2Background and Purpose
- At the 2001 IYM annual meeting, an ad-hoc Site
Envisioning and Building Committee was
established to explore potential visions for
the building and grounds at McNabb. - This committee was composed of participants from
IYM, the trustees and Clear Creek Monthly Meeting
and was formed to meet, pray, discuss and
develop a building plan for our joint future at
McNabb, Illinois. - From 2001 IYM Minutes
3Recap of Site Envisioning Building Work in
2001/2002
4SEB Committee Work in 2001/2002
- Following IYM 2001, the SEB Committee set out on
a long and arduous process of learning about the
wishes and hopes of all IYM members regarding the
future of the McNabb site.
5SEB Committee Work in 2001/2002
- The following steps were taken
- A visioning session with a cross-section of IYM
members attendees. - A workshop at Blue River Quarterly.
- Visits to monthly meetings.
- Focus Group of members and attenders from several
meetings. - A survey of all current IYM members and
attenders. - Joint meetings with maintenance planning.
6SEB Committee Work in 2001/2002 (cont.)
- What was learned by the Committee last year?
- The meeting house is the heart and soul of IYM
and its preservation and care comes first.
- All work done on the meeting house should be
undertaken with care to preserve the original
design and construction whenever possible.
7SEB Committee Work in 2001/2002 (cont.)
- What was learned by the Committee last year?
- Although the Meeting House feeds the spiritual
needs of IYM the McNabb facility, falls far short
in meeting the physical needs.
8SEB Committee Work in 2001/2002 (cont.)
- Most members favor better eating and sleeping
facilities at IYM.
9SEB Committee Work in 2001/2002 (cont.)
- Most members favor better eating and sleeping
facilities at IYM.
10SEB Committee Work in 2001/2002 (cont.)
- Most members favor better eating and sleeping
facilities at IYM.
11SEB Committee Work in 2001/2002 (cont.)
- What was learned by the Committee last year?
- IYM also recognizes that the desires and wishes
of Clear Creek Monthly Meeting, our on-site
stewards, must be taken into account as we
consider the future of the McNabb site.
12SEB Committee Work in 2001/2002 (cont.)
- Be guided by Simplicity.
- Keep buildings subordinate and respectful to the
Meeting House in all ways, including style, size,
and position. - Use environmentally responsible materials, in
harmony with surrounding landscape. - Develop final design solutions with an
enlightened attitude that satisfies code
requirements, economic viability, and most
importantly, spiritual intent.
- Based on this learning, many ideas were explored.
Some of the key ideas guiding the current SEB
Committee included the following
13SEB Committee Work in 2001/2002 (cont.)
Specific Conditions for New Facilities
- Kitchen
- Develop a new professional style kitchen at grade
level using existing equipment as much as
practical.
- Dining Space
- Develop new Dining Room at grade level that can
seat a minimum of 120 to 150 persons comfortably
for a meal at one time.
- Sleeping Space
- Develop a variety of interior sleeping spaces for
a minimum of 100 persons in summer and 30 year
round.
- Restroom Shower Facilities
- Develop improved bathroom shower facilities for
year round use.
- Clear Creek
- Develop space that meets the needs of Clear Creek
Monthly Meeting.
14SEB Committee Minute/2002
- Based on this work, the following minute was
approved by IYM in 2002 - Over the past year, the Site Envisioning and
Building Committee has actively sought insights
into the needs and visions of Illinois Yearly
Meeting. We have been blessed with contributions
from two workshops, a focus group, Committee
meetings, field trips to other facilities,
meetings with 6 IYM Meetings, meetings with the
Quarterly and General Meeting in IYM as well as
input from other IYM Committees. We conducted a
survey of all people in the IYM. - By and large, we found a high consistency with
the various inputs and the more precise
questionnaire and its results. All these
activities and contributions have helped this
committee better understand the spiritual
strength of this place as well as its physical
limitations.
15SEB Committee Minute/2002 (cont.)
- Our top priorities are to preserve the Meeting
House, improve the eating and food preparations
facilities, improve sleeping quarters, improve
restroom and shower facilities. All these should
be done while addressing barriers to
accessibility, youth and adult program growth,
and year round use. - We seek to develop a plan that allows the
continuous contributions and guidance of our
future Friends. - At this 2002 Annual Session of IYM, we request
IYM continue the Site Envisioning and Building
Committee as an ad hoc committee. We request
approval of the attached program to guide next
years SE and B Committee as they produce site
development and building plans. - We recommend a thorough evaluation of all
existing facilities by a professional team
consisting of an architect, general contractor,
structural engineer, termite inspector, and a
member of the Site Envisioning and Building
Committee.
16 Site Envisioning Building Work in 2002/2003
17Past Year Activities/SEB Committee 2002/2003
- The SEB Ad Hoc Committee was continued at the
IYM 2002 Annual Meeting for another year and
given authorization to spend up to 10,000 for
building and site inspections in cooperation with
the Maintenance Planning Committee. The
following work was done over the course of the
year.
- Structural engineering inspections.
- Architectural review for entire site by architect
specializing in historic buildings including
building safety. - Termite and other insect damage inspection.
- A review of Meeting House repair by contractors
specializing in heavy timber construction. - Electrical evaluation for entire site.
- A consultation with the Bureau Putnam Counties
Health Departments.
18Recommendations
- In response to the guiding principals put forth
at IYM 2002 and the continuing work of this
committee, we propose that a new building(s) is
constructed (outlined in solid red) on the
southern portion of the newly acquired property
(outlined in dashed blue).
19Recommendations (cont.)
- Currently, we envision the building(s) will
- Be about 8,000 square feet.
- Include new kitchen dining facilities, limited
dormitory space and restroom/shower facility for
year round use and Clear Creek meeting space. - Cost roughly 1,000,000.
20Recommendations (cont.)
- Additionally, we recommend the following
initiatives are carried out over the next 12
months, in preparation for IYM 2004.
21Recommendations (cont.)
- Move the 2nd floor of the current dormitory
across the road to the S.E. quadrant of the north
parcel.
- To be used as summer sleeping accommodations.
22Recommendations (cont.)
- Retain the existing restroom facilities on lower
level of current dormitory as long as needed.
23Recommendations (cont.)
- Improve bathhouse facility on north parcel.
- Add outdoor hand washing facilities.
- Supplement with portable toilets as needed.
24Recommendations Summary
- In conclusion, we recommend on the following for
2003/2004
- Continuation of the Ad Hoc Site Envisioning
Building Committee. - Approval of 50,000 to move the upper portion of
the dormitory across the road, upgrade the Wash
House including additional hand washing
facilities, and cover the existing first floor
dormitory restrooms for continued use. - Authorization of the SEB Committee to interview
and hire an architect to complete a schematic
design of a new building(s) at a cost of
approximately 10,500 this design will be
presented at IYM 2004. - Approval for the start of a Capital Development
Campaign for a new building(s) with an initial
target of 1,000,000. - Funding for necessary repairs of our historic
Meetinghouse as determined by the Maintenance
Planning Committee.