Title: Overview of the NH Rail Transit Authority


1
Overview of the NH Rail Transit Authority
the NH Capitol Corridor Project
  • April 14 , 2009

2
NH Rail Transit Authority Overview
  • 2006-Governor Commissions Study to Determine
    Viability of Establishing a Commuter Rail
    Authority
  • January 2007 SB-75N Bill Introduced
  • June, 2007 SB-75N Signed into Law
  • First NHRTA Meeting September 2007
  • June, 2008- 75 M Limit Liability Cap Signed into
    Law
  • November 2008 Executive Board Established by the
    NHRTA Board
  • November 2008 Interim Executive Director Position
    approved by the NHRTA Board

3
NH Rail Transit Authority Overview
  • Mission Statement Mission
  • Develop and Provide Commuter, Passenger Rail and
    Related Public Rail Transportation Services in
    NH.
  • Vision
  • Develop and implement comprehensive,
    coordinated and prioritized project
  • and funding plans for passenger rail services
    that provide New Hampshire citizens
  • Commuter rail services to in state and out of
    state employment centers,
  • Tourist services to recreation areas,
  • Easy access to regional inter-city passenger rail
    services and other multi-modal transportation
    systems.
  •  

4
NH Capitol Corridor Project Description
  • Provide Commuter Rail Service from Manchester to
    Boston
  • Manchester-North Station- Approx. 58 Miles
  • Three NH Passenger Rail Stations Assumed
  • Downtown Manchester
  • Manchester Boston Regional Airport
  • Nashua
  • Extend MBTA Lowell Service to Manchester
  • 33 Miles From Lowell
  • Right-of-Way Ownership South of State Line-
  • Executive Office of Transportation (MBTA)
  • Right-of-Way Ownership North of State Line-
  • Pan Am Railways

5
NH Capital CorridorAlternatives for Ridership
  • Alternate No. 1
  • Low Frequency (3 Peak Trains)-Minimum per MBTA
    requirements
  • Alternate No. 2
  • Medium Frequency (4/5 peak trains)-extension of
    previously planned Nashua service.
  • Alternate No. 3
  • High Frequency (6 peak trains) Extension of all
    Lowell trains.
  • Alternate No. 4 (Preferred)
  • Express service-medium frequency (4/5 peak
    trains) stops at NH stations (3), Chelmsford,
    Lowell, Anderson, North Station
  • Alternate No. 5
  • Express service-Low Frequency (3 peak trains) )
    stops at NH stations (3), Chelmsford, Lowell,
    Anderson, North Station

6
NH Capital CorridorPotential Commuter Operations
  • Manchester to Boston, North Station (minutes)
    includes station dwell time
  • Weekday Service Frequencies AM Peak (P) 6AM-9AM,
    Mid day Peak Off peak (OP) 9AM-4PM) PM Peak
    4PM-7PM, Evening OP-7PM

7
NH Capitol CorridorInfrastructure Improvements
  • Lowell to Nashua (Approximately 11 Miles)
  • One Station and Train Layover
  • Up-Grade Highway Crossings
  • Double Track - Rehabilitate and Restore
  • New Train Control System (TCS)
  • Relocate Existing Fiber Optic Cable
  • Operational Control Center (OCC) Upgrades
  • Nashua to Manchester (Approximately 22 Miles)
  • Two Stations
  • Sections of Double and Single Track
  • Up-Grade Highway Crossings
  • New Train Control System (TCS)
  • Relocate Existing Fiber Optic Cable
  • Operational Control Center (OCC) Upgrades

8
NH Capital Corridor-Order of Magnitude Cost
Estimate
  • Estimated Capitol Costs 300 M (Escalated to
    Year 2013)
  • Lowell to Manchester
  • Equipment
  • Engineering, Contingency Escalation
  • Assumptions
  • Work completed by Force Account
  • Three NH Stations
  • Equipment- New Coaches and one New locomotive
  • Train Layover Facility
  • Rehabilitate Existing Grade Crossings
  • Approximately 33 miles of Track, Civil, and
    Train Control Upgrades
  • Double Track to Train Layover Facility
  • Single Track North of Train Layover Facility w/
    Sections of Double Track (passing sidings)
  • Control Center Modifications
  • Estimated Annual Operating Costs-10M to 12 M

9
NH Capital Corridor Estimated Fare Box Revenue
  • Travel MHT/Airport-Boston
  • Projected Average One-Way Trip Costs.. Less
    than 10/trip
  • Estimated Average Daily Riders . 1,760
  • Estimated Annual Revenue. 3.9 M
  • Travel Nashua-Boston
  • Projected Average One-Way Trip Costs .. Less
    than 10/trip
  • Estimated Average Daily Riders ..
    1,380
  • Estimated Annual Revenue 2.7M
  • Projections
  • Total Projected Riders..
    820,000
  • Estimated Annual Revenue 6.6 M

Approximately 50 of Operating Costs from Fare
Box Revenue
10
NH Capital CorridorNext Steps
  • Fund Alternative Analysis and Preliminary
    Engineering
  • Determine Eligibility for Stimulus Dollars
  • Complete Alternative Analysis and Preliminary
    Engineering
  • Affirm Commuter Rail Alternative
  • Station locations
  • Operations
  • Commuter Rail Operations
  • Cost Estimates
  • Identify Funding for Capitol and Operating Costs
  • Complete Final Design and Implement
    Operating/Access Agreements with PA Am Rail