MOTAPA DIAMONDS INC
  • Listed on TSX Venture Exchange (symbol MTP)
  • Diamond exploration interests in 9 million
    hectares in Africa
  • Quality management team and board of directors
  • Proven track record of effective prospect
    generation
  • Alliances
  • Mineral Services International Generates
    African diamond projects exclusively for Motapa
  • Funding Joint Venture Partners
  • Cameco/Pitchstone Gabon uranium project
  • Namdeb Namibian diamond project
  • Stornoway Diamond corp. Botswana diamond
    project
  • Bannockburn Resources ltd. Lesotho Mothae
    kimberlite project

Chairman Dr. John Gurney, Director Dr. Theo Laub,
and CEO, Dr. Larry Ott inspect kimberlite
discovery on the Kavango, Namibia project
Reconnaissance Sampling in the Kalahari desert
3
Exploration Projects
9 million hectares of diamond prospective
terrain.
Lebiri, Gabon
Western Mozambique
Mulonga Plain JV, Zambia
Kavango, Namibia
Mothae, Lesotho
Botswana Licenses
4
Project Status
5
Gabon Lebiri License Kimberlitic Chromites in
Soil Anomaly 1530
6
Sua Pan Airborne Gravity/Magnetic Survey Interp.
7
Kavango Project Garnet Compositions
mscpt-ser04
8
Kavango Project, Namibia
  • Namdeb has earned a 51 interest by committing to
    fund a US4.8m work program over 24 months.
  • Objective to develop and test new kimberlite
    targets.
  • Year 1 will concentrating on drilling to close
    off Omatako anomaly and on geophysical
    orientation work.
  • Airborne survey work and drilling planned for
    Year 2.
  • Namdeb can increase interest to 65 by fully
    funding to feasibility

9
Mulonga Plain Joint Venture, Zambia
10
LESOTHO KIMBERLITE LOCALITY MAP
11
MOTHAE KIMBERLITE OVERVIEW
  • Discovered in 1961 by Basutoland Diamond Ltd.
    Located 6.5 kilometers north-west of the Letseng
    diamond mine.
  • The pipe is 8.8 ha in area, and is essentially
    exposed at surface (covered by a thin veneer of
    gravels and peat).
  • Historical prospecting inadequate to determine
    economic potential - recovered approx 300 carats
    and indicated grades of 0.27 to 4.95 cpht
    (average 2.28 cpht).
  • The Mothae kimberlite has potential to be a world
    class diamond producer
  • High tonnage potential
  • Grade consistent with Letseng mine potential to
    be higher.
  • Sampling needed to determine diamond value.

Overburden on kimberlite (right) and basalt
(left) at Mothae contact
Small white macle recovered by artisanal digger
in July 2006
12
MOTHAE SURFACE EXPRESSION
  • Determination of the diamond grade and value at
    Mothae will require a large bulk sample of the
    kimberlite - on the order of 100,000 tonnes.
  • This assessment of economic potential can be made
    relatively quickly and at modest cost (estimated
    at US8.0 million).
  • Mothae is a pre-feasibility diamond project ready
    to go.

13
THE LETSENG DIAMOND MINE
Letseng Main Pit
  • Returned to production by JCI in 2004.
  • Controlling interest recently bought by Gem
    Diamond Mining Company of Africa Limited (Gem)
    for R879.5 million.
  • Main pipe (15.9ha) and a satellite pipe (4.7ha).
  • Diamond grades are between 2 and 2.5 carats per
    hundred tonnes of kimberlite, diamond value is
    reported to average US1,889 per carat.
  • The high average diamond value is a result of
    consistent but infrequent recovery of very large,
    exceptional quality type IIA diamonds.

171 ct type IIA diamond from the Letseng Mine
14
Expected Letseng-Type Diamond Size Distribution
Sample Size in Carats Recovered
  • The number of large stones recovered from a 300
    carat parcel is too low to provide an indication
    of the presence of large stones.
  • A parcel size of 1000 carats is necessary to
    determine whether an ultra-coarse diamond
    population is present, but will not reliably show
    value potential.
  • If an ultra-coarse diamond population is present,
    a 3000 carat parcel should provide an indication
    of value potential. A larger parcel will be
    needed to determine average stone value.

15
CURRENT Work Program
16
Motapas Competitive Advantage
  • Experienced and highly qualified board and
    executive team
  • Outstanding property portfolio
  • Approx. US9.0 million in working capital
  • Corporate Alliances and Partnerships
  • Mineral Services
  • Namdeb
  • Stornoway Diamonds
  • Cameco Corp, Pitchstone Exploration
  • Bannockburn Resources

Listed on TSX-V Ticker MTP
Common shares outstanding 38,429,315 Fully
diluted 51,032,525