Title: DB2 UDB for zOS V8


1
DB2 UDB for z/OS V8
2
DB2 UDB for z/OS V8
Kick Off Meeting January 23,2007
3
  • Agenda
  • Introductions
  • Welcome
  • Overview
  • Communications and Information Sharing
  • Implementation Plan
  • Reference Material
  • Questions

4
  • Overview
  • New Mainframe Technology
  • zIPP (database) Specialty Engine
  • Improves Resource Optimization
  • Reduces overall costs
  • Product Support

5
  • Communications Information Sharing
  • Webpage
  • http//www.ct.gov/doit/cwp/view.asp?Q330566A228
    7
  • E-Alerts
  • IBM
  • February 1st 9am to 11am
  • Blog - Traction
  • http//www.ct. ??????

6
  • Communications Information Sharing
  • (continued)
  • Individual Agency Meetings
  • DOIT Contacts
  • Bill Katzer Tech Support DB2 Product Owner
  • Mark Kirschner Database Support DBA
  • Ed Fitch Application Development Support

7
  • Implementation Plan
  • DB2 V8 Implementation Strategy
  • Phase I Compatibility Mode
  • No new functions available.
  • Structured Query Language order by will now be
    done in Unicode, which will return rows in which
    the first 128 code points happen to match the
    first 128 code points of ASCII (numbers first).
    Hence, Unicode has a different collating sequence
    than EBCDIC. Also be aware that upper case comes
    before lower case.
  • Testing of new code base against current
    applications. Must be an extensive test prior to
    moving to Enable New Function Mode. Estimated
    time for this phase is three months.

8
  • Implementation Plan
  • DB2 V8 Implementation Strategy
  • Phase II Enable New Function Mode
  • New functions become available.
  • Once in Enable New Function Mode, returning to
    compatibility mode is not an option.
  • Query Management Facility (QMF) will be moved to
    Enable New Function Mode at the same time.
  • Will remain in Enable New Function Mode for a
    very short period of time one to two days.

9
  • Implementation Plan
  • DB2 V8 Implementation Strategy
  • Phase III - New Function Mode
  • Subsystem is moved to New Function Mode, thereby
    completing the migration Version 8.

10
  • Implementation Plan
  • Tech Support Implementation Plan
  • A new method to upgrade subsystems will require
    an additional set of libraries. This will allow
    the test systems to be migrated to a new version
    and allow testing by our clients while keeping
    production running on the current version.
  • This change will be coordinated through the DBAs
    .
  • New additional panel choices for QMF and
    Spufi(DB2I) will be available and must be used
    for the testing environment.

11
  • Implementation Plan
  • FYI
  • The minimum requirement for DB2 Connect is DB2
    Connect 8.2 FP10.
  • COBOL Per John Campbell at IBM
  • Existing COBOL load modules will run
    unchanged, but should be re-linked under LE. If a
    module is changed, then it will need to be
    compiled under Enterprise COBOL as it will have
    to run through the DB2 V8 Precompiler.

12
  • Reference Material
  • IBM Guides
  • SQL
  • Utility Guide and Reference
  • Migration Information
  • Release and Planning
  • Technical Preview

13
  • Reference Material (continued)
  • Additional Guides
  • DB2 UDB for z/OS Version 8 Planning for
    Migration
  • DB2 UDB for z/OS Version 8 - The Migration
    Process, Including Tips and Hints Along the Way
  • DB2 UDB for z/OS Version 8 Everything You Ever
    Wanted to Know,. And More
  • Greatest Hits and Myths DB2 UDB for z/OS
    Version 8 and Beyond
  • DB2 UDB for z/OS Version 8 Overview
Write a Comment
User Comments (0)
About PowerShow.com