Transcript and Presenter's Notes

Title: EU-GRID Work Program


1
EU-GRIDWork Program
  • Massimo Sgaravatto INFN Padova
  • Cristina Vistoli INFN Cnaf
  • as INFN members of the EU-GRID technical team

2
RD Program
  • Work Packages (preliminary list)
  • Computing Fabric Management (T. Smith)
  • Mass Storage Management (O. Barring, J.F. Baud)
  • Wide Area Data Management (J. Jaen, B. Panzer, W.
    Hoschek)
  • Wide Area Workload Management (M. Sgaravatto, C.
    Vistoli)
  • Wide Area Application Monitoring (E. Futo)
  • Application Development
  • Testbeds (???)
  • Presented and discussed during the Grid Workshop
    (7 Mar.)

3
Computing Fabric Management
  • The management of the hardware and basic
    software required for the local computing fabric
    the processors, disks, tape drives and robots,
    the equipment providing the local area and
    storage networks, operating system installation
    and maintenance, file systems, SANs, gateways to
    external networking facilities, monitoring
    consoles, power distribution, etc
  • No preliminary draft document presented

4
Mass Storage Management
  • The software required to manage the mass storage
    system secondary and tertiary storage space
    management, migration of data between tertiary
    and secondary storage, provision of classes of
    service to schedule access to the same data from
    processes with different priorities
  • Preliminary draft document presented covering HEP
    needs and state of the art (no details on work
    needed, work plan, )

5
Wide Area Data Management
  • Universal name space, efficient data transfer
    between sites, synchronisation of remote copies,
    wide-area data access/caching, interfacing to
    mass storage management systems
  • Preliminary draft document (prepared by 8
    persons) presented
  • 3 Phases
  • 1 year/phase
  • 4-5 persons/year (preliminary assumption)

6
Wide Area Data Management - Phase 1
  • Design and prototype the basic infrastructure
    (lower
  • level services)
  • Security
  • Data Access
  • Data Location
  • Data Migration
  • Data Replication
  • Metadata Publishing and Management

7
Wide Area Data Management Phase 2
  • Leverage the lower level services delivered by
    Phase 1,
  • and build higher level services on top of them
    (not
  • sufficiently well defined)
  • Maintain sets of logically related files
  • Query optimisation and estimation
  • Access Pattern Management
  • Transactions
  • Transparent Access

8
Wide Area Data Management - Phase 3
  • Not yet worked out in detail
  • Prototype data grid enabled HEP analysis
    environment
  • Provide tools for location and DB independence
    and seamless data integration

9
Wide Area Workload Management
  • Scheduling of work submitted by users
  • Scheduling support taking account of relative
    priority levels, data location, automated
    parallelisation of work
  • APIs and GUIs which provide users access to the
    distributed computing facility
  • Preliminary draft document presented

10
Wide Area WorkLoad Management
  • Job description and resource specification
  • Job decomposition
  • Scheduling
  • Definition of scheduling policies in order to
    find the best match between job requirements and
    available resources

11
Wide Area Workload Management
  • Co-Allocation Reservation
  • Co-allocation necessary because many applications
    need simultaneously multiple resources
  • Advance reservation necessary to guarantee
    end-to-end QoS
  • Resource Management
  • Implementing scheduling policies
  • Services
  • Bookkeping
  • Accounting
  • Logging

12
Wide Area Application Monitoring
  • The instrumentation of applications, and tools
    to analyze dynamically the performance of an
    application in a GRID environment automatic
    recognition of application-level performance and
    resource problems automatic re-configuration of
    the applications resources and rescheduling of
    the application components
  • Presentation on Application Monitoring problem
    and status (no details on work needed, work plan,
    )

13
Wide Area Application Monitoring
  • Integrate performance measurement with realtime
    performance visualization and adaptive control of
    application behavior and resource policies
  • Migration from static resource optimization based
    on a posteriori measurements to closed-loop
    adaptive control using realtime data streams

14
Application Development
  • The seamless integration of existing end-user
    applications with GRID middleware and the
    development of new, grid-aware applications is an
    important component of any testbed and pivotal to
    the success of the project
  • Not charged to the technical group addressed to
    physicists