Title: Proficiency Testing Updates
1Proficiency Testing Updates
- Susan E. Butts
- SCDHEC
- Office of Environmental Laboratory Certification
- August 21, 2008
2Proficiency Testing Program Overview
- Currently, Water Supply (WS) and Water Pollution
(WP) studies are required annually for
certification for drinking water and wastewater. - The annual DMRQA study is required for all major
dischargers and select minor dischargers.
3Proficiency Testing Program Overview
- Parameters and acceptance criteria are determined
by the The NELAC Institute (TNI) PT Board. - PT providers are approved through TNI using A2LA
as the accrediting authority
4Proficiency Testing Program Overview
- The laboratory must participate in a study that
begins and ends within the calendar year. - The PT results must be received in our office
from the PT provider by December 31st of the
calendar year.
5Proficiency Testing Providers
- Currently there are 7 PT providers approved by
A2LA - Absolute Standards
- Analytical Products Group, Inc. (APG)
- Environmental Resource Associates (ERA)
- Microcheck Inc. (Microbiological PTs only)
- NSI Solutions, Inc.
- Resource Technology Corporation (RTC)
- Wibby Environmental
6Proficiency Testing Reporting
- Remember to ask the PT Provider to submit the
results to South Carolina. - Many PT reports last year were never received
because SC was not selected as a recipient. - Dont forget to include your EPA Lab Code and SC
Laboratory ID number on the reports.
7Proficiency Testing Reporting
- Methods Update Rule (MUR) and reporting outdated
methods - If you report an outdated method, e.g. EPA Method
405.1 for BOD instead of SM 5210B, then you will
be sent a letter notifying you that you have
reported incorrect methods. - We are accepting these methods this year, but
will be enforcing the new methods next year.
8Proficiency Testing Reporting
- Edition of Standard Methods
- Be sure to compare your certificate with the
Edition of Standard Methods you are using. - If your certificate has not been updated, SOPs
will need to be submitted to make the change to
the correct revision. - If the incorrect edition is noted on the PT study
results, you may receive a letter notifying you
that there is a discrepancy.
9Proficiency Testing Records
- You must record all proficiency testing results
as you would a sample - These results must be maintained on file a
minimum of 3 years - We are reviewing PT records during on-site
evaluations
10Proficiency Testing Evaluation Results
- Reporting results incorrectly
- Not maintaining PT records
- Not treating PT as regular sample
11Water Supply Updates
- Effective January 1, 2009, new tables are
available which include PTs for the enumeration
of E. Coli and fecal coliform. - Also includes stringent criteria for the make-up
of the 10 sample set for the P/A PTs.
12Water Supply Updates
- Discussion by TNI PT Board for changes to the
acceptance criteria for the WS microbiological
samples to change to reporting 10 out of 10
correctly. - Currently, the criteria is to report 9 out of 10
correctly with no false negatives.
13Water Pollution Updates
- Also Effective January 1, 2009
- Added E. Coli as a PT requirement.
- Since fecal coliform is still the water quality
indicator for SC, the fecal coliform sample must
still be used. - Added extra PCB sample back into the PT sample
design
14DMRQA
15DMRQA
- Our office submits a list of DMRQA participants
to EPA - DMRQA is governed by EPA, we are only the state
coordinator for EPA - All DMRQA participants receive their DMRQA packet
in the mail from EPA - Please note that this does not necessarily go to
the laboratory it goes to the permit holder for
the facility. - Problem this year with receiving DMRQA packets
16DMRQA UpdatesChanges for DMRQA Study 29
- Chris Gorder is no longer working on DMRQA
- Any questions must be addressed to Patrick Yellin
with the USEPA - Address Verification Forms will no longer be
required to be submitted
17DMRQA Things to Remember
- You are to use the same method for submitting the
results as you utilize for your monthly DMRs - Please reference the permit number on ALL
correspondence including the corrective action
report
18DMRQA
- What needs to be included in the ungraded data
package? - Permittee Data Report Form
- Ungraded results for all laboratories including
all contract labs. - Completed checklists identifying the parameters
for the permit
19Permittee Data Report Form
20Permittee Data Report Form
21DMRQA Things to Remember
- The corrective action by the laboratory must
entail reviewing the procedures and identifying
the cause for the unacceptable results along with
the participation in another study - DMRQA samples must be analyzed by the same
individuals and or laboratories that routinely
perform the analysis for reporting on your DMR - Your USEPA Lab Code is the prime identifier for
the analytical results
22Whole Effluent Toxicity (WET) Proficiency Testing
- Currently, the only PT available for toxicity is
the DMRQA study - For part of the toxicity corrective action,
submit a copy of the original data corresponding
to the PT results. - For commercial labs performing the toxicity PTs,
have the PT provider submit a copy of the results
to our office. - The DMRQA final report is for the facility only
and will only include the data if it is reported
for the permit.
23Proficiency Testing Looking to the Future
- The TNI Proficiency Testing Board has approved
tables for solid and hazardous waste parameters. - Our certification program may decide to implement
these tables. - A new TNI Air PT Committee has been formed to
develop PT standards for air.
24Proficiency Testing Looking to the Future
- A new subcommittee has been formed to develop new
acceptance criteria for WET PTs. - A Microbiological PT subcommittee has been formed
to evaluate the acceptance criteria for
microbiological PTs for WS and WP.
25Proficiency Testing PT Frequency
- Hot Topic for the TNI PT Board and Committees
- Changing the TNI PT requirement in the new
standard from two out of three PT samples to
requiring one per year. -
26Future of DMRQA?
- Meeting between state DMRQA coordinators, PT
Providers, A2LA, and EPA to discuss the future of
the DMRQA Program - EPAs funding has been cut for the DMRQA program
- Patrick Yellin is solely responsible for program
- EPA feels program should move toward focusing on
lab proficiency, rather than DMR reporting
27Future of DMRQA?
- Everyone at the meeting was in agreement that
changes need to be made - Too much paperwork!
- Look for major changes to the DMRQA program may
start with Study 29, but most likely Study 30. - Possibly a subcommittee will be formed to
determine the future direction of the study.
28Contact Information
- WS
- Alfred Baquiran
- (803) 896-0977
- baquiraj_at_dhec.sc.gov
- WP and DMRQA
- Susan Butts
- (803) 896-0978
- buttsse_at_dhec.sc.gov
- www.scdhec.gov/labcert
29Questions???