IYM Site Envisioning - PowerPoint PPT Presentation

About This Presentation
Title:

IYM Site Envisioning

Description:

... contractor, structural engineer, termite inspector, and a member of the Site ... Termite and other insect damage inspection. ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 25
Provided by: barba183
Learn more at: http://quaker.org
Category:
Tags: iym | envisioning | site

less

Transcript and Presenter's Notes

Title: IYM Site Envisioning


1
IYM Site Envisioning Building Committee
  • Presentation for
  • IYM Annual Meeting
  • August 2003

2
Background and Purpose
  • At the 2001 IYM annual meeting, an ad-hoc Site
    Envisioning and Building Committee was
    established to explore potential visions for
    the building and grounds at McNabb.
  • This committee was composed of participants from
    IYM, the trustees and Clear Creek Monthly Meeting
    and was formed to meet, pray, discuss and
    develop a building plan for our joint future at
    McNabb, Illinois.
  • From 2001 IYM Minutes

3
Recap of Site Envisioning Building Work in
2001/2002
4
SEB Committee Work in 2001/2002
  • Following IYM 2001, the SEB Committee set out on
    a long and arduous process of learning about the
    wishes and hopes of all IYM members regarding the
    future of the McNabb site.

5
SEB Committee Work in 2001/2002
  • The following steps were taken
  • A visioning session with a cross-section of IYM
    members attendees.
  • A workshop at Blue River Quarterly.
  • Visits to monthly meetings.
  • Focus Group of members and attenders from several
    meetings.
  • A survey of all current IYM members and
    attenders.
  • Joint meetings with maintenance planning.

6
SEB Committee Work in 2001/2002 (cont.)
  • What was learned by the Committee last year?
  • The meeting house is the heart and soul of IYM
    and its preservation and care comes first.
  • All work done on the meeting house should be
    undertaken with care to preserve the original
    design and construction whenever possible.

7
SEB Committee Work in 2001/2002 (cont.)
  • What was learned by the Committee last year?
  • Although the Meeting House feeds the spiritual
    needs of IYM the McNabb facility, falls far short
    in meeting the physical needs.

8
SEB Committee Work in 2001/2002 (cont.)
  • Most members favor better eating and sleeping
    facilities at IYM.

9
SEB Committee Work in 2001/2002 (cont.)
  • Most members favor better eating and sleeping
    facilities at IYM.

10
SEB Committee Work in 2001/2002 (cont.)
  • Most members favor better eating and sleeping
    facilities at IYM.

11
SEB Committee Work in 2001/2002 (cont.)
  • What was learned by the Committee last year?
  • IYM also recognizes that the desires and wishes
    of Clear Creek Monthly Meeting, our on-site
    stewards, must be taken into account as we
    consider the future of the McNabb site.

12
SEB Committee Work in 2001/2002 (cont.)
  • Be guided by Simplicity.
  • Keep buildings subordinate and respectful to the
    Meeting House in all ways, including style, size,
    and position.
  • Use environmentally responsible materials, in
    harmony with surrounding landscape.
  • Develop final design solutions with an
    enlightened attitude that satisfies code
    requirements, economic viability, and most
    importantly, spiritual intent.
  • Based on this learning, many ideas were explored.
    Some of the key ideas guiding the current SEB
    Committee included the following

13
SEB Committee Work in 2001/2002 (cont.)
Specific Conditions for New Facilities
  • Kitchen
  • Develop a new professional style kitchen at grade
    level using existing equipment as much as
    practical.
  • Dining Space
  • Develop new Dining Room at grade level that can
    seat a minimum of 120 to 150 persons comfortably
    for a meal at one time.
  • Sleeping Space
  • Develop a variety of interior sleeping spaces for
    a minimum of 100 persons in summer and 30 year
    round.
  • Restroom Shower Facilities
  • Develop improved bathroom shower facilities for
    year round use.
  • Clear Creek
  • Develop space that meets the needs of Clear Creek
    Monthly Meeting.

14
SEB Committee Minute/2002
  • Based on this work, the following minute was
    approved by IYM in 2002
  • Over the past year, the Site Envisioning and
    Building Committee has actively sought insights
    into the needs and visions of Illinois Yearly
    Meeting. We have been blessed with contributions
    from two workshops, a focus group, Committee
    meetings, field trips to other facilities,
    meetings with 6 IYM Meetings, meetings with the
    Quarterly and General Meeting in IYM as well as
    input from other IYM Committees. We conducted a
    survey of all people in the IYM.
  • By and large, we found a high consistency with
    the various inputs and the more precise
    questionnaire and its results. All these
    activities and contributions have helped this
    committee better understand the spiritual
    strength of this place as well as its physical
    limitations.

15
SEB Committee Minute/2002 (cont.)
  • Our top priorities are to preserve the Meeting
    House, improve the eating and food preparations
    facilities, improve sleeping quarters, improve
    restroom and shower facilities. All these should
    be done while addressing barriers to
    accessibility, youth and adult program growth,
    and year round use.
  • We seek to develop a plan that allows the
    continuous contributions and guidance of our
    future Friends.
  • At this 2002 Annual Session of IYM, we request
    IYM continue the Site Envisioning and Building
    Committee as an ad hoc committee. We request
    approval of the attached program to guide next
    years SE and B Committee as they produce site
    development and building plans.
  • We recommend a thorough evaluation of all
    existing facilities by a professional team
    consisting of an architect, general contractor,
    structural engineer, termite inspector, and a
    member of the Site Envisioning and Building
    Committee.

16
Site Envisioning Building Work in 2002/2003
17
Past Year Activities/SEB Committee 2002/2003
  • The SEB Ad Hoc Committee was continued at the
    IYM 2002 Annual Meeting for another year and
    given authorization to spend up to 10,000 for
    building and site inspections in cooperation with
    the Maintenance Planning Committee. The
    following work was done over the course of the
    year.
  • Structural engineering inspections.
  • Architectural review for entire site by architect
    specializing in historic buildings including
    building safety.
  • Termite and other insect damage inspection.
  • A review of Meeting House repair by contractors
    specializing in heavy timber construction.
  • Electrical evaluation for entire site.
  • A consultation with the Bureau Putnam Counties
    Health Departments.

18
Recommendations
  • In response to the guiding principals put forth
    at IYM 2002 and the continuing work of this
    committee, we propose that a new building(s) is
    constructed (outlined in solid red) on the
    southern portion of the newly acquired property
    (outlined in dashed blue).

19
Recommendations (cont.)
  • Currently, we envision the building(s) will
  • Be about 8,000 square feet.
  • Include new kitchen dining facilities, limited
    dormitory space and restroom/shower facility for
    year round use and Clear Creek meeting space.
  • Cost roughly 1,000,000.

20
Recommendations (cont.)
  • Additionally, we recommend the following
    initiatives are carried out over the next 12
    months, in preparation for IYM 2004.

21
Recommendations (cont.)
  • Move the 2nd floor of the current dormitory
    across the road to the S.E. quadrant of the north
    parcel.
  • To be used as summer sleeping accommodations.

22
Recommendations (cont.)
  • Retain the existing restroom facilities on lower
    level of current dormitory as long as needed.

23
Recommendations (cont.)
  • Improve bathhouse facility on north parcel.
  • Add outdoor hand washing facilities.
  • Supplement with portable toilets as needed.

24
Recommendations Summary
  • In conclusion, we recommend on the following for
    2003/2004
  • Continuation of the Ad Hoc Site Envisioning
    Building Committee.
  • Approval of 50,000 to move the upper portion of
    the dormitory across the road, upgrade the Wash
    House including additional hand washing
    facilities, and cover the existing first floor
    dormitory restrooms for continued use.
  • Authorization of the SEB Committee to interview
    and hire an architect to complete a schematic
    design of a new building(s) at a cost of
    approximately 10,500 this design will be
    presented at IYM 2004.
  • Approval for the start of a Capital Development
    Campaign for a new building(s) with an initial
    target of 1,000,000.
  • Funding for necessary repairs of our historic
    Meetinghouse as determined by the Maintenance
    Planning Committee.
Write a Comment
User Comments (0)
About PowerShow.com