Welcome to Moab Khotsong - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Welcome to Moab Khotsong

Description:

In late 1989, a decision was made to exploit the Moab ... Car & bogey design, lifting cranes. Car & container design, stores layout. Car design, magazines ... – PowerPoint PPT presentation

Number of Views:560
Avg rating:3.0/5.0
Slides: 23
Provided by: cfa9
Category:

less

Transcript and Presenter's Notes

Title: Welcome to Moab Khotsong


1
Welcome to
The worlds deepest and longest single-lift shaft
2
Contents
  • Overview
  • Salient Facts
  • Growth approved capital projects (Moab Phase
    1)
  • Mining Layout
  • Moab Structure
  • Mine Stratigraphy
  • Mine Design
  • Moab Khotsong GOALS
  • Operating Statistics
  • Technology and Innovation
  • Moab Phase 2

3
Overview
In late 1989, a decision was made to exploit the
Moab mineral resource. Development at Moab
Khotsong commenced in 1991.
4
Salient facts
  • MEANING OF THE NAME
  • MOAB The name of the piece of ground on which
    the mine is situated.
  • The word means fertile ground
  • KHOTSONG Sotho word meaning place of peace
  • SHAFT SINKING Started January 1991
  • MAIN PRODUCTION Started January 1996 (11A)
  • SUB PRODUCTION To start October 2003
  • COST OF PROJECT R 3.8 Billion

Approved Capital Project (Life of Mine to
2015) Averages based on full production (2008
2013) m² /month 16 529 Gold Recovery/month 1
186 kg On Reef Grade 3 543 cm.g/t
5
Growth Approved Capital Projects
Capex
Life of Mine
Cash Cost
Incremental Oz
Total
Remaining
A96m
5 years to 2009
175/oz
Nil
2.1 Moz
Sunrise Dam Australia
R1.3b
5 years to 2012
158/oz
R485m
3.0 Moz
Mponeng South Africa
R460m
6 years to 2013
139/oz
R330m
2.7 Moz
Tau Tona South Africa
194m
4 years to 2013
176/oz
73m
2.8 Moz
CCV North America
R3.8bn
2015
102/oz
R1.1bn
4.5 Moz
Moab Khotsong (Phase 1) South Africa
6
Mining Layout
MAIN
68 LEVEL
70 LEVEL
LEGEND BLUE 2001 PURPLE 2002
SUB-RV
73 LEVEL
- 2 310
76 LEVEL
77 LEVEL
78 LEVEL
79 LEVEL
80 LEVEL
- 2 604
85 LEVEL
88 LEVEL
92 LEVEL
- 2 904
95 LEVEL
Bottom Reef Contour -3550m Below Surface
SUB-MM
98 LEVEL
100 LEV
101 LEV
- 3 054
101 LEV
12º BELT TWIN DECLINE MEN ROCK TRANSPORT
102 LEV
103LEV
103 LEV
107 LEV
111 LEV
113 LEV
114 LEV
- 3 522
115 LEV
Moab Phase 2
118 LEV
7
Structure
8
Moab Stratigraphy
Main Shaft
Sub RV Shaft
MB 10
Teespoed Fault
85 L
88 L
92 L
Buffels East Fault
MB 5
MB 10
MB 7/8
95 L
Siltstone/Shale
101 L
102 L
Siltstone/Shale
Moab Fault
Jersey Fault
103 L
Roodepoort Formation
Zuiping E Fault
9
Mine Design
  • Ore body situated between 2,000m and 3,800m below
    surface
  • The geological structure is complex and
    highly-faulted with large fault loss areas
  • It was decided to site the new shaft in Great
    Noligwas lease area. This provided the
    opportunity of extracting the shaft pillar before
    the shaft was excavated and equipped but required
    the development of long access tunnels to reef
  • The main surface shaft and subvertical RV shaft
    has been sunk and will be equipped down to a
    depth of 2,300m and 3,164m respectively

10
Overall Goals
11
Lost Time Injury Frequency Rate (LTIFR)
Moab Khotsong LTIFR lower than Ontario benchmark!
12
Schedule
13
Schedule Rock Vent Shaft Equipping
Jul Aug Sep Oct Nov
Dec Jan Feb
No.2
No.1
Headgear Orepass Rehabilitation
100
90
Bank Headgear Phase 1 Headgear Strip Equip
Phase 2 Stage Modification
100
Shaft Strip 103 to 76 Level Phase 1 Shaft Strip
76 to 103 Level Phase 2 Preparations for Spillage
Steel Brattice Wall Installation Install
Spillage Steel
100
Install Brattice Walls Final Headgear
Installation - Phase 3 Equip Shaft 76 to 103
Level Commission
10
14
Cash Costs
2
Average total cash costs at peak production -
R3,042/m
Stoping
13
Development
26
Horizontal and vertical
10
transport
Pumping/Ventilation and
Refrigeration
Production/Engineering
11
Services
6
Business Services/Health
10
Metallurgy
18
6
Other
2003 Real Terms
15
Technology Innovation
  • COMMUNICATION
  • Asset tracking
  • Tramming management
  • Backfill
  • In- workplace
  • CONSTRUCTION
  • Rails
  • Backfill
  • Large pipe columns
  • Cooling cars
  • Store / workshop
  • SEISMICITY
  • Monitor
  • Support / rating
  • Events analysis
  • EXTRACTION
  • PROCESS
  • Development
  • Stoping
  • ORE
  • HANDLING
  • Stope
  • Development
  • Horizontal
  • Vertical
  • TRANSPORT
  • People
  • Stope support
  • Explosives
  • Stores
  • Long material
  • ENVIRONMENT
  • Ventilation
  • Refrigeration
  • Dust
  • Noise

16
Focus area
Concept design
Technology/ Innovation
Funds available
Key Element
17
Focus area
Concept design
Technology/ Innovation
Funds available
Key Element
18
Growth Moab Phase 2
In South Africa, the dramatically higher rand
gold price has contributed to a further 11
million additional ounces of gold to reserves,
resulting in the possible development of six
deep-level mining projects, currently being
studied. AngloGold quarterly results31 October,
2002
19
Growth Moab Phase 2
Additional gold production
TauTona VCR shaft pillar and 66 level, area
A  
 0.3Moz
TauTona CLR 120-125 Level and 116 Level (East
of Bank Dyke)  
 1.4Moz
Moab Khotsong Phase 2 below 101 level  
 4.6Moz
20
Growth Moab Phase 2
Moab Phase 2 below 101 level means an
additional 4.6Moz of gold production should this
project go ahead. Moab Khotsong has the
potential to produce some 9Moz from the Phase 1
and 2 projects.Capex for Moab Phase 2 is
estimated at approximately R1.8bn. It will also
extend the LOM from 2015 2022. A full
feasibility study into this project is expected
to commence in 2003.
21
Moab Phase 2 Mine plan
22
Visit Schedule
Safety Brief
UNDERGROUND VISIT Thursday, November 21 2002
0600 Depart from Michaelangelo Hotel,
Sandton 0800 Breakfast on Arrival at Moab
Khotsong Welcome and Mine Overview by Danie
Spies, General Manager 0900 Proceed to
Changehouse 0930 Underground 95
Level 1130 Return to Surface 1230 Lunch
  • Wear safety P.P.E. provided.
  • Reflective bibs
  • Hearing protection
  • Gloves
  • Self contained self rescuers
  • Safety belts
  • Beware of moving machinery.
  • Stay with the group do not wander off.
  • No loose objects when near vertical excavations.
  • If you feel hot and become dizzy report to your
    guide without hesitation.
  • No smoking!
Write a Comment