Title: Dry Run 0


1
Dry Run 0
  • Week 13
  • BI test of...everything circulating beam all
    fixed displays and BI applications
  • OP directories for 2009, concentrators running
  • Need to have an operational Hyper Cycle (another
    one to test software)
  • MCS tests of
  • Check all existing critical settings after RBAC
    release
  • LHC BLMs, CISx (SMP parameters)....maybe
    collimators
  • MKI ExpertSettings and SoftstartSettings,
    BetsBem, BetsBei, IPOC, MKD and MKB critical
    settings test
  • Point 6 interlocked BPMs (BPMITLHC)....which role
    to be used ABT is for MCS-BT-LBDS
  • BPMSA.A4L6.B1/InterlockSetting
  • BPMSB.A4R6.B1/InterlockSetting
  • BPMSB.A4L6.B2/InterlockSetting
  • BPMSA.A4R6.B2/InterlockSettin
  • Only missing then for start-up maybe
    collimators, FEI

2
Program for Wednesday week 13 - BI
  • Check application logging fixed display
  • YASP orbit FIFO will have simulated data
  • Multiturn ? capture events for BPMs
  • BLMs running sums and capture events
  • NEED TO MAKE SURE THAT ENERGY IS LOGGED
  • Abortgap Monitor
  • BCTs
  • Wire scanners, synchrotron light monitor
  • LHC timing BTVs will play sequencer driven
    timing tables
  • Proxies ? fixed displays and application
    logging?
  • NO beam dumped events, NO post mortem events
  • Tune wait for Ralph...

3
Dry Run I injection equipment
  • week 14 (2nd and 3rd of April) and week 15 (for
    BI rather)
  • MKI 8 run it from control room
  • New softstart
  • OASIS BCT MKIs logging
  • Beam permit loops need to jumper out also
    injection BICs
  • Energy OK from energy from simulation
  • Application?? need to make sure that can run it
    through LSA
  • Application will be ready in week 16 only ? SM18
    shifts
  • Timing ready for week 14 Test mode stuff (need
    to verify!!) ? got email from Jean-Claude first
    version will be ready need to have a little
    application as well. Just ONE button (only as
    lhcop).
  • RF needs to generate the pre-pulse Andy told me
    should be OK
  • Fixed displays
  • TI 8 and TI 2
  • Critical settings for FEI? Prepare DC functions
    (cant run it...interlocked)
  • All BI, usual stuff
  • Logging for new BPMs...new logging for the PC
  • Injection BI again concentrators (BLM also
    capture and BPM), injection region BTVs, run
    injection tables
  • BTV proxies for all SPS BTVs

4
Dry Run II
  • Week 17 (23rd and 24th of April) - Injection
  • Beam 1 and beam 2 injections if possible with the
    BIS
  • MKI 2 like before
  • Week 17 LBDS software
  • LBDS monitoring application (no functional test
    yet, only communication) needs RBAC for the
    acknowledge
  • Arming of IPOC and BETS testable (BetsSim) ? test
    new sequences as far as possible
  • Also, the new CIBG generators and communication
    with it...for the time being LBDS jumpered out
  • XPOC (play-back mode), logging
  • Dump line BI with XPOC events (should trigger
    XPOC) fixed displays
  • FBCTs, BLMs, BTVs, BPMs (interlocked BPM), Abort
    gap monitor

5
Dry Run III
  • Week 20 - 22
  • TT40/TT60 beam tests
  • Will take out some time from CNGS for TT40.
  • Test of mastership business
  • Injection sequencer fully available
  • (new mastership request dont need to remove
    user request to become master, can become master
    also when in spare (if tagged TO_LHC, but no
    dynamic destinations under spare) new mastership
    request removes TI8_dump/TI2_dump request and
    sets requested batches to zero and does the same
    thing again when removing mastership SIS also
    verifies that if dynamic destination is TI8_dump
    or TI2_dump the downstream TEDs must be in)
  • Would be good to have first version of IQC
    integrated in injection sequencer
  • Date not defined yet during MD without
    extraction (long LHC cycle) requesting different
    filling patterns (different batches) under LHC
    mastership

6
Planning for the next stuff...
  • As soon as we have a little bit of experience
    with the first dry runs, we plan the next ones.
  • Beam dump we can only fully test from the control
    room from week 29 (beam 2).
  • Need to test as much as possible before...need to
    figure that out.
  • MKQA and AC Dipole not covered yet.