LCLS XRAY INSTALLATION READINESS REVIEW FEENEH Alignment - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

LCLS XRAY INSTALLATION READINESS REVIEW FEENEH Alignment

Description:

Automatic level: Leica DNA03. Connection. Portable wire. Total stations: Leica TC2002 and TDA5005. Optical plummet. Local Alignment. Optical tooling ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 10
Provided by: hel85
Category:

less

Transcript and Presenter's Notes

Title: LCLS XRAY INSTALLATION READINESS REVIEW FEENEH Alignment


1
LCLS X-RAY INSTALLATION READINESS REVIEW
(FEE-NEH)Alignment
  • November 7, 2008
  • Catherine LeCocq
  • SLAC
  • Alignment Engineering Group

2
AEG Contact with LCLS
  • Daily
  • Tailgate meeting
  • Weekly
  • Tuesday LCLS LTU-NEH installation meeting
  • Friday LCLS/TCCo/CEF Installation meeting
  • Email summary of field activities
  • LCLS Sharepoint Alignment Site
  • LCLS Monumentation Status.doc

3
FEE-NEH Monumentation
Typical 1 ½ floor and wall monuments,
see http//www-group.slac.stanford.edu/met/Align/
TechAnalysis/Monumentation_Drilling_Specifications
.pdf
4
FEE-NEH Survey Network
5
Instrumentation
  • Primary monumentation, layout and mapping
  • Laser tracker FARO SI
  • Automatic level Leica DNA03
  • Connection
  • Portable wire
  • Total stations Leica TC2002 and TDA5005
  • Optical plummet
  • Local Alignment
  • Optical tooling
  • Portable arm FARO Platinum 4, 8 and 12
  • Other

6
Coordinate Systems
  • SLC
  • Used internally by AEG
  • LCLS (Undulator)
  • LCLS-TN-03-8
  • Used for the beamline downstream of the muon-plug
    wall (LTU, Undulator, Beam Dump, X-ray optics,
    Near Hall, and Far Hall)
  • XTOD FEE local coordinate system
  • Origin puts STA-100 at z 723 m
  • LUSI
  • Origin at HOMS M2 mirror

7
LCLS LUSI Relation
DS-391-000-36 Figure 2
8
Layout Information
Template info for first half of the FEE Contact
Pat Duffy
9
Conclusion
  • Technical Aspects
  • Contact Hal Tompkins
  • Safety Administrative Aspects
  • WAF for the FEE-NEH
  • WAF for X-Ray tunnel - FEH
  • Personnel Financial Aspects
  • 2-4 field crews
  • 4 work orders for Network and Monumentation
    covering FEE, NEH, X-Ray tunnel and FEH
Write a Comment
User Comments (0)
About PowerShow.com