LINK 2000 PSG 20
Link Integration Team Report Augustin Gheorghe
European Organisation for the Safety of Air
Navigation
2
LIT Status Report
  • LIT 2008 Objectives
  • Pioneer Airlines Activities
  • Air-Ground Communication Service Providers
    (ACSPs)
  • ANSPs
  • Avionics Providers
  • LINK2000 Baseline Definitions
  • L2K Guidance Material Development
  • L2K Test Facility
  • Link2000 Central Reporting Office
  • VDL Mode 2 Activities
  • Latest LIT Achievements and Milestones
  • Next LIT Events

3
LIT 2008 Objectives
  • Specific LIT Objectives for 2008
  • Conclude on the target NPD
  • Develop Guidance to Implementers (Airlines and
    ANSPs) based on lessons learned from Pioneer
    Phase
  • Advance on VDL2 Focus Group related subjects
    including Multi-frequency standardisation
  • Enhance the LSAT (Link Statistics Reporting Tool)
    with additional capabilities including airline
    specific reports
  • Provide concrete technical support to ANSPs and
    Airlines
  • Perform Initial Interop Testing with avionics
    implementation supporting PM-CPDLC

4
Pioneer Airlines Activities
  • Airworthiness Approval
  • Completed for all but Lufthansa Cityline
    imminent
  • MUAC Proving Flights
  • Recently done TUIFly (B737), Alitalia (A321)
  • Malev delayed due to training issues
  • Last to be performed Lufthansa Cityline
    (expected 1Q 08)
  • Non-funded Pioneer Airlines
  • Non-funded airlines entering operations by virtue
    of new-build aircraft
  • Subject to completion of OPS approval Proving
    Flight

5
ACSPs
  • Achieved ARINC ? SITA Interconnection (Dec. 07)
  • Major achievement !!!
  • ENAV to provide Comm Service (in co-op with
    ARINC)
  • In line with DFS ( AENA) approach of VM2 network
    deployment
  • Proliferation of air-ground routers to be further
    addressed
  • In principle ARINC SITA plus DFS, AENA, ENAV,
  • White Paper out for comment
  • Resolution to be reflected within Network
    Planning Document

6
ANSPs
  • LIT focus shifts
  • From getting Pioneers flying (with certified
    avionics and operationally accepted ACSPs) to
  • Closer technical co-ordination with ANSPs
  • (Mildly) intensified LIT-ANSP co-ordination
  • Safety-focused PreLIT11 (Lisbon) gathering DFS,
    skyguide, DSNA, NAV, MAAS UAC
  • PreLIT12 addressed (Hot) stand-by datalink
    processing systems

7
Avionics Providers
  • Honeywell (MK-II)
  • PM-CPDLC delayed by one year minimum (early
    2010)
  • Embraer planning of avionics upgrades initiated
  • Airbus (ATSU)
  • PM-CPDLC planned to be available by Q3/Q4 2009
  • Rockwell-Collins
  • CMU-900
  • Further enhanced ATN SW released
  • PM-CPDLC monitoring Implementing Rule
    progress/airlines interest
  • VDR920 issues corrected connection interruption
    (provider aborts)
  • SBs available for both Boeing and Airbus versions
  • LIT Focus get PM-CPDLC certified operational

8
Link2000 Baseline
  • Link2000 Baseline is stable (V 1.4)
  • Referenced from the EASA AMC 20-11 published
    Dec. 07
  • Basis for development of datalink IR MOC
    (Eurocontrol Spec.)
  • No further Baseline version roll-out
  • When ready, the EUROCONTROL Spec will formally
    replace the Baseline

9
L2K Guidance Material Development (1/2)
  • Frozen Guidance Documents Package
  • ED-120 Guidance Document
  • Common agreed engineering interpretation of
    ED-120
  • Generic ACSP Requirements Document
  • Proposed to L2K ANSPs as basis of ACSP SLA
    establishment
  • Possible revisions at later stage of Link2000
    wide deployment
  • Using more real-time statistics operational
    feedback

10
L2K Guidance Material Development (2/2)
  • Network Planning Document
  • High level guidance on the LINK 2000
    communication infrastructure
  • To be amended through institutional solutions
    (preference)
  • ANSPs as ACSPs (transparent interconnection
    through ARINC ?? SITA)
  • Limited A/G router proliferation
  • ATN Service to Non AOC airlines (by alternative
    ACSP)
  • Guidance to Implementers of L2K
  • Ground and Airborne
  • Collecting lessons learned from the Pioneer Phase

11
L2K Test Facility
  • Continued intensive support of
  • ARINC ? SITA Interconnection
  • French DSNA - EVALINK validation activities
  • Airline certification tests
  • ACSP network performance interconnection issues
    investigation
  • October 2007 flight trial campaigns
  • Investigation of issues exposed by lab tests and
    early pioneer airline experience
  • Testing of updated Rockwell-Collins VDR920 both
    with RC HNY CMU
  • Re-evaluate coverage and performance of the ARINC
    ATN/VDL service

12
Link2000 Central Reporting Office
  • L2K CRO - focal point for provision of feedback
    on the operational technical use of L2K CPDLC
  • Statistics Reporting
  • Initial LInk Statistics reporting and Analysis
    Tool (LISAT) ready
  • Airline request for database access in next
    enhancement step
  • Other enhancements under consideration (e.g.
    inclusion of PRISME data)
  • Monthly Statistics Reporting to start soon
  • Communication via public or private web space

13
VDL Mode 2 Activities
  • VDL2 Focus Group
  • Met first time as PreLIT12 meeting
  • Coordinated L2K White Papers for injection into
    AEEC ARINC-631 update process (feeding-back from
    the various flight trials)
  • Input to multi-frequency standardisation
    activities
  • VDL2 Monitoring Activities
  • Joint Link2000 and COM Domain activity
  • Detect non-compliance to standards as soon as
    possible
  • Interoperability efficiency, protecting
    performance spectrum
  • Monitor traffic growth and timely prepare
    channels deployment

14
VDL Mode 2 Standardisation
  • Full Link2000 deployment (together with AOC
    traffic migration to VDL2) requires more than 2-3
    channels
  • AEEC A631-5 update almost completed
  • Autotune solution plus dedicated frequency at
    airports
  • Plus other L2K proposed amendments (White
    Papers)
  • Ongoing refinement of details
  • Group review and agreement expected by April 08
  • Document publication expected by Oct/Nov 08
  • To become part of PM-CPDLC product developments

15
Summary LIT Achievements to Dateand Upcoming
Milestones
  • Finnair Dec 06 MUAC proving flight
  • LTU Mar 07 MUAC proving flight
  • DLH Apr 07 MUAC proving flight
  • SITA May 07 waiver lifted
  • HLX Jul 07 MUAC proving flight
  • LIT Q4 07 Availability of Initial CRO Tool
  • LIT Q4 07 Resolution of VDL Mode 2 Papers
  • ARINC ? SITA Interconnection Q4 07
  • Cityline Q1 08 CERT with Rockwell-Collins
    CMU/VDR4000
  • Malev Q2/Q3 08 MUAC proving flight
  • Initial PM-CPDLC tests Airbus Q1 08

16
Next Events
  • LIT13 on 20 Feb 08 in Reims EVALINK
  • 19 Feb 08 reserved for PreLIT13

17
THANK YOU