Progress Report!for 2003 INM - PowerPoint PPT Presentation

About This Presentation
Title:

Progress Report!for 2003 INM

Description:

The operational system is still based on HIRLAM version 4.6.2 (see previous LAM Newsletters) ... Rash-Kristjansson scheme is still under testing both in long ... – PowerPoint PPT presentation

Number of Views:15
Avg rating:3.0/5.0
Slides: 10
Provided by: ernestorod
Category:
Tags: inm | progress | report | still

less

Transcript and Presenter's Notes

Title: Progress Report!for 2003 INM


1
Progress Report!for 2003 INM
  • e.rodriguez_at_inm.es

2
Operational system in use at the end of 2003 (I)
  • The operational system is still based on HIRLAM
    version 4.6.2 (see previous LAM Newsletters). Two
    suites are currently operational at INM OPR (0.5
    degrees, 31L) and HIR (0.2 degrees, 31L), (See
    figures for integration domains). The new
    mainframe (CRAY X1) was installed this summer and
    our group is embarked, first, on the acceptance
    process and, second, on the implementation of a
    new suite on the X1. An independent 3-hourly
    assimilation with short cut-off time is also run
    to assist nowcasting activities.
  • Apart from its use in the operational forecasting
    system, HIRLAM data are also used as input to
    different applications a) trajectories and
    diffusion models to determine hazardous
    emissions b) forecast automation generation of
    written forecasts from direct NWP outputs and
    statistical adapted products based on Multimeteo
    software c) sea state applications.

3
Operational system in use at the end of 2003 (II)
4
Features of the new CRAY X1 and of the
foreseeable new suite
  • CRAY X1 (40 vector processors) July 2003 CRAY
    X1E (32 processors) End of 2004
  • The first implementation supplies sustained 140
    Gflops using the IFS code, whereas the final one
    supplies 360 Gflops.
  • Tentatively and depending on the ongoing tests,
    the INMs assimilation and forecasting system
    will consist of a synoptic suite with European
    North Atlantic domain (approx. 726 x 335 x 60,
    0.15º) and a mesoscale suite with Iberian
    peninsula domain (0.07º). Latest version of
    HIRLAM available at the implementation time
    (3D-VAR assim., best physics options,...) will be
    used (6.2?).

5
Verification and archive
  • The HIRLAM_INM verification bulletin can be
    consulted on-line http//www.inm.es
  • The operational archive for HIRLAM 0.5º (0.2º)
    dates back to March 1995 (October 1995).

6
(No Transcript)
7
Research and development (I)
  • Condensation processes. The Kain-FritschRash-Kris
    tjansson scheme is still under testing both in
    long runs and case studies previous to its
    implementation on the reference system
    (García-Moya, Calvo). Contribution to the EUROCS
    EU Project (with 1D and 3D simulations) (Calvo).
  • Surface issues (analysis parameterization) i)
    alternative snow depth analysis based on OI (see
    (Cansado Navascués 2003)) ii) Re-computation
    of background error statistics for T2m and RH2m
    analyses (Martín) iii) Explicit soil moisture
    freezing/melting algorithm (see (Parodi et al.
    2003)) iv) Impact of new physiographic databases
    (Fernández) v) ELDAS EU Project to develop and
    test a new algorithm for soil moisture
    assimilation (Parodi, Navascués, Rodríguez) vi)
    Implementation and tests of a new soil moisture
    variational assimilation algorithm (see (Balsamo
    et. al. 2003)) (Navascués) vii) surface analysis
    as nowcasting tool (Cansado) viii) Evaluation of
    the surface package in seasonal runs and against
    fields experiments (EFEDA, RhoneAggr) (Parodi,
    Navascués, Rodriguez).

8
Research and development (II)
  • Upper air analysis work on the assimilation of
    GB GPS (Sánchez, Navascués) (TOUGH Project),
    radar wind and high resolution winds from
    geostationary satellite (Geijo)
  • Coupling physics-dynamics in the frame of the
    2TLSLSI scheme. Noise removal in high resolution
    (Martínez)
  • Preparation for short range EPS, based on a
    multi-analysis, multi-model, multi-BCs ensemble
    (Santos, Santos, Escribá García-Moya).

9
Future
  • The arrival of the new computer (CRAY X1) and the
    tasks associated with the installation and
    testing of the new suite will condition the
    activity of the INMs group along the next year.
    Provisional schedule New deterministic suite
    (Jan. 2004), experimental SREPS (Dec. 2004),
    operational SREPS (Dec. 2005).
  • Most of the research and development activity
    will be developed in the frame of the next
    HIRLAM6 project, particularly in the area of
    physics and surface assimilation.
Write a Comment
User Comments (0)
About PowerShow.com