LinkUp OPENTEXT 2004 References AIRBUS - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

LinkUp OPENTEXT 2004 References AIRBUS

Description:

LinkUp OPENTEXT 2004. References AIRBUS. Projets MARVEL & CARe ... Analyse et tests des 10 progiciels (grille de crit res) R alisation de 2 prototypes ... – PowerPoint PPT presentation

Number of Views:28
Avg rating:3.0/5.0
Slides: 23
Provided by: clot
Category:

less

Transcript and Presenter's Notes

Title: LinkUp OPENTEXT 2004 References AIRBUS


1
LinkUp OPENTEXT 2004 References AIRBUS
  • Projets MARVEL CARe

2
Sommaire
  • Présentation de SQLI
  • Les objectifs des projets
  • Démarche de réalisation
  • Les grandes fonctions

3
Les objectifs du projet MARVEL
  • Sauvegarder linformation chaque utilisateur du
    Marketing publie ses documents dans
    lenvironnement commun
  • Partager la connaissance (document, image, video)
  • à lintérieur du Marketing
  • avec les autres directions en fonction de leurs
    métiers
  • avec les autres sites dAirbus
  • Travailler déconnecté du réseau
  • Gérer les droits daccès
  • Sintégrer à Microsoft office (principalement
    Powerpoint)
  • Accéder de lextérieur
  • Conserver lhistorique
  • Intégrer le SSO

4
Première étape un gestionnaire de fichiers
  • 1997 création dune structure par un
    gestionnaire de fichiers
  • Limites
  • Structure devenue trop complexe
  • Fichiers inaccessibles
  • Difficultés pour retrouver linformation
  • Impossibilité daccès à linformation en mission
    à lextérieur
  • Manque de flexibilité de la gestion des droits
    daccès (droits sur le serveur)

5
Les étapes du projet (1/3)
  • Septembre 2001 Appel doffre et choix dun
    intégrateur
  • Interview de 50 utilisateurs pour mieux cibler
    les besoins et les attentes
  • Création dun groupe de travail de 15
    utilisateurs incluant les différents métiers du
    Marketing
  • Proposition de 10 progiciels correspondant aux
    besoins
  • Analyse et tests des 10 progiciels (grille de
    critères)
  • Réalisation de 2 prototypes
  • Choix de la meilleure solution

6
Les étapes du projet (2/3)
  • Avril 2002 Sélection de Livelink après une
    adaptation à nos besoins spécifiques
  • Interface plus conviviale
  • Design personnalisé
  • Mars 2003 entrée en Service MARVEL V1
  • Problèmes de temps de réponse et de stabilité
  • Janvier 2004 entrée en service MARVEL V2
  • Mars 2004 installation de MARVEL en Chine
  • Prochaine étape installation de MARVEL aux USA

7
Les étapes du projet (3/3)
  • Mise en service
  • Par étapes
  • le Marketing seul
  • les autres utilisateurs
  • Formation
  • par profil dutilisateurs
  • sessions didactiques avec Questions/Réponses
  • Forum démonstrations à la demande
  • Aide permanente et individuelle par les
    administrateurs
  • Support matériel mini-guide Utilisateurs,
    Questions les plus souvent posées, Comment je
    fais pour

8
En résumé (1/2)
  • 1996 laptops and cell phones for nomad staff
    (SAM)
  • 1997 ANVIL Airbus Network Visual Library
  • 2000 ANVIL has reached a size of 80 Gbyte
  • Sep. 01 Study for a more comprehensive solution
  • Jan. 02 Mock-up with 2 suppliers
  • Apr. 02 LiveLink selected, detailed study
  • Marvel MARketing Visual Electronic Library
  • Mar. 03 Entry into service of Marvel
  • Jan. 04 E.I.S. Marvel V2
  • Mar. 04 Installation of replication server in
    Beijing
  • Apr. 04 Installation of replication server in
    Washington

9
En résumé (2/2)
  • Capitalised on ANVIL R.O.I.
  • High user involvement in the project team
  • 1.5 man-years of development in 10 months
  • Fixed-price subcontracting
  • Roll-out as a big-bang with legacy recovery
  • V2 anticipated from the beginning for
  • SLA extension
  • Windows integration
  • Multi-site implementation

10
Marvel Front-page
11
Marvel 2 user interfaces
12
My Marvel
13
Categories and Search
14
Image Library
15
Off-line use
16
The twin CARe
  • Customer Affairs Reference e-Library
  • CARe shall cover all other content management
    needs
  • Sophisticated access rights management
  • Management of confidential documents (proposals,
    contracts)
  • Scan and OCR
  • Extension to users outside Sales organisation
  • Replacement of some legacy content management
    tools
  • But
  • No need for collaboration
  • No need for image and video storage
  • First target contractual documentation
  • step by step deployment

17
CARe Project
  • Mar. 03 Project started
  • Oct. 03 Entry into service
  • Development effort lt 6 man.months
  • Capitalize on Marvel development
  • Same integration company
  • Similar screen designs
  • Same server architecture
  • Next steps
  • Legacy OCR recovery
  • Ensure confidentiality
  • Add more document types
  • Link to legacy applications

18
CARe screen
19
CARe Search Result
20
CARe Marvel Architecture
Active Directory Server
Exchange Server
  • Users PC (web access and Livelink explorer)

LDAPNTLM
HTTPTCP/IP
SMTP
  • Network 152.x
  • Network 130.1.x

TCP/IP CIFS
  • Sun V880 SOLARIS 8 Database server- Oracle
    8.1.7.4
  • (dedicated for CARE MARVEL)

SQLNET
CARe Metadata
CARe documents
CARe Index
Marvel Metadata
  • Proliant DL380 Windows 2000 serverLivelink
    9.1 sp3 (index server only for CARE MARVEL)
  • 2 x Proliant ML570 Windows 2000 serverLivelink
    9.1 sp3 (application web server)

Marvel documents
CARe index
Backup server
21
Conclusion and Lessons learnt
  • Both implementations confirm that LiveLink was
    able to adapt to our needs
  • Rapid development of user friendly content
    management environment
  • Good integration with Office and Windows
    environment
  • Supports nomad populations
  • Easy to use
  • Content management needs high user involvement
  • Establishing a stable filing plan needs a
    professional
  • License costs are higher than development cost
  • Tuning of the technical architecture is key
  • Teamwork made it happen!

22
(No Transcript)
23
This document and all information contained
herein is the sole property of AIRBUS S.A.S. No
intellectual property rights are granted by the
delivery of this document or the disclosure of
its content. This document shall not be
reproduced or disclosed to a third party without
the express written consent of AIRBUS S.A.S. This
document and its content shall not be used for
any purpose other than that for which it is
supplied. The statements made herein do not
constitute an offer. They are based on the
mentioned assumptions and are expressed in good
faith. Where the supporting grounds for these
statements are not shown, AIRBUS S.A.S. will be
pleased to explain the basis thereof.
Write a Comment
User Comments (0)
About PowerShow.com