Title: Vision
1Vision
- Create a formal, comprehensive aircraft RESET
Program to enhance the material condition of USMC
aircraft and reduce the maintenance burden of our
Marines - Develop the process for requirements
determination - Develop structure for the program office
- Includes, spec development, budgeting,
contracting, scheduling, and execution - Develop performance metrics
- Develop policy and plans
USMC Aviation RESET Mission Use a special
technical inspection and repair program that
includes inspection cleaning, repair, and select
mandatory replacement of parts, in order to
enhance and sustain aircraft material condition
and reduce the maintenance burden on our Marines.
2RESET PROJECT
3Aircraft Material Condition Flow
Combat Sustainment In Theater
Preset CONUS
REDEPLOY
RETURN TO FLEET
Industrial / Integrated Logistics Support CONUS
DEPLOY
Reconstitution CONUS
DEPOT INDUCTION
4Aircraft Material Condition Flow
Combat Sustainment In Theater
Preset CONUS
- Establish a Preset Program
- to groom deploying A/C and
- optimize material condition
- 180 to 30 days prior to deployment
- Perform scheduled maintenance
- Establish CFTs to fix all Noted But
- Not Corrected (NBNC) discrepancies
- from DEPOT events
- Perform Material Condition
- Inspections (MCI) and Aircraft
- Service Period Adjustments (ASPA)
- in OIF to assess material condition of A/C
- Conduct Material Condition Reconstitution
- (MCR) to fix discrepancies from MCI/ASPA
- and perform in depth disassembly and
- cleaning of aircraft
- Performed in OIF by Contractor Field Team (CFT)
- CFT fixes all discrepancies found by DEPOT
REDEPLOY
RETURN TO FLEET
Industrial / Integrated Logistics Support CONUS
DEPLOY
Reconstitution CONUS
- Within 180 days post-deployment
- Returns an immediately deployable aircraft to the
unit - Significantly improved operational availability
and material condition that enables quick Depot
events - Worked by CONUS CFT reconstitution teams
- Reduce Deport Work In Process
- Reduce backlog of aircraft in DEPOT
- Refurbish Support Equipment (SE)
- degraded in harsh OIF environment
- Standardize Work Load Packages
DEPOT INDUCTION
5Rotation Schedule/Requirement
6RESET Tentacles
- Automated Analysis Tool
- FY08-establish requirements
- FY09-compete for solution and bolt on deckplate
- Review all maintenance decks
- O-D effort in conjunction with O-level Airspeed
- Acceleration of OOMA and ASM
- FRC reporting of WIP
- Standardized TAT reporting
- Establish max out-of-reporting