Title: REGULATORY UNIT


1
Second Stakeholder Consultation Workshop on the
Draft Implementing Rule for Interoperability on
Data Link Services (DLS)
2
AGENDA ITEM 1 WELCOME INTRODUCTIONWORKSHOP
OBJECTIVES
Jean-Luc GARNIER Head of Regulatory
Unit EUROCONTROL
European Organisation for the Safety of Air
Navigation
3
Agenda 1/2
  • Morning
  • 1. Welcome Introduction
  • Workshop Objectives
  • 2. The DLS Mandate Context Requirements
  • 3. Deployment of Data Link Services in Europe
  • 4. Overview of the Draft IR
  • Conclusions of the RA
  • Key Issues of the DLS IR Prescriptions
  • Key Issues of the Economic Appraisal
  • 5. Main Results of the Formal Consultation

4
Agenda 2/2
  • Afternoon
  • 6. Airlines View
  • 7. Discussion of main Outcome of Consultation
  • 8. The Way Forward
  • Next Steps
  • 9. Conclusions

5
Workshop Objectives
  • Discussion on the MAIN OUTCOMES of the Formal
    Consultation
  • Reach a COMMON UNDERSTANDING on the Way Forward

6
AGENDA ITEM 2 THE DATA LINK SERVICES
MANDATECONTEXT REQUIREMENTS
Jean-Luc GARNIER Head of Regulatory
Unit EUROCONTROL
European Organisation for the Safety of Air
Navigation
7
DLS IR Mandate
  • EUROCONTROL is mandated to develop a draft
    interoperability implementing rule on the
    provision and use of data link services supported
    by air-ground communications. This implementing
    rule will also address civil military
    coordination.

8
Mandate Requirements
  • EUROCONTROL is mandated to develop a draft IR
    that identifies
  • Objective Scope
  • Communications infrastructure
  • Data Link services
  • ATC Procedures
  • General requirements for ANSPs, aircraft
    operators, air-ground communication service
    providers
  • Temporary exemptions
  • Implementation conditions

9
Development Process DLS Draft IR
  • 27/01/2006-27/03/2006 Formal Consultation of
    Regulatory Approach
  • 2 May 2006 Workshop on the results of the
    Formal Consultation of the Regulatory
    Approach
  • 24 May 2006 Updated Regulatory Approach and
    SOR documents
  • 05/03/2007-07/05/2007 Formal Consultation on
    Draft IR Justification Material
  • 13 June 2007 Workshop on the results of the
    Formal Consultation of the IR
  • End June 2007 Updated Regulatory Approach and
    SOR documents
  • End September 2007 Final Report

10
AGENDA ITEM 3 DEPLOYMENT OF DATA LINK SERVICES
IN EUROPE
Martin ADNAMS LINK 2000 Programme
Manager EUROCONTROL
European Organisation for the Safety of Air
Navigation
11
AGENDA ITEM 4 OVERVIEW OF THE DRAFT
IRCONCLUSIONS OF THE REGULATORY APPROACHKEY
ISSUES OF THE DLS IR PRESCRIPTIONS
Jean-Paul DORE, Regulatory Unit EUROCONTROL
European Organisation for the Safety of Air
Navigation
12
Contents
  • Outcome of the Regulatory Approach
  • Key points of the DLS draft IR
  • Key points of the economic appraisal

13
Outcome of the Regulatory Approach
  • Set of subjects for prescriptions in the IR
  • High level requirements in the IR detailed
    technical requirements in Specification
  • IR Community Spec. necessary to ensure
    interoperability
  • No reference in the IR to Specification
  • IR open to alternative MoCs fulfilling SPR
    requirements

14
DLS Specification
  • Detailed interoperability, performance
    requirements
  • End to end communications, messages
  • Air ground communications
  • Addressing scheme
  • References to relevant EUROCAE, ICAO, AEEC
    standards
  • These requirements are not regulatory
    requirements
  • This Specification will be recognised as a Means
    of Compliance with the IR (publication in the OJ)

15
Application of IR CS
?
?
Community Specification
Implementing Rule
Data link Constituent
Conformity Assessment
EC Declaration of conformity
16
DLS Draft IR
  • Main body
  • Obligations of Operators
  • Obligations of ANSPs
  • Obligations of Member States
  • Obligations of Manufacturers
  • Obligations are specified with references to
    Annexes containing definitions or high level
    interoperability / performance requirements

17
Implementing Rule Layout
IR Main body
Annex I Definition of data link services
  • Articles
  • Stakeholders obligations

Annex III Communications Requirements End-to-End
communications Air-Ground communications
Which data link services? Which
communications? Which airspace?
Annex V Airspace definition
18
Airspace of applicability
  • Above FL 285
  • First step high density traffic area (LINK
    REGION) AIRAC date Feb 2011
  • Second step All EU Member States airspace area -
    AIRAC date Feb 2016

19
Aircraft equipage exemption
A/C operating IFR/GAT in the SES data
link Airspace (FLgt285)
  • Must follow forward-fit, new fit or retrofit
    policy for equipage
  • Exemptions
  • a/c with ED-100, ED-100A certified equipment
    delivered before Jan 2014
  • a/c planned for cease of operations before March
    2015
  • State a/c (specific condition for transport type
    state a/c)
  • a/c flying for testing, delivery and maintenance
    purposes

20
Timescales
21
Data link communications
  • ANSPs shall ensure that ground systems support
    air ground communications based on
  • ATN VDL-2
  • Or other MoC fulfilling specific conditions
    (specified in the IR)
  • Data exchanges with all equipped aircraft (flying
    in the airspace under their responsibility)
  • Operators shall ensure that airborne systems
    support air ground communications based on
  • ATN VDL-2
  • Or other MoC fulfilling specific conditions
    (specified in the IR)
  • Data exchanges with all ATS units (which may
    control these flights)

22
Other IR requirements
  • Safety requirements (Art. 6)
  • Conformity or suitability for use of constituents
    (Art. 7)
  • Verification of systems (Art. 8)
  • Additional requirements (Art. 9)
  • Requirements consistent with other IRs

23
AGENDA ITEM 4 KEY ISSUES OF THE ECONOMIC
APPRAISAL
David BOOKER, DAS/BMA EUROCONTROL
European Organisation for the Safety of Air
Navigation
24
AGENDA ITEM 5 MAIN RESULTS OF THE FORMAL
CONSULTATION
Jean-Luc GARNIER Jean-Paul DORE Regulatory Unit,
EUROCONTROL
European Organisation for the Safety of Air
Navigation
25
Comments received by Stakeholders
A Acceptable without amendment B Acceptable but
would be improved with amendments C Not
acceptable but would be acceptable with
amendments D Not acceptable under any
circumstances
26
Distribution of Responses by Groups of
Stakeholders
27
Distribution of Categories of Responses
28
Main Results of the Formal Consultation
  • IR Points which were widely accepted
  • List of main issues raised by formal consultation

29
IR Points widely accepted
  • The scope structure of the IR
  • The four proposed data link services
  • Air ground communication services based on
    ATN/VDL2 as a minimum on the ground
  • Openness to other technologies in addition to
    ATN/VDL2
  • Deployment of data link services above FL285 in
    the whole SES airspace by Feb 2016
  • The level of details of IR requirements
  • The need for a Specification
  • Air ground communication services can be
    provided by certified and/or non-certified
    organisations

30
Main issues raised by comments /1 Deployment of
data link services
  • Aircraft equipage
  • Which aircraft should be equipped
  • Which dates for aircraft equipage (forward fit,
    new fit, retrofit ..)
  • Data link recording of data link messages
  • Incentives

31
Main issues raised by comments /2 Deployment of
data link services
  • Aircraft exemption
  • FANS-equipped aircraft
  • FANS-equipped aircraft delivered before Jan 2014
    are exempted for their lifetime
  • When a standardised solution for FANS/ ATN
    convergence is available, a new Regulation should
    be developed
  • FANS accommodation by ACCs
  • Old long haul aircraft should be exempted
  • Old regional aircraft should be exempted
  • Aircraft planned for cease of operations 3 years
    after the retro fit period should be exempted

32
Main issues raised by comments /3 Deployment of
data link services
  • State aircraft
  • Very few comments relating to State aircraft
  • Amendment to the definition of transport type
    state aircraft
  • Applicability of the IR to non-EU State aircraft
    (DoD)

33
Main issues raised by comments /4 Deployment of
data link services
  • Ground deployment timescale
  • T0, Step 1, data link services operational in
    core area FLgt285
  • Some ANSPs accept the proposed date Feb 2011
  • A few ANSPs consider this date as non acceptable
    and propose significant delays for Step1
  • T1, Step 2, data link services extended to the
    SES airspace FLgt285
  • No question about the proposed date Feb 2016

34
Other issues raised by comments /1
  • Data link services/ communications
  • Definition of data link services based on ED 120
    must not mandate the implementation of the full
    set of messages elements
  • Reference to EUROCAE documents
  • Openness and criteria to air ground
    communication technology other than ATN / VDL2
  • Security aspect

35
Other issues raised by comments /2
  • IR scope
  • Identification of EATMN systems
  • Conformity assessment
  • Procedures for manufacturers
  • IR Drafting
  • Redundancy with Common Requirements
  • Interpretation of Recitals

36
Remarks
  • Detailed Review and open discussions of above
    issues under item 7 of the Agenda

37
AGENDA ITEM 6 AIRLINES VIEW
Anthony VAN DER VELDT IATA
European Organisation for the Safety of Air
Navigation
38
AGENDA ITEM 7 DISCUSSION OF MAIN OUTCOME OF
CONSULTATION
Jean-Luc GARNIER Jean-Paul DORE Regulatory Unit,
EUROCONTROL
European Organisation for the Safety of Air
Navigation
39
Main Outcome of the Consultation
Airspace of Applicability
1. Scope Definitions
2. DLS Deployment
3. Data Link Communications
DLS IR
4. Associated Procedures
5 Conformity Assessment
6. Additional Requirements
7. Writing of the IR
40
AGENDA ITEM 8 THE WAY FORWARDNEXT STEPS
Jean-Luc GARNIER Head of Regulatory
Unit EUROCONTROL
European Organisation for the Safety of Air
Navigation
41
The way forward
  • Updates of IR articles to address received
    comments
  • Aircraft exemption cases
  • Aircraft equipage timescales
  • Ground deployment timescales
  • Definition of data link services without messages
    elements
  • Improvement of requirements of Art 5 (data link
    communications)
  • Improvement of recitals
  • Update of the relevant parts of the JMA document,
    including the economic appraisal
  • Finalization of the Final Report
  • Delivery of the Final Report to the Commission by
    end of September

42
AGENDA ITEM 9 CONCLUSIONS
Jean-Luc GARNIER Head of Regulatory
Unit EUROCONTROL
European Organisation for the Safety of Air
Navigation
43
Second Stakeholder Consultation Workshop on the
Draft Implementing Rule for Interoperability on
Data Link Services (DLS)