ADOT Public Transportation Division - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

ADOT Public Transportation Division

Description:

Rehab/Improvement Financing (RRIF) New Freight Rail Authorizations (TIFIA) ... 1 Pass Rail Car = 175 Passengers. 1 Pass Train = 5 Rail Cars (875 Passengers) ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 17
Provided by: ysidro
Category:

less

Transcript and Presenter's Notes

Title: ADOT Public Transportation Division


1
ADOTPublic Transportation Division
  • Arizona Transit and Railroad Infrastructure
  • Arizona League Annual Conference
  • Jim Dickey

2
Public Transportation Small Urban and State
  • YMPO, CYMPO, NAIPTA (FMPO)
  • Elderly Persons and Persons with Disabilities
    (5310 Program)
  • Rural Public Transportation (5311 Program)
  • JARC (5316 Program)
  • New Freedom (5317 Program)

3
Public Transportation Large Urban
  • Metropolitan Phoenix
  • Metro Rail
  • Avondale
  • Metropolitan Tucson

4
Other Transit
  • Arizona Rides
  • Rural Transit Connector Program
  • State Safety Oversight
  • Building Quality Arizona
  • LTAF II
  • Transportation Authorities
  • Studies/Projects
  • Executive Order 2007-02
  • Rural Transit Needs Study

5
Future Issues
  • Emerging/Redefining MPOs
  • Transit Application
  • 5311 to 5307
  • Growth patterns
  • Discretionary Funding (5309 Program)
  • Continuance/Expansion of the RTCS Program
  • Stabilization of LTAF II

6
RailFreight and Public Transportation
  • RR Growth Challenges
  • Passenger Rail Programs
  • Existing
  • New
  • Studies

7
(No Transcript)
8
Rail Road Information
  • Two Class I railroads (Union Pacific and
    Burlington Northern/Santa Fe)
  • Eleven short line and mining railroad
  • Seven terminal/switching railroads
  • Two tourist railroads
  • Miles 2,200 railroad miles
  • Freight originate and terminate nearly 36
    million tons
  • Grade Crossings 1,800 public and private grade
    crossings

9
RR-Regulation
  • Arizona Corporation Commission
  • Transportation Safety Board
  • Federal Railroad Administration
  • ADOT-SSO for FTA Projects

10
Passenger Rail
  • AmTrak
  • 75,000 annual boardings
  • Grand Canyon Railway
  • 240,000 annual boardings
  • Verde Canyon Railway
  • 90,000 annual boardings
  • Historic Streetcar (Tucson, Now and Future)
  • METRO Rail (Phoenix, 2008)

11
Future Rail Ventures
  • Expanded Freight operations (Short Line/Class 1)
  • Tourist Rail options
  • Planned Light Rail
  • Phoenix
  • Tucson
  • Commuter Rail options
  • High Speed/Intercity Rail options

12
Funding Issues
  • SAFETEA-LU
  • Grade Crossing
  • Freight Rail projects
  • Rehab/Improvement Financing (RRIF)
  • New Freight Rail Authorizations (TIFIA)
  • Grade Crossing Safety (Section 130)
  • Earmarks (freight and passenger)
  • SIB
  • Rail Relocations
  • Preservation
  • CMAQ
  • Tax Credits

13
RR Future?
  • Preservation
  • Acquisition/Ownership
  • New Corridor Identification
  • Rail Banking (as a result of abandonment)
  • Partnerships

14
Capacity?
15
Congestion ReliefTrucks, Trains, and Cars
  • Rail Capacity
  • 3 Trucks 1 rail car
  • 1 Train 100 rail cars
  • 10 Trains/day Removes 3,000 Trucks
  • Roads Capacity
  • 1 Truck 5 Cars
  • 1 Train Removes 300 Trucks
  • 10 Trains Creates Capacity for 15,000 Cars
  • Passenger Train Capacity
  • 1 Pass Rail Car 175 Passengers
  • 1 Pass Train 5 Rail Cars (875 Passengers)
  • 875 Passengers Removes 800 Cars

16
Public Transportation Summary
  • Develop a multi-modal approach to address
    significant capacity issues
  • Protect interests and meet needs of rural Arizona
  • Develop a plan to facilitate private railroad
    operations growth and needs
  • Develop freight and passenger rail program to
    relieve congestion
  • Identify roles and responsibilities of
    government, private industry, and others
Write a Comment
User Comments (0)
About PowerShow.com