INDEPTH ANALYSIS OF WORKING OF CABINMAN LEVERMAN POINTSMANSHUNTING S - PowerPoint PPT Presentation

1 / 81
About This Presentation
Title:

INDEPTH ANALYSIS OF WORKING OF CABINMAN LEVERMAN POINTSMANSHUNTING S

Description:

EXCHANGE YARD CABIN SERVES LIL SIDING AND CONTROLS THE MOVEMENTS OF IN PLANT/LIL ... Tower car siding shunting neck rarely used. OUT SOURCING - Nil. SYSTEM CHANGE ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 82
Provided by: cpo85
Category:

less

Transcript and Presenter's Notes

Title: INDEPTH ANALYSIS OF WORKING OF CABINMAN LEVERMAN POINTSMANSHUNTING S


1
IN-DEPTH ANALYSIS OF WORKING OF
OPERATING STAFF
IN STATIONS/YARDS
SOUTH EAST CENTRAL RAILWAY
2
CATEGORIES
SECR
  • STATION MASTER
  • SWITCHMAN
  • CABINMAN
  • SHUNTMAN
  • LEVERMAN
  • POINTSMAN
  • SHUNTI NG JAMADAR
  • YARD MASTER

3
CADRE STRENGTH OF OPERATING STAFF
SECR
4
SECR
AREA OF RESEARCH
ZERO BASED WORK STUDY WAS CONDUCTED ON STATIONS
OF BILASPUR RAIPUR DIVISION OF SECR
REPRESENTING FOLLOWING DIFFERENT ASPECTS OF TRAIN
OPERATION -
END CABIN STATION IN THIRD LINE TERRITORY
END CABIN STATION IN DOUBLE LINE TERRITORY
END CABIN IN BRANCH DOUBLE LINE TERRITORY
END PANEL STATION IN THIRD LINE TERRITORY
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
RRI STATION IN THIRD LINE TERRITORY
5
SECR
METHOD OF RESEARCH
ONE STATION IN EACH CATEGORY WAS SELECTED AND
STUDY TEAM SENT TO THESE STATIONS TO OBSERVE THE
ACTUAL DEPLOYMENT OF MANPOWER, THEIR WORKING
WORKLOAD INVOLVED.
THERE IS NO LAID DOWN YARDSTICK FOR TRAFFIC STAFF
OF STATIONS. NOR BENCHMARK REPORT EXISTS FOR
COMPARISON WITH ALL INDIA BEST OR AVERAGE
BENCHMARK.
HENCE ZERO BASED WORK STUDY WAS CONDUCTED ALONG
WITH REVIEW OF WORK STUDY REPORT AVAILABLE ON THE
SUBJECT.
FACTORS LIKE REST GIVER AND LEAVE RESERVE IS
INVOLVED FOR ALL STATION TRAFFIC STAFF. RG IS
FIXED 16.66 AND LR IS FIXED AT 25
HOER PROVISIONS APPLICABLE WERE KEPT IN VIEW
6
SECR
END CABIN STATION IN THIRD LINE TERRITORY
AKALTARA
AKT
7
BRIEF DETAILS
END CABIN STATION IN THIRD LINE TERRITORY
SECR
  • 6 LINE B CLASS STATION
  • ON A ROUTE OF MUMBAI-HOWRAH ON THIRD LINE
    BETWEEN BILASPUR CHAMPA
  • STATION COMPLEX COMPLRISES OF AKT STATION, LATIA
    BLOCK CABIN, EXCHANGE YARD, AND IN PLANT LIL
    CEMENT SIDING.
  • ONE GOODS SHED ONE COAL LOADING SIDING ALSO
    EXIST.
  • ONE Y CURVE CONNECTS LATIA BLOCK CABIN AND
    AKALTARA WEST CABIN.
  • EXCHANGE YARD CABIN SERVES LIL SIDING AND
    CONTROLS THE MOVEMENTS OF IN PLANT/LIL SIDING.
  • THERE IS A SPECIAL CLASS INTERLOCKED EAST CABIN
    OPERATED LEVEL CROSSING GATE IN THE YARD. THE
    CABIN IS MANNED BY A SWITCHMAN WITHOUT ANY HELPER
  • BALLAST SIDING IS UNDER COMPLETION.

AKT
8
UTILIZATION OF LINE CAPACITY
END CABIN STATION IN THIRD LINE TERRITORY
SECR
SECTION CPH - BSP
AKT
9
ACTIVITY
END CABIN STATION IN THIRD LINE TERRITORY
SECR
  • A. UTILIZATION OF GOODS SHED
  • INWARD TRAFFIC 9 RAKES
  • OUTWARD TRAFFIC 6.8 RAKES
  • B. LIL SIDING MOVEMENTS
  • AVERAGE OUTWARD INWARD TRAFFIC -
    129.9 WAGON
  • C. EXCHANGE YARD, ENGINEERING SIDING
  • TRAFFIC SIDING COMMISSIONED ON
    31.01.07
  • FEB 07 6 TRAINS
  • MARCH 07 - 7 TRAINS
  • D AVERAGE NUMBER OF TRAINS PASSING UP DN PER
    DAY
  • AKT STATION - 75
  • LATIA BLOCK CABIN - 75

AKT
10
OPERATING STAFF DEPLOYED
END CABIN STATION IN THIRD LINE TERRITORY
SECR
  • STATION MASTER
  • SWITCHMAN
  • CABINMAN
  • LEVERMAN
  • POINTSMAN

AKT
11
DISTRIBUTION OF MAN POWER
SECR
END CABIN STATION IN THIRD LINE TERRITORY
AKT
12
SECR
END CABIN STATION IN THIRD LINE TERRITORY
KEEPING THE ACTIVITIES IN VIEW MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS UNDER.
AKT
13
SECR
END CABIN STATION IN THIRD LINE TERRITORY
SM
AKT
14
END CABIN STATION IN THIRD LINE TERRITORY
SECR
PM/LM/CM
AKT
15
END CABIN STATION IN THIRD LINE TERRITORY
SECR
SWM
AKT
16
ANALYSIS NEED BASED MANPOWER REQUIREMENT
END CABIN STATION IN THIRD LINE TERRITORY
SECR
  • INTRODUCTIN OF NEW TECHNOLOGY
  • Introduction of solid state centre panel
    interlocking replacing both end lever cabin
    SMs slide control
  • CLOSURE OF ACTIVITY
  • CCI Siding
  • Two lever cabins 1 centre SM slide system
  • OUT SOURCING - Nil
  • SYSTEM CHANGE
  • Additional work load of East Cabin SWM will be
    switched over to newly created Level Crossing
    Gate Keeper
  • Technological sophistication through Solid State
    Interlocking are being established to nab the
    detention to trains and ease to the work load.
  • For new LC gate 31 Gateman post is to be
    created.
  • For additional ASM due to central panel
    interlocking a job analysis will have to be
    conducted on introduction of working.

AKT
17
CONCLUSION
END CABIN STATION IN THIRD LINE TERRITORY
SECR
  • WITH THE EXISTISNG PATTERN OF WORKING/ WORKLOAD
    FOLLOWING NUMBER OF STAFF ARE SURPLUS -
  • ASM 1 CLASSIFICATION TO BE CHANGED TO
  • PM 1 EI IN LIL SIDING
  • WITH THE INTRODUCTION OF CENTRAL PANEL WORKING
    TWO END CABINS WILL BE CLOSED FOLLOWING POSTS
    WILL BE SURPLUS -
  • SWM 8
  • 3. FOR LC GATE 31 GK/PM IS TO BE CREATED.

AKT
18
SECR
END CABIN STATION IN DOUBLE LINE TERRITORY
RAIGARH
RIG
19
BRIEF DETAILS
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
  • 8 LINE B CLASS STATION
  • CREW CHANGING POINT
  • DIVISIONAL CAUTION ORDER ISSUING STATION
  • CENTRAL PANEL WORK SANCTIONED
  • STATION COMPLEX INCLUDES GOODS SHED, END
    ATTENTION
  • EXAMINATION LINE.

RIG
20
UTILIZATION OF LINE CAPACITY
SECR
SECTION JSG - CPH
RIG
21
ACTIVITIES
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
  • AVERAGE NUMBER OF 74 GOODS TRAIN AND 38 COACHING
    TRAINS IN UP AND DN DIRECTIONS.
  • TWO TERMINAL COACHING LINES FOR END ATTENTION
  • IN GOODS SHED YARD MONTHLY AVERAGE 20 22
    RKES
  • END CABIN LEVER OPERATED

RIG
22
OPERATING STAFF DEPLOYED
END CABIN STATION IN THIRD LINE TERRITORY
SECR
  • STATION MASTER
  • SWITCHMAN
  • CABINMAN
  • LEVERMAN
  • POINTSMAN
  • SHUNTING JAMADAR

RIG
23
DISTRIBUTION OF MAN POWER
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
RIG
24
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW THE MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS UNDER.
RIG
25
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
SM
RIG
26
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
PM/LM/CM
RIG
27
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
SWM
RIG
28
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
SHUNTING JAMADAR
RIG
29
ANALYSIS NEED BASED MANPOWER REQUIREMENT
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
  • INTRODUCTIN OF NEW TECHNOLOGY
  • Solid state centre panel interlocking replacing
    both end lever cabin SMs slide control is
    being introduced
  • CLOSURE OF ACTIVITY
  • TIMBER SIDING
  • Tower car siding shunting neck rarely used
  • OUT SOURCING - Nil
  • SYSTEM CHANGE
  • Coaching Complex planned
  • COMMON CREW BOOKING IS NOW BEING DONE BY ROSTER
    CLERK IN CREW LOBBY INSTEAD OF ASM

RIG
30
CONCLUSION
END CABIN STATION IN DOUBLE LINE TERRITORY
SECR
  • WITH THE EXISTISNG PATTERN OF WORKING/WORKLOAD
    FOLLOWING NUMBER OF STAFF ARE SURPLUS/SHORT
  • SURPLUS SM 4 PM 6,
  • SHORTFALL SWM 1
  • WITH THE INTRODUCTION OF CENTRAL PANEL WORKING
    TWO END CABINS WILL BE CLOSED FOLLOWING POINTS
    WILL BE SURPLUS -
  • SWM 7

HOME
RIG
31
SECR
END CABIN IN BRANCH LINE TERRITORY
KOTMA
KTMA
32
BRIEF DETAILS
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
  • 5 LINE B CLASS STATION ON APR-CHRM SECTION
  • GOVINDA SIDING OF SECL TAKES OFF IN EXTENSION OF
    LINE NO. 5
  • STATION IS HAVING LEVER OPERATED END CABINS

KTMA
33
UTILIZATION OF LINE CAPACITY
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
STATION KTMA
KTMA
34
ACTIVITY
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
KTMA
35
OPERATING STAFF DEPLOYED
END CABIN STATION IN THIRD LINE TERRITORY
SECR
  • STATION MASTER
  • SWITCHMAN
  • POINTSMAN

KTMA
36
DISTRIBUTION OF MAN POWER
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
KTMA
37
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW THE MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS UNDER.
KTMA
38
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
KTMA
39
ANALYSIS NEED BASED MANPOWER REQUIREMENT
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
  • INTRODUCTIN OF NEW TECHNOLOGY
  • NO PROPOSAL
  • CLOSURE OF ACTIVITY
  • ONE COAL SIDING HAS BEEN CLOSED
  • OUT SOURCING - Nil
  • SYSTEM CHANGE
  • 1) Commercial activities earlier performed by
  • ASM is now being done
    by Commercial staff.

KTMA
40
END CABIN IN BRANCH DOUBLE LINE TERRITORY
SECR
CONCLUSION
  • WITH THE EXISTISNG PATTERN OF WORKING/ WORKLOAD
    FOLLOWING NUMBER OF STAFF ARE SURPLUS -
  • ASM 1
  • PM/LM/CM 4

KTMA
41
SECR
END PANEL STATION IN THIRD LINE TERRITORY
NAILA
NIA
42
BRIEF DETAILS
END PANEL STATION IN THIRD LINE TERRITORY
SECR
  • 5 LINE B CLASS STATION ON HWH-MUMBAI TRUNK
    ROUTE
  • STATION COMPLEX COMPRISES OF NIA STATION, GOODS
    SHED AND INTERLOCKED GATE AT WEST END.

NIA
43
UTILIZATION OF LINE CAPACITY
END PANEL STATION IN THIRD LINE TERRITORY
SECR
SECTION CPH - BSP
NIA
44
ACTIVITIES
END PANEL STATION IN THIRD LINE TERRITORY
SECR
  • 150 TRAINS PER DAY BOTH UP DN DIRECTION
    INCLUDING 32 COACHING TRAINS.
  • TWO RAKES PER MONTH IN GOODS SHED

NIA
45
OPERATING STAFF DEPLOYED
END PANEL STATION IN THIRD LINE TERRITORY
SECR
  • STATION MASTER
  • POINTSMAN
  • PORTER

NIA
46
DISTRIBUTION OF MAN POWER
END PANEL STATION IN THIRD LINE TERRITORY
SECR
NIA
47
END PANEL STATION IN THIRD LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS FOLLOWS -
NIA
48
END PANEL STATION IN THIRD LINE TERRITORY
SECR
ASM
NIA
49
END PANEL STATION IN THIRD LINE TERRITORY
SECR
PM/LM/CM
NIA
50
ANALYSIS NEED BASED MANPOWER REQUIREMENT
END PANEL STATION IN THIRD LINE TERRITORY
SECR
  • INTRODUCTIN OF NEW TECHNOLOGY - NIL
  • CLOSURE OF ACTIVITY - NIL
  • OUT SOURCING - Nil
  • SYSTEM CHANGE - NIL

NIA
51
CONCLUSION
END PANEL STATION IN THIRD LINE TERRITORY
SECR
  • 1. WITH THE EXISTISNG PATTERN OF WORKING/WORKLOAD
    FOLLOWING NUMBER OF STAFF ARE SURPLUS
  • PM - 2
  • 2. WITH THE END PANEL WORKING MAN POWER
    REQUIREMENT REMAINED THE SAME. INSTEAD OF SWM,
    ASM IS MANNING. THEREFORE, CENTRAL PANEL SHOULD
    BE INTRODUCED, WHEREVER POSSIBLE.

NIA
52
SECR
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
DADHAPARA
DPH
53
BRIEF DETAILS
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
  • 6 LINE B CLASS STATION
  • INTER-DIVISIONAL INTERCHANGE POINT
  • STATION COMPLEX COMPRISES OF STATION HIRRI
    SIDING OF BHILAI STEEL PLANT
  • ONE GOODS LINE AND COAL WASHERY SIDING ARE COMING
    UP
  • ONE OPERATING GATE UNDER PROCESS FOR CLOSURE

DPH
54
UTILIZATION OF LINE CAPACITY
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
SECTION BSP - BYT
DPH
55
ACTIVITY
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
  • AVERAGE TRAIN PER DAY 135 140 INCLUDING 11
    COACHING TRAINS WHICH HALTS AT DPH IN BOTH UP
    DN DIRECTION
  • THIS IS A INTER-DIVISIONAL INTERCHANGE POINT-
    HEAVY TRAIN DETENTIONS
  • AVERAGE MONTHLY PLACEMENT ON BSPC HIRRI SIDING-20
    RAKES

DPH
56
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
OPERATING STAFF DEPLOYED
  • STATION MASTER
  • POINTSMAN

DPH
57
DISTRIBUTION OF MAN POWER
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
DPH
58
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW THE MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS FOLLOWS -
DPH
59
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
ASM
DPH
60
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
PM/LM/CM
DPH
61
ANALYSIS
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
  • INTRODUCTIN OF NEW TECHNOLOGY
  • CENTRAL PANEL INTERLOCKING ALREADY INTTRODUCED
  • CLOSURE OF ACTIVITY
  • ONE TRAFFIC LC GATE TO BE CLOSED
  • OUT SOURCING - Nil
  • SYSTEM CHANGE - NIL

DPH
62
CONCLUSION
CENTRAL PANEL STATION IN THIRD LINE TERRITORY
SECR
  • 1. WITH THE EXISTISNG PATTERN OF WORKING/WORKLOAD
    FOLLOWING NUMBER OF STAFF ARE SHORT
  • PM 4
  • 2. WITH THE INTRODUCTION OF CENTRAL PANEL, 8
    POSTS OF SWM HAVE ALREADY BEEN SURRENDERED AND
    INCUMBENTS WERE REDEPLOYED AS ASM. 2 ASMs ARE
    WORKING PER SHIFT WHICH IS NECESSARY DUE TO
    OPERATION OF FOUR BLOCK INSTRUMENTS, ATTENDING TO
    SIGNAL FAILURES, ETC.

DPH
63
SECR
RRI STATION IN THIRD LINE TERRITORY
BILASPUR
BSP
64
BRIEF DETAILS
RRI STATION IN THIRD LINE TERRITORY
SECR
  • ROUTE RELAY INTERLOCKED STANDARD III B CLASS
    JUNCTION STATION ON HWH MUMBAI MAIN LINE
  • TRIPPLE LINE WORKING AT EITHER END AND SINGLE
    LINE WORKING AT KTE END.
  • A CHORD LINE BY PASSING BSP MAIN YARD GETS
    CONNECTED TO KTE MAIN LINE AT NGP END OF BSP YARD
    TO FACILITATE DIRECT MOVEMENT OF TRAIN FROM DPH
    USL SECTION
  • TRAINS BETWEEN THIS STATION AND ADJACENT BLOCK
    SECTION ARE WORKED UNDER ABSOLUTE BLOCK SYSTEM
  • ALL TRAINS ON MAIN LINE ARE CONTROLLED THROUGH
    CENTRAL CABIN (RRI)
  • RRI CABIN IS PROVIDED WITH SIEMENS TYPE ROUTE
    RELAY INTER LOCKING BASED ON TWO BUTTON OPERATION
  • LINES AVAILABLE
  • UP DEPARTURE 4 LINES
  • DN DEPARTURE 2 LINES
  • MAIN YARD 10 LINES
  • DGT YARD 4 LINES
  • BYE PASS YARD 2 LINES
  • BCN YARD 4 LINES

BSP
65
RRI STATION IN THIRD LINE TERRITORY
SECR
BRIEF DETAILS
  • IT IS A BASE STATION FOR ARME ART.
  • STATION COMPLEX COMPRISES OF MAIN YARD, DGT YARD,
    BCN YARD, DGT YARD, MAJOR SICK LINE, COACHING
    COMPLEX, GOODS SHED SIDING, FCI SIDING, POL
    SIDING.
  • IN ADDITION IT IS HAVING BCN DEPOT MAJOR SICK
    LINE.

BSP
66
UTILIZATION OF LINE CAPACITY
RRI STATION IN THIRD LINE TERRITORY
SECR
STATION BSP
BSP
67
ACTIVITY
RRI STATION IN THIRD LINE TERRITORY
SECR
BSP
68
OPERATING STAFF DEPLOYED
RRI STATION IN THIRD LINE TERRITORY
SECR
  • STATION MASTER
  • YARD MASTER
  • SHUNTMAN
  • POINTSMAN
  • SHUNTI NG JAMADAR

BSP
69
DISTRIBUTION OF MAN POWER
RRI STATION IN THIRD LINE TERRITORY
SECR
BSP
70
RRI STATION IN THIRD LINE TERRITORY
SECR
BSP
71
RRI STATION IN THIRD LINE TERRITORY
SECR
KEEPING THE ACTIVITIES IN VIEW THE MAN POWER
REQUIREMENT CATAGORYWISE VIS-A-VIZ SANCTION IS
AS UNDER.
BSP
72
RRI STATION IN THIRD LINE TERRITORY
SECR
SM
BSP
73
RRI STATION IN THIRD LINE TERRITORY
SECR
PM/LM/CM
BSP
74
RRI STATION IN THIRD LINE TERRITORY
SECR
YM
BSP
75
RRI STATION IN THIRD LINE TERRITORY
SECR
STJM
BSP
76
ANALYSIS NEED BASED MANPOWER REQUIREMENT
RRI STATION IN THIRD LINE TERRITORY
SECR
  • INTRODUCTIN OF NEW TECHNOLOGY - NIL
  • CLOSURE OF ACTIVITY - NIL
  • OUT SOURCING - Nil
  • SYSTEM CHANGE
  • YARD REMODELLING
  • DOUBLE LINE CONVERSION OF KTE LINE

BSP
77
CONCLUSION
RRI STATION IN THIRD LINE TERRITORY
SECR
  • 1) WITH THE EXISTISNG PATTERN OF WORKING/
    WORKLOAD FOLLOWING NUMBER OF STAFF ARE SURPLUS
  • SURPLUS YM - 2, PM 4
  • SHORTFALL - ASM -1, STJM 3
  • 2) ADDITIONAL MANPOWER REQUIRED FOR DOUBLE LINE
    CONVERSION OF KTE LINE CAN BE OFFSET BY
    CONNECTING CHORD CABIN AND BCN YARD CABIN WITH
    RRI.

BSP
78
SUM-UP
SECR
  • REVIEW OF SIX STATIONS SHOWS THAT THE FOLLOWING
    STAFF ARE SURPLUS/ SHORT CONSIDERING OPERATION
    WORKLOAD

79
SUM-UP
SECR
  • SINCE EACH STATION HAS VARIABLE FACTORS LIKE
    TRAFFIC DENSITY, NUMBER AND TYPE OF LEVEL
    CROSSING GATES, TYPE OF BLOCK SECTION, SHUNTING
    IN YARD, SIDINGS ETC., REQUIREMENT IS REQUIRED TO
    BE ARRIVED AT IN EACH STATION TO DETERMINE
    SURPLUS MANPOWER TO BE SURRENDERED/REDEPLOYED
    AND SHORTFALL, WHICH WOULD REQUIRE
    CREATION/REDEPLOYMENT

80
SUGGESTIONS
SECR
  • WHILE ASSESSING LR/RG REQUIREMENT, ROUNDING OFF
    SHOULD NOT BE DONE AT EACH STAGE OF CALCULATION.
  • LR/RG IS TO BE CALCULATED CLUBBING THE STATIONS
    WHEREVER REQUIRED.
  • MAN POWER REQUIREMENT AT ALL SIDING IS TO BE
    REVIEWED SINCE NOW RAILWAYS HAS TO BEAR THE COST.
  • THERE IS A DEMAND FOR ADDITIONAL ASM PER SHIFT
    FOR UNDERTAKING WORKS LIKE SIGNAL/POINT FAILURES,
    SIGNAL EXCHANGE, MAINTENANCE OF RECORDS, ETC.
    ESPECIALLY IN PANEL INTERLOCKED STATION IN THREE
    LINE TERRITORY. THIS HAS TO BE DONE AFTER
    PROPER WORKS STUDY.

81
SECR
THANKS !
Write a Comment
User Comments (0)
About PowerShow.com