Title: Energy
1Energy Water efficiency
- Refrigeration and Air conditioning Systems
Darshi Dhaliwal Climate Control Bureau Low
Energy Cooling Consultants
2Energy and Water Conservation
3Typical Air Cooled condensing Unit
4 Air Cooled V type condenser
5Air Conditioning
- WATER COOLED
- Packaged Units
- Packaged Chillers
- Central Plants
- District Cooling
- Industrial Cooling
- AIR COOLED
- Window units
- Split Units
- Ducted splits
- Package units
- VRF Systems
6Cooling Capacity Enhancement
7Reducing Condensing Pressure
8Lowering Energy Consumption
9Pad Type Pre Cooler
- 50High water use
- Prone to clogging
- No temperature control
- No water drain provision
- High life cycle costs
- Temperatures always 3-4 C above wet bulb
-
10Direct Evaporative Pre Cooler
11Pre Cooler Mollier Chart
12Solution-ID pre Cooler
ID pre Cooler
13 ID Pre Cooler-Mollier Chart
14Installation in Thailand
15 ID Pre Cooler-Magic
16Case Study-Dish Hospitality
- A ready to eat food facility at Mumbai
17Dish Hospitality
Capacity TR 106.5
EER _at_ 35C BTU/Watt 8
Energy Use kW/Hr 159.8
Actual Required Capacity with Pre Cooler TR 85.2
Capacity Saved TR 21.3
Installed Capital cost INR/TR 0.20
Capital cost savings INR 4.26
ID Pre Cooler Cost INR 11.72
OPERATING COSTS
EER _at_ 35C BTU/Watt 8
Energy Use without ID pre cooler kW/Hr 159.8
Energy Use with ID pre cooler kW/Hr 127.8
Energy saving kW/Hr 31.95
Energy Cost INR/kW 6
Monthly Working Hours 720
Monthly operating cost savings INR LACs 1.38
Simple Payback Period Working Months 5.4
18350 TR TRANE Air Cooled Electric Chiller
Trane Chiller- Client confidential Trane Chiller- Client confidential Trane Chiller- Client confidential
Capacity TR 351
Input Power kW 376
ROI
Capacity Increase with ID pre cooler TR 99
Power Savings kW 81
Annual Working Hours 3000
Power Tariff INR/kW 2.5
Demand charges INR/kW/month 275
Power saving/hr INR Lacs 6.1
Energy saving due to Enhanced capacity INR Lacs 5.2
Saving in Demand kW 150.3
Demand charge savings INR Lacs /Year 0.41
Total INR 11.7
Simple payback months 28.8
- Facility Manager JLL Meghraj, Bangalore
19Reliance Energy-Kakinada AP
Reliance Energy Kakinada AP Reliance Energy Kakinada AP Reliance Energy Kakinada AP
Capacity TR 250.6
EER _at_ 35C BTU/Watt 8
Energy Use kW/Hr 375.9
Actual Required Capacity TR 175.4
Capacity Saved TR 75.18
Installed Capital cost INR/TR 0.20
Capital cost savings INR 15.04
ID Pre Cooler Cost INR 27.57
EER _at_ 35C BTU/Watt 8
Energy Use without ID pre cooler kW/Hr 375.9
Energy Use with ID pre cooler kW/Hr 263.1
Energy saving kW/Hr 112.8
Energy Cost INR/kW 4
Monthly Working Hours 720
Monthly operating cost savings INR LACs 3.248
Simple Payback Period Working Months 3.9
- P.K. Shridhar, General Manager, Reliance
Infrastructure Limited
20Wet Cooling Towers
Water wasting systems
21Dry Cooling Towers
Energy wasting Systems
22Cooling Towers
- Wet bulb dependent
- Condensing Temp at least 10C above wet bulb.
- High fan maintenance
- Moderate System efficiency
- High water use
- High maintenance
- High Legionella spread threat
-
- Dry Bulb dependent
- Condensing temp 5C above Dry bulb.
- Higher fan Power
- Higher Noise levels
- Poor System Efficiency
- No water Use
- Less maintenance
- No Legionella threat
23Wet Cooling Tower for Chiller
24Closed Cycle ID cooling Tower
255CLower Condensing Temperature
Closed Cycle ID Cooling Tower
2610Energy Savings
Closed Cycle ID Cooling Tower
2780 water savings
Closed Cycle ID Cooling Tower
28Closed Cycle ID Cooling Tower
Advantages
- Approach to Dew point
- Condensing Temperature below ARI Rating
- Lower noise
- 80 lower water use compared to wet CT
- Lowest fan power
- Lowest Noise level
- Accepts recycled water
- Lowest maintenance
- No Legionella threat
29Climate Control Bureau daman-India
- For more information
- Darshi Dhaliwal
- Principal Consultant
- dd_at_ambiator.com