Title: ROLLING STOCK PROGRAMME AND M
1ROLLING STOCK PROGRAMME AND MPPROGRAMME
- BY
- CHANDAN K. VERMA
- IRAS(P)
2ROLLING STOCK PROGRAMME
- The RSP is meant to cater the need of Rolling
Stock i.e. - locos, wagons, coaches, cranes, ART, etc.
- The provision of RSP is of two kind
- On Replacement Account
- New Acquisition
- Renewal of Rolling Stock is always given
preference over Additions. - It is prepared before 15 to 18 months before its
commencement.
3Preparation Of RSP
Workshops/ sheds Depots
F.A.C.A.O Fin. Concurrence
COM Initiate RSP
CME consolidation
GMs Approval
Itemised Rolling Stock
Allocation Of Funds Bulk Item Non-Bulk Item
Parliament Budget estimate of Demand No.-16
Railway Board (Till 30th oct.)
Pink Book
4M P PROGRAMME
- MP programme is prepared for ensuing year in the
current year. - The estimate of MP bear- provision for charges
such as freight, insurance, installation
commissioning, DG charges, custom duty, etc. - The COFMOW specification no., type capacity of
machine is mentioned against the machine
proposed. - MPs are procured through COFMOW only.
5Contd..
- MP item costing above Rs One crore each require
Railway Boards prior approval for inclusion in
regular MP programme. - MP costing up to 1 Lakh each- directly from
Revenue. - New acquisition are accompanied with Rate of
Return. - In 02-03 Budget outlay for MP programme- Rs 175
crore.
6Preparation Of MP Programme
Proposals of W/S, Sheds, depots Vetted by Assoc.
Finance
CME Consolidation
GMs Approval
F.A.C.A.O. Fin. Concurrence
Railway Board
Procurement Through COFMOW
Pink Book
Parliament Part of budget Estimate Demand No.-16
Allocation Of Fund
7MP Programme of CR for 02-03(Fig. In
Thousands of Rupees)
Sr. No. Particulars No. of Items Allocation Estimated Cost Outlay to the End of 01-02 Outlay proposed for 02-03 Bal. To Complete Work
A Prog. Del.
A.1 Items Costing gt50 lac 14 236587 69751 10259 15767
Cap. DRF 5031 5248
A.2 Items costing lt50 lac Cap. DRF DF(2) OLWR 14470 30358 7877 5376
B New Acquisition
B.1 Items costing gt50 lac 32 7881 8
Cap. DRF 1 7
B.2 Items costing lt50 lac Cap. DRF DF(2) OLWR 1000 12000 5000 2000
8RSP Programme of CR for 02-03
Sr. No. Particulars No. of Items Allocation Estimated Cost Outlay to the End of 01-02 Outlay proposed for 02-03 Bal. To Complete Work
A Prog. Del.
A.1 Locos
A.1.1 Items Costing gt50 lac 164 Cap. DRF 164657 112756 27753 13700 14053 24142
A.1.2 Items costing lt50 lac Cap. DRF 6100 4333
A.2 Carriages
A.2.1 Items Costing gt50 lac 50 DRF 1250000 1 1 1249998
A.2.2 Items costing lt50 lac Cap. DF(3) 3207 1
B. New Acquisition
B.1 Locos
B.1.1 Items Costing gt50 lac 8 Cap. DRF 32575 32575 24800 7775
B.1.2 Items costing lt50 lac Cap. 17255
9THANK YOU
10Itemised RSP
- All the items costing 50 lakh or more are shown
separately. - It has two parts
- 1.Works-In-Progress - Works taken during
earlier years are under
pipeline and yet to be completed in current or
ensuing year. - 2. New Acquisition New items under taken
during the current year. - All works costing less than 50 lakh appear as one
item in Pink Book.
Back
11Budget Provision For RSP
- Funds for RSP is allocated form Capital, DRF and
DF. - Funds allotted for Bulk order items are
controlled by Railway Board. - Funds for Non-Bulk items are distributed to
various railways based on their itemised RSP.
Back