Non-Linear Implementation Plan
  • ODOT Central Services
  • Asset Management

July 21, 2006
2
Non-Linear Assets
  • Support Services and Information Systems are
    currently drafting an Implementation Plan to
    support long-term planning of ODOTs non-linear
    assets including
  • Rolling Stock (fleet, parts, etc.)
  • Facilities
  • Property
  • Inventories
  • Information Technology Components
  • These asset groups are managed through a number
    of information systems, many of which are not
    meeting current business needs.

3
Implementation Plan Purpose
  • To provide a framework for the successful
    integration of Asset Management principles,
    practices and processes into ODOTs everyday work
    of managing its non-linear assets.
  • This framework will be in the form of specific
    action steps that support the Vision, Mission and
    Goals outlined in the ODOT Asset Management
    Strategic Plan.

4
Background
  • ODOT tracks and reports value on real property
    (i.e., buildings and land), personal property
    including capital (i.e., fleet equipment), and
    non-capital equipment (e.g., most personal
    computers) located throughout the state.
  • Support Services Branchs Facilities Section
    reports 1093 active buildings of which 388 are
    occupied totaling approximately 310.8 million in
    replacement value.
  • Right of way property (land) is comprised of
    thousands of individual parcels at an estimated
    acquisition cost of 1.45 billion.
  • Information Systems Branch lists over 15,000
    managed IT assets worth approximately 24.7
    million in acquisition costs.
  • Support Services Branchs Fleet Section tracks
    over 5,000 light fleet, heavy fleet and
    attachments with a replacement value totaling
    approximately 220 million.

5
Implementation Plan Goals
  • The three Goals to support non-linear asset
    management are
  • Goal 1 The establishment of data governance of
    non-linear assets, assessment of department
    programs use of asset data, cross-functional gap
    analysis work to determine the improvement plans,
    and completion of short term program
    improvements.
  • Goal 2 Improve/replace selected department
    system(s) and develop program reporting
    capabilities.
  • Goal 3 Establish the means to integrate the use
    of linear and non-linear asset information
    throughout ODOT for optimal program decision
    making.

6
Participants
  • Potential Steering Committee Members include
  • Support Services Fleet
  • Support Services Facilities
  • Public Transit
  • Information Systems
  • Financial Services
  • Highway
  • Advise DMV, MCTD, Transportation Safety, and Rail
    about the option of participating

7
Timeline
  • Draft Implementation Plan nearly complete
  • Currently under review by Support Services and
    Information Systems staff to be completed
    08/11/2006
  • Create Steering Committee by 08/14/2006
  • Anticipate Steering Committee review 08/14/2006
    through 08/25
  • Finalize Plan 08/31/2006

8
Areas that will need further discussion whether
they are linear or non-linear
  • State Rest Areas (SRAs)  Typically Facilities
    tracks the buildings and grounds and Highway
    tracks the roadways, however, in most cases the
    entire SRA is in the Right-of Way (ROW)
  • Radio Sites Facilities reports the buildings as
    non linear assets and ISB tracks the equipment.
  • Scale Sites Facilities reports the buildings as
    non-linear Motor Carrier tracks the scale
    equipment, and Highway tracks the pavement. 
    Again, in most if not all cases scale sites
    reside in the ROW.
  • ROW land This is a third category that I dont
    believe is tracked in linear or non linear?

9
  • Questions / Comments?
Write a Comment
User Comments (0)
About PowerShow.com