Title: Humidifiers for Every Application
1Humidifiers for Every Application
2NEW MH Series
- Launched in e-news
- Competitor Comparison
- Advertisement
- Whitepaper
- Manuals
- Brochure
- Quote Request Form
Launched February 16
3NEW GS Combustion Air Option
- Launched in e-news
- New pricing descriptions
- Installation manuals
Launched February 25
4NEW Links XPS
- Launch in e-news
- New part numbers
- Installation manuals
- Price pages
Launch March 4
5NEW The Nortec RoadShow
humidity.com
Hit The Road February 1
6Humidifiers for Every Application
7ShortAbsorption Manifolds Steam absorption
system for use in air handling units and duct
systems
8Overview
- SAM-e basics
- Why SAM-e?
- Why insulate?
- SS air gap insulation
- R-Value
- New product updates
9Why SAM-e?
- Short absorption distances are required
- Easy to install
- Lower cost easier to install than multiple
LS distributors - No maintenance required
- Can be used with atmospheric steam or pressure
(boiler) steam - Your AHU manufacturers like it!
10Why Insulate? SAM-e Insulated Option
- Reduce condensate losses and increase efficiency
- 1075 BTU Liquid Water 1 lb Steam
- 8.35 lbs Steam 1 US Gallon Wasted Water
- 1 US Gallon Wasted Water Over 8000 BTU Wasted
Energy
11Why Insulate? SAM-e Insulated Option
- Air stream heat gain
- Low humidifier output
- Low system efficiency
12Benefits of Insulation SAM-e Insulated Option
- Up to 70 condensate reduction
- 120F max surface temperature
- Reduce heat gain
- Improved efficiency
13SAM-e Insulated
Header Insulation
Tube Insulation
14Insulated Mini SAM-e
Header Insulation
Tube Insulation
15Principle of Operation Insulated Steam Tube Cross
Section
Cool Airflow
Stainless steel shielding
¼ Air-gap
Foam strips
Hot Steam
16Other Benefits
- Negligible effect on static pressure drop
- Shedding of dust and dirt
- Durability
- Maintenance inspection free
- Easily retrofitted (units purchased
after July 2008)
17New White Paper
- R-value represents a materials ability to resist
the transfer of heat - Condensate losses dependent on a number of
factors - Air temperature, duct velocity, distributor
configuration - Have you seen an insulated distributor spec
calling for - R-value not less than 0.5
-
18Insulation R-Value
Insulation Nortec Calculated Competitor Calcualted
Stainless Steel Shielded Air Gap 0.66 0.16 (average)
PVDF Insulation 0.23 0.56
19Insulation R-Value
R2
R1
R3
Fundamentals of Heat and Mass Transfer, 6th
edition, F.P. Incropera
20Example
Design Conditions
Duct air speed 1000 fpm
Duct air temperature 50F
Humidification load 435 lbs/hr
Distributor face dimensions 72 Wide x 48 High
Distributor Configuration 3 Centers 23 Distributor tubes 48 Long
21Example Competitor Calculations
- Total Length of tube
- 23 Tubes x 48 Each 92 Linear ft
- Total heat loss
- Stainless steel air gap
- 92 ft. x 441 Btu/hr/ft 40,572 Btu/hr
- PVDF
- 92 ft. x 190 Btu/hr/ft 17,480 Btu/hr
- Total condensate losses
- Stainless steel air gap
- 40,572 Btu/hr 970 Btu/lb 41.8 lbs/hr
- PVDF
- 17,480 Btu/hr 970 Btu/lb 18.0 lbs/hr
441
190
22Example Nortec Calculations
0.2
Total condensate losses 92 ft. x 0.2 lbs/hr/ft
18.4 lbs/hr
23Example
24SAM-e Internal Baffle
25SAM-e Internal Baffle
Internal Baffle Plate
26SAM-e Internal Baffle
- Eliminates the need for an external separator
- Simplifies installation
- Reduces overall system price by 200 - 300
- Available today!
27New SAM-e Warranty
2 Year Warranty
10 Year Warranty
28New SAM-e Warranty
29 30Nortec Webinar Program
Now available on humidity.com in the news
events section under webinars
Webinar Recordings PPTS
31William Truong Product Manager Steam
Distribution william.truong_at_waltermeier.com
Questions / Follow-up
32Humidifiers for Every Application