T' P' Yunck - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

T' P' Yunck

Description:

480 km circular polar orbit (89 ) ~200 km separation, 50 km ... The Project policy for activating occultations is still under review ... – PowerPoint PPT presentation

Number of Views:9
Avg rating:3.0/5.0
Slides: 12
Provided by: thomas323
Category:
Tags: activating | yunck

less

Transcript and Presenter's Notes

Title: T' P' Yunck


1
GRACE Occultation Update
T. P. Yunck COSMIC Science Workshop Boulder,
Colorado 21 August 2002
SAC-C
CHAMP
2
The CHAMP Spacecraft
3
(No Transcript)
4
Gravity Recovery and Climate Experiment GRACE
Primary Mission Objective Produce a new model
of the Earth's gravity field with unprecedent
accuracy every 12 to 25 days for five years
  • System Characterics
  • 480 km circular polar orbit (89)
  • 200 km separation, 50 km
  • 24 and 32 GHz crosslink range, with 1 micron
    accuracy
  • Occultation antennas fore and aft
  • BlackJack receiver performs crosslink range
    measurement, zenith POD tracking, occultation
    data collection, star tracker processing

5
(No Transcript)
6
(No Transcript)
7
(No Transcript)
8
GRACE GPS Antennas
Occultation
Zenith POD
9
(No Transcript)
10
  • GRACE Status
  • GRACE was launched without occultation software
    installed in the receivers
  • A new software upload, including occultation
    software, is planned for the last week of
    September
  • GRACE is still in the commissioning phase,
    performing calibrations and tuning its modes of
    operation
  • A good deal of preliminary gravity data has been
    acquired and some early gravity field solutions
    have been generated
  • A review will be held in late September to
    evaluate readiness for transition from
    commissioning phase to validation phase
  • Validation phase is followed by Observation
    phase operationally, these phases are
    essentially the same

11
  • GRACE Status (cont.)
  • The Project policy for activating occultations is
    still under review
  • There are, however, some guiding principles
  • The gravity commissioning phase must be completed
  • No actions supporting occultations will be taken
    that could compromise the prime gravity mission
  • A good set of clean gravity data should be
    acquired first
  • The decision will be made jointly by the PI
    (Byron Tapley) and the Co-PI (Christoph Reigber)