The Woodrow Wilson Memorial Bridge Project - PowerPoint PPT Presentation

About This Presentation
Title:

The Woodrow Wilson Memorial Bridge Project

Description:

Washington D.C. Approximately 200,000 vehicles per day ... Will increase the suburbanization of Washington D.C. Symbolic. In D.C. it had the opportunity to be a ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 18
Provided by: michael1009
Learn more at: https://www.ce.jhu.edu
Category:

less

Transcript and Presenter's Notes

Title: The Woodrow Wilson Memorial Bridge Project


1
The Woodrow Wilson Memorial Bridge Project
  • Rich Carmona
  • Michael Francis

2
The Original Bridge
  • Completed 1964
  • Total Length 1798m
  • Width 33.5m
  • 6 Lanes of Traffic
  • Height 50 ft
  • Designed to carry 75,000 vehicles per day
  • 15 Million

3
Current Conditions In Washington D.C.
  • Approximately 200,000 vehicles per day
  • Estimated to grow to 295,000 per day by 2020
  • Trucks will have to be prohibited in 2004
  • Cost of rehabilitation is equal to the cost of a
    new bridge
  • Structural damage caused by dynamic vibrations
    from overloading

4
New Bridge
  • Total Length 1829m
  • Width 72.3m
  • 12 Lanes
  • Height 70 ft
  • 18 Spans
  • Box-girder construction
  • Cost 492 million

5
Bascule Span Bridge
  • 17th Street Bridge (completed 2001)
  • Total Length 582m
  • Width - 32.6m
  • 4 Lanes
  • Height 55 ft
  • Variable depth segmental construction
  • Cost - 65 million

6
Parsons Transportation
  • New Tacoma Narrows Bridge (completed 2007)
  • Total Length 1645m
  • Main Span 853m
  • Width 20.1m
  • 3 Lanes
  • Deck stiffened suspension
  • 615 Million

7
Cost Comparison
  • Both bascule spans are much cheaper per square
    foot
  • Slightly higher costs of the new Wilson Bridge
    can be attributed to its greater height

8
Scientific
9
Social Impact
  • Traffic Lanes will increase from 6 to 12
  • Eventually there will be mass transit over the
    bridge

10
Bridge Openings
  • The new bridge is taller to allow for fewer
    openings of the drawbridge which means less
    standstills.
  • The backups are regularly miles long in both
    directions as eight lanes of beltway squeeze into
    six.

11
Social Impact
  • Alternatives was to reroute trucks to I-395,
    I-295 and Route 301.
  • About 20,000 trucks a day could be diverted from
    the Beltway. 58 Billion of trucked GDP crossed
    the bridge in 1993.
  • The diversion of traffic from I-95 would have bad
    effects on the economy

12
Symbolic
  • Symbolic of the politics and red tape of D.C.
  • Looking towards the past
  • Will increase the suburbanization of Washington
    D.C.

13
Symbolic
  • In D.C. it had the opportunity to be a memorable
    structure-identifying mark of the region

14
Structural Art
  • Does our bridge qualify as structural art?

15
Structural Art
  • Park within a structure?
  • Is the bridge honest with us?
  • Does it accurately convey the forces of the
    bridge?

16
Does it Matter?
  • Utilitarian purpose of a bridge- to get people
    and goods from here to there, in cars, trucks,
    bicycles or whatever.
  • Aesthetic and symbolic- to make these crossings
    meaningful to participants and also to distant
    observers in boats, on river embankments, in
    neighboring buildings

17
  • Change is not worthwhile unless it shows
    improvement
  • -President Woodrow Wilson
Write a Comment
User Comments (0)
About PowerShow.com