- Problem Definition
Process Mapping
7Phase 1- Problem Definition
Project Planning
8Phase 1- Problem Definition
Photograph of defect part
9Pareto (Based on last 6 months to 1 year data)
Phase 1- Problem Definition
32 of the rejection is due to Blow holes.
Qty produced 27651 nos. Qty scrap 540
nos. Scrap - 1.74 Blow hole scrap
172nos. Blow hole scrap - 0.62
Double click on the graph to update the graph for
your project
10COPQ (Cost of Poor Quality) Calculation
Phase 1- Problem Definition
Note Rejection should include both rework and
scrap
11Phase 1- Problem Definition
- Suspected Sources of Variation for the Problem
statement (SSVs)
Transfer the above SSVs to the next slide, write
the tools you have used in the column and
identify which tool has been used for which
cause. Also write the name of the tool in the
Legend
12Phase 1- Problem Definition
Tool7
Tool9
Tool3
Tool4
Tool5
Tool2
Tool6
Tool1
Tool8
Legend Tool1 , Tool2
, Tool3 , Tool4
, Tool5 ,Tool6 -
, Tool7 -
Tool8 - , Tool 9 -
13D Define
DEFINE
M A Measure Analyse
MEASURE ANALYSE
I Improve
IMPROVE
C Control
CONTROL
14Phase 2- Measure and Analyze
Analysis 1
- Objective
- Technique/Tool used
- -
15Phase 2- Measure and Analyze
16Phase 2- Measure and Analyze
17Phase 2- Measure and Analyze
18Phase 2- Measure and Analyze
Analysis 1
- Objective
- Conclusion(s)
- -
19Phase 2- Measure and Analyze
Analysis 2
- Objective
- Technique/Tool used
- -
20Phase 2- Measure and Analyze
21Phase 2- Measure and Analyze
22Phase 2- Measure and Analyze
23Phase 2- Measure and Analyze
Analysis 2
- Objective
- Conclusion(s)
- -
24Phase 2- Measure and Analyze
Analysis 3
- Objective
- Technique/Tool used
- -
25Phase 2- Measure and Analyze
26Phase 2- Measure and Analyze
27Phase 2- Measure and Analyze
28Phase 2- Measure and Analyze
Analysis 3
- Objective
- Conclusion(s)
- -
29Phase 2- Measure and Analyze
Analysis 4
- Objective
- Technique/Tool used
- -
30Phase 2- Measure and Analyze
31Phase 2- Measure and Analyze
32Phase 2- Measure and Analyze
33Phase 2- Measure and Analyze
Analysis 4
- Objective
- Conclusion(s)
- -
34Phase 2- Measure and Analyze
Total Analysis summary
- Cause(s) identified for the problem
- Root cause(s) identified for the problem
- -
35Phase 2 Measure and Analyze
Funneling Summary
Funneling
Cause(s) 1
Tool 1
Funneling 1
Cause(s) 2
Funneling 2
Tool 2
Cause(s) 3
Funneling 3
Tool 3
Funneling 4
Cause(s) 4
Tool 4
36D Define
DEFINE
M A Measure Analyse
MEASURE ANALYSE
I Improve
IMPROVE
C Control
CONTROL
37Phase 3 - Improve
Validation of the Root cause(s)
Tool used Data Conclusion
38Phase 3 - Improve
Validation data for Root cause(s)
39Phase 3 - Improve
Analysis of Data for Validation
40Phase 3 Improve Actions Summary
41Phase 3 Improve
Photograph of actions
42Phase 3 Improve
Photograph of actions
43Phase 3 Improve
Photograph of actions
44D Define
DEFINE
M A Measure Analyse
MEASURE ANALYSE
I Improve
IMPROVE
C Control
CONTROL
45Phase 4 Control Phase
46Phase 4- Control
Analysis 1
- Objective
- Tool/technique used
-
47Phase 4- Control
Data collected for Control
48Phase 4 - Control
Results
Before
After
49Phase 4- Control
Project Summary
- Number of drill downs (funneling) done to reach
the root cause(s) - Number of predominant root cause(s) identified
- Time in months for completing the project
- Tools/Techniques used
50Phase 4 - Control
Tangible Benefits derived through the project
- Overall scrap reduced from ---- ppm to ----- ppm
- 2. Defect XXX scrap reduced from --- ppm to
--- ppm - Cycle time reduced from ---- seconds to -----
seconds. - Estimated cost benefits is Rs. ---------- per
year.
Intangible benefits derived through the project
51Phase 4 - Control
Current control plan
52Phase 4 - Control
Proposed Control plan