A presentation for - PowerPoint PPT Presentation

About This Presentation
Title:

A presentation for

Description:

Energy Star Ceiling Fan Industry Meeting World Trade Center, Dallas, Texas June 24, 2002 ... failure analysis, life cycle, product comparison, ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 16
Provided by: K283
Category:

less

Transcript and Presenter's Notes

Title: A presentation for


1
A presentation for
Energy Star Ceiling Fan Industry Meeting
World Trade Center, Dallas, Texas
June 24, 2002
2
ITS Global Network
  • Largest product and commodities testing
    organization in the world
  • More than 2 million annual inspections,
    certifications, and tests performed worldwide
  • 254 laboratories around the world
  • 504 offices in 99 countries
  • More than 10,400 employees worldwide
  • Publicly offered on the London Stock Exchange

3
Over 100 Years of History
  • Founded by Thomas Edison in 1896 to verify light
    bulbs his company was manufacturing
  • Expanded into performance testing of a broad
    spectrum of manufactured goods
  • First product certification program was developed
    with Certified Ballast Manufacturers (CBM) in 1941

4
NRTL Accreditation - What It Is
  • NRTL accreditation is the benchmark for
    excellence for product safety certification
    laboratories in the United States.
  • Laboratories are accredited by the U.S.
    Occupational Safety and Health Administration for
    5 years, and then audited by OSHA for continued
    accreditation.
  • An NRTL must be qualified both to test products
    and to certify products.
  • Certification includes periodic factory audits to
    assure that manufacturers continue to produce
    products in accordance with the factory audit
    manual.

5
Services Available at ITS Cortland IncludeTime
to Market - One Stop Shopping - All Services in
One Location
  • Noise - our Acoustical department offers a fully
    qualified 470 cu. meter reverberation room and
    hemi anechoic chamber
  • Airflow - per Energy Star specification, AMCA,
    HVI
  • Electrical Safety - testing conducted in
    accordance with UL 507
  • R D - failure analysis, life cycle, product
    comparison, durability

6
Energy Star Testing of Lighting Products
  • NVLAP Accredited Photometric Testing Laboratory
  • Regularly perform all lamp and ballast tests as
    required by Energy Star, including fixtures,
    traffic signals, Compact Fluorescent Lamps
    (CFL)
  • For Energy Star Testing of Lighting Products
  • All lamp and ballast combinations must be tested
  • Typical turnaround 3-4 weeks

Life Testing at our Cortland, NY Facility
Contact Todd Straka, Sr. Account Manager, for
pricing 607-758-6280 or tstraka_at_etlsemko.com
7
Cortland, NY Facility
  • 160,000 square-foot facility on 45 acres in
    Upstate New York
  • 250 engineers, technicians, managers, and
    administrative staff
  • Facility runs 24 hours/day, 7 days/week
  • Several one-of-a-kind test facilities
  • Test facility design and construction specialists

8
Cortland Ceiling Fan Test Facility
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
Ensuring Prompt and Accurate Testing and
Reporting
  • Submit new products complete with correct model
    number and manual
  • Use shipping label that was provided or reference
    quote number on box
  • Runtime all samples should be new, unused
    product. Additional runtime, other than what is
    already established can effect results
  • Failed units, must submit new sample for re-test
    light kits must be attached

15
  • Thank you!
Write a Comment
User Comments (0)
About PowerShow.com