iGantt 3D Production Scheduling - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

iGantt 3D Production Scheduling

Description:

iGantt can be used for scheduling a single operation or multiple operations ... Optional Auto-scheduling (target-based) module. Features. Definable Attributes ... – PowerPoint PPT presentation

Number of Views:85
Avg rating:3.0/5.0
Slides: 19
Provided by: mine6
Category:

less

Transcript and Presenter's Notes

Title: iGantt 3D Production Scheduling


1
(No Transcript)
2
iGantt 3D Production Scheduling
3
iGantt Usage
  • iGantt is a tool for open-pit and underground
    production scheduling that integrates Gantt
    chart, 3D visualization and spreadsheet views of
    a production schedule.
  • iGantt can be used for scheduling a single
    operation or multiple operations across an
    enterprise.

4
iGantt Iron Ore Setup
5
iGantt Components
Report Window
6
Data Interfaces
7
Geometry Imports
  • Solids
  • Vulcan (.00t), Surpac (.dtm), Datamine (.dm)
  • DXF (.dxf)
  • Strings
  • Vulcan (.dgd), Surpac (.str), Datamine (.dm),
    Micromine
  • DXF (.dxf)

8
Scheduling Methods
  • Visually from 3D view in context of assigning
    and sequencing digging equipment
  • Gantt chart based scheduling
  • Scheduling ancillary activities (drill and
    blast) to tie in with production
  • Optional Auto-scheduling (target-based) module

9
Features
  • Definable Attributes and Activity Types
  • Assign precedences between Activities with
    optional allocation of lag
  • Definable Reports
  • Define View by Attributes (Mine, Pit, Bench,
    Blast, Block)
  • Calculable attributes (a1 f(a2,a3))

10
Scheduling Methods
  • Graphical / Visual Scheduling with Gantt chart
    based scheduling
  • Automatically generate activities from
    production schedule with precedences

11
Interactive Scheduling
  • Interactive Gantt Chart-based Scheduling
  • Linkage between 3D view and Gantt chart
  • Click on a geometric object (solid or polygon) to
    see when it is scheduled
  • Click on a iGantt chart bar to see where it is in
    the mine

12
Resource Scheduling
13
Stockpiling Module
  • Automatically compute stockpile runs
  • Splits out defined products
  • View composition of stockpile as you schedule
    mining production

14
Lump and Fines Stockpiles
15
Stockpiling Module
  • Combination of equipment scheduling with
    stockpile run management
  • Stockpiles are grouped according to type, each of
    which is linked to an individual quantity
    attribute and Capacity.
  • Match stockpile completions to production
    requirements

16
Stockpile Run Reports
  • Generate Stockpile Run Reports

17
Auto-Scheduling Module
  • Auto-generate precedences based oon geometry of
    mining block polygons
  • Select a target grade
  • Auto-schedule
  • Longer-term applications

18
iGantt Summary
  • Easy to use visual scheduling
  • Open cut or Underground
  • Integrate long-term with short-term
  • Two way integration with GMP
  • Integration with corporate databases
  • Powerful scripting capabilities