Title: Animal Feeding Operations Construction Permits


1
Animal Feeding OperationsConstruction Permits
  • Sara Smith, Ph. D.
  • Environmental Engineer

2
Animal Feeding Operations Construction Permit
Processes
  • Requirements in
  • Iowa Code section 459 and 459A
  • 567 Iowa Administrative Code (IAC) chapter 65
  • There are two processes - streamlined
  • A) Confinements (reduced steps from 81 to 51)
  • B) Open feedlots (reduced steps from 58 to 18)

3
Confinements567 IAC Chapter 65 - Division I
NRCS
4
Construction Permit Requirements Confinements
  • Unformed storage or egg washwater
  • Formed storage with 1,000 AU or more
  • Increasing volume
  • Repopulating after 24 months
  • Installing a permanent manure transfer piping
    system
  • For details, see 567 IAC 65.7(1)

5
Animal units
6
ConfinementsNew Permit Process Since July 2005
  • Record number of applications
  • Improved kaizen process developed by
  • DNR
  • Livestock industry
  • Iowa Pork Producers Association
  • Contractors
  • Initial check for completeness
  • Notify county
  • Decision is made - 60 days

7
Applying for a Confinement
  • Submittal checklists
  • No. 1 - Formed storage -no engineer
  • No. 2 - Formed storage engineered OR unformed
    storage
  • Simplified complex requirements into items 1-9,
    plus 4 attachments

8
Threshold Requirements for Engineer
Requires an engineer if proposing formed storage
and operation is
  • Farrowing/gestation with 1,250 AU or more
  • Farrow to finish with 2,750 AU or more
  • Cattle or dairy with 4,000 AU or more
  • Any other with 3,000 AU or more

9
Departmental Review Checklists for Confinements
  • Two internal checklists
  • Formed storage -no engineer, 2 pages
  • Formed storage engineered or unformed storage,
    5 pages
  • Different design criteria -CDS vs. plans, soils
    and hydrogeologic report

10
Internal Review Checklist for Confinements
  • Alluvial soils - Flood Plain clearance
  • Karst or sinkholes
  • Upgraded concrete standards
  • Soils exploration
  • Unformed storage prohibited
  • Field Office Report
  • Distances
  • MMP
  • DNRs evaluation

11
Internal Review Checklist for Confinements
  • Geologist review
  • Soils exploration -karst/sinkhole -formed
  • Soils and hydrogeologic report -unformed storage
  • Boring requirements
  • Groundwater measurements
  • Plugged all cores
  • Monitoring required
  • Other permits

12
Formed or Unformed Storage-Engineering Review-
  • Engineering report
  • Drainage certification
  • Technical specs
  • Engineering plans
  • Plan view and cross sectional views
  • Dimensions
  • Storage capacity
  • Freeboard
  • Unformed storage
  • Berm width
  • Erosion control
  • Groundwater separation
  • Artificial lowering
  • Liner specifications
  • Percolation rate
  • Or, Construction Design Statement (CDS)

13
Internal Review Checklist for Confinements
  • County participation
  • Proof of public notice
  • Notice - adequate
  • Matrix evaluation
  • Recommendation received within 30 days
  • Public comments
  • Does application meet legal requirements?

14
Confinement Application Meets Legal Requirements
  • No master matrix, or late countys recommendation
  • DNR issues permit
  • Passed matrix with timely recommendation
  • Notice of Intent
  • 14 days
  • No County appeal - issue permit
  • County appeals - EPC

15
Confinement Application Meets Legal Requirements
//..
  • Didnt pass the matrix with county
  • DNR - Matrix independent verification
  • If passes - Notice of Intent, etc.
  • If it doesnt pass - Preliminary denial - Appeal

16
Confinement Application Doesnt Meet Legal
Requirements
  • Send letter of preliminary denial and reasons
  • May appeal to EPC - 14 days
  • If not appeal, it becomes final
  • Can re-apply

17
B) Open Feedlots567 IAC Chapter 65 - Division II
18
Construction Permit Requirements Open Feedlots
  • Open feedlot required an National Pollutant
    Discharge Elimination System (NPDES) permit -
    Construction
  • Permitted open feedlot increasing
  • AUC
  • Basin volume
  • Repopulating - 1,000 AU, discontinued for 24
    months
  • For details, see 567 IAC 65.105(1)

19
Open Feedlots New Permitting Process
  • Kaizen Nov. 2006
  • DNR
  • NRCS
  • ISU Extension
  • Livestock group declined
  • Optional
  • Pre-application meeting
  • In person or conference call
  • Explain requirements
  • Avoid delays

20
Open Feedlots
  • Pre-application meeting scheduled within 10 days
  • Application reviewed and decision made within 60
    days
  • Old process was 180 days, on average
  • Electronic submittal?

21
Resources for Livestock and Poultry Producers
  • www.iowadnr.gov Under choose a program, select
    Animal Feeding Operations
  • AFO-Listserve electronic newsSend e-mail to
    join-Animal_feeding_at_lists.ia.gov
  • AFO Engineers (515) 281-8941
  • Nearest DNR Field Office

22
AFO Siting Atlas
23
To Download the AFO Rules
  • http//www.legis.state.ia.us/
  • Click on "Iowa Law"
  • Click on "Iowa Administrative Code"
  • Click on "PDF Format"
  • Scroll until you find
  • "Environmental Protection Commission
  • "Chapter 65 - Animal Feeding Operations
  • Click on "567-65.DOC