Title: Preliminary Restoration Design


1
A Quick Update on Tidal Marsh Restoration Efforts
in Eden Landing
Matt Wickland, PE m.wickland_at_pwa-ltd.com Philip
Williams Associates, Ltd.
2
(No Transcript)
3
  • Levees constructed to convey watershed runoff
    through the salt ponds - Over time channels fill
    in with sediment and salt ponds subside
  • Levee lowering/ removal causes channel scour
    marsh sedimentation
  • Salt pond restoration reduces fluvial flood
    hazards by improving conveyance to the Bay

4
(No Transcript)
5
880
Ardenwood Blvd
6
  • All three alternatives show reduction in SPF
    water levels because of larger capacity and
    through-pond routing
  • More sustainable design no dredging required
  • Meets SBSP habitat restoration objectives

Levee crest
Existing Water Surface
Post-project Water Surface
7
(No Transcript)
8
(No Transcript)