1Minor / Major Non-Conformity
- Report from the CWPCP Inspection Program
2Common Non-Conformity
- 1. clarity of stamp
- Elements missing IPPC or HT
- Faded stamp
- Positioned over a Grading Stamp
- Incorrect rubber
- Incorrect ink for wood
- Missing stamp on one side
3Common Non-Conformity
- 2. IPPC ISPM No. 15 stamp inaccurate
- Incorrect stamp IPPC diagonal/on side or very
small - No box around stamp
- Date inside box
- Information of RF inside stamp box
4Common Non-Conformity
- 3. Quality Manual out of date or not available
- QM not current address change or change of
quality supervisor - QM not available
- Training not current or non existent
- QM not followed simply do what they like to
complete the work
5Severe Major Non-Conformity
- 4. Falsifying Kiln Records
- Setting kiln time for timber diameter smaller
than the diameter HT - Using record for one charge to cover many charges
- Setting kiln time for coniferous when timber is
mixed conifer/deciduous
6Major Non-Conformance
- 5. Scrubbing off of ISPM No. 15
- Domestic pallets with ISPM No. 15 foreign stamp
still showing - Not blocking the old ISPM No. 15
mark prior to sale - Use of stripped stringer for sale as recycled
pallet still showing foreign ISPM No. 15 mark
7Major Non-Conformance
- 6. Continued use of BUG MARK
- 7. Ignorance of CWPCP program and use of home
made stamp - 8. Stamping pallet kits with ISPM No. 15 mark and
selling to registered and non-registered
facility. - 9. Making appt with inspector and not attending
8Non-Conformity
- 10. No alternate Quality Manager on site when
you, the Quality Manager is off site or on
holidays. It is a major non-conformity if you are
on holidays/off site/sick/funeral and your plant
continues to mfg. certified ISPM No. 15 wood
packaging. - Why?? There is no opportunity for a report of a
non-conformity by an employee. Therefore, when
the QM is off site the employee simply allows the
error to continue.
9Non-Conformity
- 11. Segregation of Material
- 13. Certification of kiln
- 14. Correct Kiln settings for HT of product
- 15. Posting of QM and D-01-05