Title: INDEPTH ANALYSIS OF WORKING OF CABINMAN LEVERMAN POINTSMANSHUNTING S
1IN-DEPTH ANALYSIS OF WORKING OF
OPERATING STAFF
IN STATIONS/YARDS
SOUTH EAST CENTRAL RAILWAY
2CATEGORIES
SECR
- STATION MASTER
- SWITCHMAN
- CABINMAN
- SHUNTMAN
- LEVERMAN
- POINTSMAN
- SHUNTI NG JAMADAR
- YARD MASTER
3CADRE STRENGTH OF OPERATING STAFF
SECR
4SECR
AREA OF RESEARCH
ZERO BASED WORK STUDY WAS CONDUCTED ON STATIONS
OF BILASPUR RAIPUR DIVISION OF SECR
REPRESENTING FOLLOWING DIFFERENT ASPECTS OF TRAIN
OPERATION -
END CABIN STATION IN THIRD LINE TERRITORY
END CABIN STATION IN DOUBLE LINE TERRITORY
END CABIN IN BRANCH DOUBLE LINE TERRITORY
END PANEL STATION IN THIRD LINE TERRITORY
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
RRI STATION IN THIRD LINE TERRITORY
5SECR
METHOD OF RESEARCH
ONE STATION IN EACH CATEGORY WAS SELECTED AND
STUDY TEAM SENT TO THESE STATIONS TO OBSERVE THE
ACTUAL DEPLOYMENT OF MANPOWER, THEIR WORKING
WORKLOAD INVOLVED.
THERE IS NO LAID DOWN YARDSTICK FOR TRAFFIC STAFF
OF STATIONS. NOR BENCHMARK REPORT EXISTS FOR
COMPARISON WITH ALL INDIA BEST OR AVERAGE
BENCHMARK.
HENCE ZERO BASED WORK STUDY WAS CONDUCTED ALONG
WITH REVIEW OF WORK STUDY REPORT AVAILABLE ON THE
SUBJECT.
FACTORS LIKE REST GIVER AND LEAVE RESERVE IS
INVOLVED FOR ALL STATION TRAFFIC STAFF. RG IS
FIXED 16.66 AND LR IS FIXED AT 25
HOER PROVISIONS APPLICABLE WERE KEPT IN VIEW
6SECR
END CABIN STATION IN THIRD LINE TERRITORY
AKALTARA
AKT
7BRIEF DETAILS
END CABIN STATION IN THIRD LINE TERRITORY
SECR
- 6 LINE B CLASS STATION
- ON A ROUTE OF MUMBAI-HOWRAH ON THIRD LINE
BETWEEN BILASPUR CHAMPA - STATION COMPLEX COMPLRISES OF AKT STATION, LATIA
BLOCK CABIN, EXCHANGE YARD, AND IN PLANT LIL
CEMENT SIDING. - ONE GOODS SHED ONE COAL LOADING SIDING ALSO
EXIST. - ONE Y CURVE CONNECTS LATIA BLOCK CABIN AND
AKALTARA WEST CABIN. - EXCHANGE YARD CABIN SERVES LIL SIDING AND
CONTROLS THE MOVEMENTS OF IN PLANT/LIL SIDING. - THERE IS A SPECIAL CLASS INTERLOCKED EAST CABIN
OPERATED LEVEL CROSSING GATE IN THE YARD. THE
CABIN IS MANNED BY A SWITCHMAN WITHOUT ANY HELPER - BALLAST SIDING IS UNDER COMPLETION.
AKT
8UTILIZATION OF LINE CAPACITY
END CABIN STATION IN THIRD LINE TERRITORY
SECR
SECTION CPH - BSP
AKT
9ACTIVITY
END CABIN STATION IN THIRD LINE TERRITORY
SECR
- A. UTILIZATION OF GOODS SHED
- INWARD TRAFFIC 9 RAKES
- OUTWARD TRAFFIC 6.8 RAKES
- B. LIL SIDING MOVEMENTS
- AVERAGE OUTWARD INWARD TRAFFIC -
129.9 WAGON - C. EXCHANGE YARD, ENGINEERING SIDING
- TRAFFIC SIDING COMMISSIONED ON
31.01.07 - FEB 07 6 TRAINS
- MARCH 07 - 7 TRAINS
- D AVERAGE NUMBER OF TRAINS PASSING UP DN PER
DAY - AKT STATION - 75
- LATIA BLOCK CABIN - 75
AKT
10OPERATING STAFF DEPLOYED
END CABIN STATION IN THIRD LINE TERRITORY
SECR
- STATION MASTER
- SWITCHMAN
- CABINMAN
AKT
11DISTRIBUTION OF MAN POWER
SECR
END CABIN STATION IN THIRD LINE TERRITORY
AKT
12SECR
END CABIN STATION IN THIRD LINE TERRITORY
KEEPING THE ACTIVITIES IN VIEW MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS UNDER.
AKT
13SECR
END CABIN STATION IN THIRD LINE TERRITORY
SM
AKT
14END CABIN STATION IN THIRD LINE TERRITORY
SECR
PM/LM/CM
AKT
15END CABIN STATION IN THIRD LINE TERRITORY
SECR
SWM
AKT
16ANALYSIS NEED BASED MANPOWER REQUIREMENT
END CABIN STATION IN THIRD LINE TERRITORY
SECR
- INTRODUCTIN OF NEW TECHNOLOGY
- Introduction of solid state centre panel
interlocking replacing both end lever cabin
SMs slide control - CLOSURE OF ACTIVITY
- CCI Siding
- Two lever cabins 1 centre SM slide system
- OUT SOURCING - Nil
- SYSTEM CHANGE
- Additional work load of East Cabin SWM will be
switched over to newly created Level Crossing
Gate Keeper - Technological sophistication through Solid State
Interlocking are being established to nab the
detention to trains and ease to the work load. - For new LC gate 31 Gateman post is to be
created. - For additional ASM due to central panel
interlocking a job analysis will have to be
conducted on introduction of working.
AKT
17CONCLUSION
END CABIN STATION IN THIRD LINE TERRITORY
SECR
- WITH THE EXISTISNG PATTERN OF WORKING/ WORKLOAD
FOLLOWING NUMBER OF STAFF ARE SURPLUS - - ASM 1 CLASSIFICATION TO BE CHANGED TO
- PM 1 EI IN LIL SIDING
- WITH THE INTRODUCTION OF CENTRAL PANEL WORKING
TWO END CABINS WILL BE CLOSED FOLLOWING POSTS
WILL BE SURPLUS - -
- SWM 8
- 3. FOR LC GATE 31 GK/PM IS TO BE CREATED.
AKT
18SECR
END CABIN STATION IN DOUBLE LINE TERRITORY
RAIGARH
RIG
19BRIEF DETAILS
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
- 8 LINE B CLASS STATION
- CREW CHANGING POINT
- DIVISIONAL CAUTION ORDER ISSUING STATION
- CENTRAL PANEL WORK SANCTIONED
- STATION COMPLEX INCLUDES GOODS SHED, END
ATTENTION - EXAMINATION LINE.
RIG
20UTILIZATION OF LINE CAPACITY
SECR
SECTION JSG - CPH
RIG
21ACTIVITIES
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
- AVERAGE NUMBER OF 74 GOODS TRAIN AND 38 COACHING
TRAINS IN UP AND DN DIRECTIONS. - TWO TERMINAL COACHING LINES FOR END ATTENTION
- IN GOODS SHED YARD MONTHLY AVERAGE 20 22
RKES - END CABIN LEVER OPERATED
RIG
22OPERATING STAFF DEPLOYED
END CABIN STATION IN THIRD LINE TERRITORY
SECR
- STATION MASTER
- SWITCHMAN
- CABINMAN
- LEVERMAN
- POINTSMAN
- SHUNTING JAMADAR
RIG
23DISTRIBUTION OF MAN POWER
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
RIG
24END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW THE MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS UNDER.
RIG
25END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
SM
RIG
26END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
PM/LM/CM
RIG
27END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
SWM
RIG
28END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
SHUNTING JAMADAR
RIG
29ANALYSIS NEED BASED MANPOWER REQUIREMENT
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
- INTRODUCTIN OF NEW TECHNOLOGY
- Solid state centre panel interlocking replacing
both end lever cabin SMs slide control is
being introduced -
- CLOSURE OF ACTIVITY
- TIMBER SIDING
- Tower car siding shunting neck rarely used
-
- OUT SOURCING - Nil
- SYSTEM CHANGE
- Coaching Complex planned
- COMMON CREW BOOKING IS NOW BEING DONE BY ROSTER
CLERK IN CREW LOBBY INSTEAD OF ASM
RIG
30CONCLUSION
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
- WITH THE EXISTISNG PATTERN OF WORKING/WORKLOAD
FOLLOWING NUMBER OF STAFF ARE SURPLUS/SHORT - SURPLUS SM 4 PM 6,
- SHORTFALL SWM 1
- WITH THE INTRODUCTION OF CENTRAL PANEL WORKING
TWO END CABINS WILL BE CLOSED FOLLOWING POINTS
WILL BE SURPLUS - -
- SWM 7
-
HOME
RIG
31SECR
END CABIN IN BRANCH LINE TERRITORY
KOTMA
KTMA
32BRIEF DETAILS
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
- 5 LINE B CLASS STATION ON APR-CHRM SECTION
- GOVINDA SIDING OF SECL TAKES OFF IN EXTENSION OF
LINE NO. 5 - STATION IS HAVING LEVER OPERATED END CABINS
KTMA
33UTILIZATION OF LINE CAPACITY
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
STATION KTMA
KTMA
34ACTIVITY
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
KTMA
35OPERATING STAFF DEPLOYED
END CABIN STATION IN THIRD LINE TERRITORY
SECR
- STATION MASTER
- SWITCHMAN
- POINTSMAN
KTMA
36DISTRIBUTION OF MAN POWER
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
KTMA
37END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW THE MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS UNDER.
KTMA
38END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
KTMA
39ANALYSIS NEED BASED MANPOWER REQUIREMENT
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
- INTRODUCTIN OF NEW TECHNOLOGY
- NO PROPOSAL
- CLOSURE OF ACTIVITY
- ONE COAL SIDING HAS BEEN CLOSED
- OUT SOURCING - Nil
- SYSTEM CHANGE
- 1) Commercial activities earlier performed by
- ASM is now being done
by Commercial staff.
KTMA
40END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
CONCLUSION
- WITH THE EXISTISNG PATTERN OF WORKING/ WORKLOAD
FOLLOWING NUMBER OF STAFF ARE SURPLUS - - ASM 1
- PM/LM/CM 4
KTMA
41SECR
END PANEL STATION IN THIRD LINE TERRITORY
NAILA
NIA
42BRIEF DETAILS
END PANEL STATION IN THIRD LINE TERRITORY
SECR
- 5 LINE B CLASS STATION ON HWH-MUMBAI TRUNK
ROUTE - STATION COMPLEX COMPRISES OF NIA STATION, GOODS
SHED AND INTERLOCKED GATE AT WEST END.
NIA
43UTILIZATION OF LINE CAPACITY
END PANEL STATION IN THIRD LINE TERRITORY
SECR
SECTION CPH - BSP
NIA
44ACTIVITIES
END PANEL STATION IN THIRD LINE TERRITORY
SECR
- 150 TRAINS PER DAY BOTH UP DN DIRECTION
INCLUDING 32 COACHING TRAINS. - TWO RAKES PER MONTH IN GOODS SHED
NIA
45OPERATING STAFF DEPLOYED
END PANEL STATION IN THIRD LINE TERRITORY
SECR
- STATION MASTER
- POINTSMAN
- PORTER
NIA
46DISTRIBUTION OF MAN POWER
END PANEL STATION IN THIRD LINE TERRITORY
SECR
NIA
47END PANEL STATION IN THIRD LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS FOLLOWS -
NIA
48END PANEL STATION IN THIRD LINE TERRITORY
SECR
ASM
NIA
49END PANEL STATION IN THIRD LINE TERRITORY
SECR
PM/LM/CM
NIA
50ANALYSIS NEED BASED MANPOWER REQUIREMENT
END PANEL STATION IN THIRD LINE TERRITORY
SECR
- INTRODUCTIN OF NEW TECHNOLOGY - NIL
-
- CLOSURE OF ACTIVITY - NIL
- OUT SOURCING - Nil
- SYSTEM CHANGE - NIL
NIA
51CONCLUSION
END PANEL STATION IN THIRD LINE TERRITORY
SECR
- 1. WITH THE EXISTISNG PATTERN OF WORKING/WORKLOAD
FOLLOWING NUMBER OF STAFF ARE SURPLUS - PM - 2
- 2. WITH THE END PANEL WORKING MAN POWER
REQUIREMENT REMAINED THE SAME. INSTEAD OF SWM,
ASM IS MANNING. THEREFORE, CENTRAL PANEL SHOULD
BE INTRODUCED, WHEREVER POSSIBLE.
NIA
52SECR
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
DADHAPARA
DPH
53BRIEF DETAILS
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
- 6 LINE B CLASS STATION
- INTER-DIVISIONAL INTERCHANGE POINT
- STATION COMPLEX COMPRISES OF STATION HIRRI
SIDING OF BHILAI STEEL PLANT - ONE GOODS LINE AND COAL WASHERY SIDING ARE COMING
UP - ONE OPERATING GATE UNDER PROCESS FOR CLOSURE
DPH
54UTILIZATION OF LINE CAPACITY
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
SECTION BSP - BYT
DPH
55ACTIVITY
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
- AVERAGE TRAIN PER DAY 135 140 INCLUDING 11
COACHING TRAINS WHICH HALTS AT DPH IN BOTH UP
DN DIRECTION - THIS IS A INTER-DIVISIONAL INTERCHANGE POINT-
HEAVY TRAIN DETENTIONS - AVERAGE MONTHLY PLACEMENT ON BSPC HIRRI SIDING-20
RAKES
DPH
56CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
OPERATING STAFF DEPLOYED
DPH
57DISTRIBUTION OF MAN POWER
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
DPH
58CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW THE MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS FOLLOWS -
DPH
59CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
ASM
DPH
60CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
PM/LM/CM
DPH
61ANALYSIS
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
- INTRODUCTIN OF NEW TECHNOLOGY
- CENTRAL PANEL INTERLOCKING ALREADY INTTRODUCED
- CLOSURE OF ACTIVITY
- ONE TRAFFIC LC GATE TO BE CLOSED
- OUT SOURCING - Nil
- SYSTEM CHANGE - NIL
DPH
62CONCLUSION
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
- 1. WITH THE EXISTISNG PATTERN OF WORKING/WORKLOAD
FOLLOWING NUMBER OF STAFF ARE SHORT - PM 4
- 2. WITH THE INTRODUCTION OF CENTRAL PANEL, 8
POSTS OF SWM HAVE ALREADY BEEN SURRENDERED AND
INCUMBENTS WERE REDEPLOYED AS ASM. 2 ASMs ARE
WORKING PER SHIFT WHICH IS NECESSARY DUE TO
OPERATION OF FOUR BLOCK INSTRUMENTS, ATTENDING TO
SIGNAL FAILURES, ETC. -
DPH
63SECR
RRI STATION IN THIRD LINE TERRITORY
BILASPUR
BSP
64BRIEF DETAILS
RRI STATION IN THIRD LINE TERRITORY
SECR
- ROUTE RELAY INTERLOCKED STANDARD III B CLASS
JUNCTION STATION ON HWH MUMBAI MAIN LINE - TRIPPLE LINE WORKING AT EITHER END AND SINGLE
LINE WORKING AT KTE END. - A CHORD LINE BY PASSING BSP MAIN YARD GETS
CONNECTED TO KTE MAIN LINE AT NGP END OF BSP YARD
TO FACILITATE DIRECT MOVEMENT OF TRAIN FROM DPH
USL SECTION - TRAINS BETWEEN THIS STATION AND ADJACENT BLOCK
SECTION ARE WORKED UNDER ABSOLUTE BLOCK SYSTEM - ALL TRAINS ON MAIN LINE ARE CONTROLLED THROUGH
CENTRAL CABIN (RRI) - RRI CABIN IS PROVIDED WITH SIEMENS TYPE ROUTE
RELAY INTER LOCKING BASED ON TWO BUTTON OPERATION
- LINES AVAILABLE
- UP DEPARTURE 4 LINES
- DN DEPARTURE 2 LINES
- MAIN YARD 10 LINES
- DGT YARD 4 LINES
- BYE PASS YARD 2 LINES
- BCN YARD 4 LINES
BSP
65RRI STATION IN THIRD LINE TERRITORY
SECR
BRIEF DETAILS
- IT IS A BASE STATION FOR ARME ART.
- STATION COMPLEX COMPRISES OF MAIN YARD, DGT YARD,
BCN YARD, DGT YARD, MAJOR SICK LINE, COACHING
COMPLEX, GOODS SHED SIDING, FCI SIDING, POL
SIDING. - IN ADDITION IT IS HAVING BCN DEPOT MAJOR SICK
LINE.
BSP
66UTILIZATION OF LINE CAPACITY
RRI STATION IN THIRD LINE TERRITORY
SECR
STATION BSP
BSP
67ACTIVITY
RRI STATION IN THIRD LINE TERRITORY
SECR
BSP
68OPERATING STAFF DEPLOYED
RRI STATION IN THIRD LINE TERRITORY
SECR
- STATION MASTER
- YARD MASTER
- SHUNTMAN
- POINTSMAN
- SHUNTI NG JAMADAR
BSP
69DISTRIBUTION OF MAN POWER
RRI STATION IN THIRD LINE TERRITORY
SECR
BSP
70RRI STATION IN THIRD LINE TERRITORY
SECR
BSP
71RRI STATION IN THIRD LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW THE MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS UNDER.
BSP
72RRI STATION IN THIRD LINE TERRITORY
SECR
SM
BSP
73RRI STATION IN THIRD LINE TERRITORY
SECR
PM/LM/CM
BSP
74RRI STATION IN THIRD LINE TERRITORY
SECR
YM
BSP
75RRI STATION IN THIRD LINE TERRITORY
SECR
STJM
BSP
76ANALYSIS NEED BASED MANPOWER REQUIREMENT
RRI STATION IN THIRD LINE TERRITORY
SECR
- INTRODUCTIN OF NEW TECHNOLOGY - NIL
- CLOSURE OF ACTIVITY - NIL
- OUT SOURCING - Nil
- SYSTEM CHANGE
- YARD REMODELLING
- DOUBLE LINE CONVERSION OF KTE LINE
BSP
77CONCLUSION
RRI STATION IN THIRD LINE TERRITORY
SECR
- 1) WITH THE EXISTISNG PATTERN OF WORKING/
WORKLOAD FOLLOWING NUMBER OF STAFF ARE SURPLUS - SURPLUS YM - 2, PM 4
- SHORTFALL - ASM -1, STJM 3
- 2) ADDITIONAL MANPOWER REQUIRED FOR DOUBLE LINE
CONVERSION OF KTE LINE CAN BE OFFSET BY
CONNECTING CHORD CABIN AND BCN YARD CABIN WITH
RRI. -
BSP
78SUM-UP
SECR
- REVIEW OF SIX STATIONS SHOWS THAT THE FOLLOWING
STAFF ARE SURPLUS/ SHORT CONSIDERING OPERATION
WORKLOAD -
79SUM-UP
SECR
- SINCE EACH STATION HAS VARIABLE FACTORS LIKE
TRAFFIC DENSITY, NUMBER AND TYPE OF LEVEL
CROSSING GATES, TYPE OF BLOCK SECTION, SHUNTING
IN YARD, SIDINGS ETC., REQUIREMENT IS REQUIRED TO
BE ARRIVED AT IN EACH STATION TO DETERMINE
SURPLUS MANPOWER TO BE SURRENDERED/REDEPLOYED
AND SHORTFALL, WHICH WOULD REQUIRE
CREATION/REDEPLOYMENT
80SUGGESTIONS
SECR
- WHILE ASSESSING LR/RG REQUIREMENT, ROUNDING OFF
SHOULD NOT BE DONE AT EACH STAGE OF CALCULATION. - LR/RG IS TO BE CALCULATED CLUBBING THE STATIONS
WHEREVER REQUIRED. - MAN POWER REQUIREMENT AT ALL SIDING IS TO BE
REVIEWED SINCE NOW RAILWAYS HAS TO BEAR THE COST. - THERE IS A DEMAND FOR ADDITIONAL ASM PER SHIFT
FOR UNDERTAKING WORKS LIKE SIGNAL/POINT FAILURES,
SIGNAL EXCHANGE, MAINTENANCE OF RECORDS, ETC.
ESPECIALLY IN PANEL INTERLOCKED STATION IN THREE
LINE TERRITORY. THIS HAS TO BE DONE AFTER
PROPER WORKS STUDY.
81SECR
THANKS !