1Overview of the NH Rail Transit Authority
the NH Capitol Corridor Project
2NH Rail Transit Authority Overview
- 2006-Governor Commissions Study to Determine
Viability of Establishing a Commuter Rail
Authority - January 2007 SB-75N Bill Introduced
-
- June, 2007 SB-75N Signed into Law
- First NHRTA Meeting September 2007
- June, 2008- 75 M Limit Liability Cap Signed into
Law - November 2008 Executive Board Established by the
NHRTA Board - November 2008 Interim Executive Director Position
approved by the NHRTA Board
3NH Rail Transit Authority Overview
- Mission Statement Mission
- Develop and Provide Commuter, Passenger Rail and
Related Public Rail Transportation Services in
NH. - Vision
- Develop and implement comprehensive,
coordinated and prioritized project - and funding plans for passenger rail services
that provide New Hampshire citizens - Commuter rail services to in state and out of
state employment centers, - Tourist services to recreation areas,
- Easy access to regional inter-city passenger rail
services and other multi-modal transportation
systems. -
4NH Capitol Corridor Project Description
- Provide Commuter Rail Service from Manchester to
Boston - Manchester-North Station- Approx. 58 Miles
- Three NH Passenger Rail Stations Assumed
- Downtown Manchester
- Manchester Boston Regional Airport
- Nashua
- Extend MBTA Lowell Service to Manchester
- 33 Miles From Lowell
- Right-of-Way Ownership South of State Line-
- Executive Office of Transportation (MBTA)
- Right-of-Way Ownership North of State Line-
- Pan Am Railways
5NH Capital CorridorAlternatives for Ridership
- Alternate No. 1
- Low Frequency (3 Peak Trains)-Minimum per MBTA
requirements - Alternate No. 2
- Medium Frequency (4/5 peak trains)-extension of
previously planned Nashua service. - Alternate No. 3
- High Frequency (6 peak trains) Extension of all
Lowell trains. - Alternate No. 4 (Preferred)
- Express service-medium frequency (4/5 peak
trains) stops at NH stations (3), Chelmsford,
Lowell, Anderson, North Station - Alternate No. 5
- Express service-Low Frequency (3 peak trains) )
stops at NH stations (3), Chelmsford, Lowell,
Anderson, North Station
6NH Capital CorridorPotential Commuter Operations
- Manchester to Boston, North Station (minutes)
includes station dwell time - Weekday Service Frequencies AM Peak (P) 6AM-9AM,
Mid day Peak Off peak (OP) 9AM-4PM) PM Peak
4PM-7PM, Evening OP-7PM
7NH Capitol CorridorInfrastructure Improvements
- Lowell to Nashua (Approximately 11 Miles)
- One Station and Train Layover
- Up-Grade Highway Crossings
- Double Track - Rehabilitate and Restore
- New Train Control System (TCS)
- Relocate Existing Fiber Optic Cable
- Operational Control Center (OCC) Upgrades
- Nashua to Manchester (Approximately 22 Miles)
- Two Stations
- Sections of Double and Single Track
- Up-Grade Highway Crossings
- New Train Control System (TCS)
- Relocate Existing Fiber Optic Cable
- Operational Control Center (OCC) Upgrades
8NH Capital Corridor-Order of Magnitude Cost
Estimate
- Estimated Capitol Costs 300 M (Escalated to
Year 2013) - Lowell to Manchester
- Equipment
- Engineering, Contingency Escalation
- Assumptions
- Work completed by Force Account
- Three NH Stations
- Equipment- New Coaches and one New locomotive
- Train Layover Facility
- Rehabilitate Existing Grade Crossings
- Approximately 33 miles of Track, Civil, and
Train Control Upgrades - Double Track to Train Layover Facility
- Single Track North of Train Layover Facility w/
Sections of Double Track (passing sidings) - Control Center Modifications
-
- Estimated Annual Operating Costs-10M to 12 M
9NH Capital Corridor Estimated Fare Box Revenue
- Travel MHT/Airport-Boston
- Projected Average One-Way Trip Costs.. Less
than 10/trip - Estimated Average Daily Riders . 1,760
- Estimated Annual Revenue. 3.9 M
- Travel Nashua-Boston
- Projected Average One-Way Trip Costs .. Less
than 10/trip - Estimated Average Daily Riders ..
1,380 - Estimated Annual Revenue 2.7M
- Projections
- Total Projected Riders..
820,000 - Estimated Annual Revenue 6.6 M
Approximately 50 of Operating Costs from Fare
Box Revenue
10NH Capital CorridorNext Steps
- Fund Alternative Analysis and Preliminary
Engineering - Determine Eligibility for Stimulus Dollars
- Complete Alternative Analysis and Preliminary
Engineering - Affirm Commuter Rail Alternative
- Station locations
- Operations
- Commuter Rail Operations
- Cost Estimates
- Identify Funding for Capitol and Operating Costs
- Complete Final Design and Implement
Operating/Access Agreements with PA Am Rail