Title: Work Plan for IEEE 802.16m Standard
1Work Plan for IEEE 802.16m Standard
IMT-Advanced Submission
IEEE 802.16m-09/0019
2009-05-19
2Documents to be Developed in TGm
- TGm will develop the following documents as part
of 802.16m standardization process - System Requirements Document (SRD)
- A set of possible deployment scenarios and
applications of the 802.16m standard. - A set of performance targets and features that
802.16m compliantsystems shall meet or exceed. - Evaluation Methodology Document (EMD)
- A complete set of parameters, models, and
methodologies for the link-level and system-level
simulations that allow fair evaluation/comparison
of various technical proposals. - Channels Models A set of spatial channel model
parameters are specified to characterize
particular features of MIMO radio channels to be
used for simulating technical proposals for the
future 802.16m standard. - System Description Document (SDD)
- Architecture and design of the 802.16m air
interface amendment - Captures the core technical concepts behind the
features included in the amendment - Will enable analysis and/or simulations for
characterizing the coarse level performance
benefits of the air interface in association with
the Evaluation Methodology Document - 802.16m amendment
- 802.16 IMT-Advanced Proposal
3TGm Timelines
2007
2008
2010
2009
Q2
Q3
Q4
IEEE 802.16
Sep 07
Amendment Ready for IMT-Adv evaluation
Jan08
Amendment Feature Complete. EC Conditional
Approval for SB.
EC Conditional Approval for RevCom submission
Jan 09
Nov 07
Amendment Ready for Industry Release. RevCom
submission
ITU based Updates
Jan 09
Sept 09
Jan10
Nov 08
May 10
July 09
Jun 08
Jun 08
ITU based potential updates
Oct 08
Jan09
Oct 09
Jun 10
ITU-R WP5D
3
3
System Requirements and Evaluation Methodology,
System Description, IMT-Advanced Proposal
Documents may be further updated based on ITU
output (shown by dotted lines).
4Process for staging 802.16m Amendment feature
development
PHY/MAC features required for IMT-Advanced for a
working system
P802.16m draft
AWD
SB
WG LB
75
Feature inclusion vote
50
Final feature addition meeting
50
Amendment Feature development -Feature developed
as a RG contribution to TGm -Finally included
only as a complete proposal, not a partial
one -Develop as a self contained clause/subclause
unless it is essential -Do not put place holders
in Amendment till the feature is ready. (SDD will
still have all features) -RGs should track
Amendment development for consistency -WG LB
recirculation scope should allow feature
addition -All features have to go thru at least
one WG LB recirculation
RG
RG
RG
Next Project (New PAR)
RG
AWD Amendment Working Doc RG Rapporteur
Group LB Letter Ballot SB
Sponsor Ballot
5Feature RG process for the Amendment
- Feature Rapporteur Groups (RG) will develop
contributions for adoption by TGm as per Process
(in previous slide) - RGs will be authorized/re-authorized at each TGm
session - TGm will provide final deadlines for completion
of RG work. - RG must start with a work plan based on TGm final
deadlines. - RGs must report progress at every TGm session
- RG final output contribution must be complete by
TGm deadlines for adoption into the AWD/Draft - RGs may meet during TGm sessions
- RGs can arrange teleconferences with 7 day
advance notice - RGs conduct straw polls for decision making
- RGs are open to all participants
6Amendment Feature RG timelines
SDD Chapter Features to be discussed in RGs Essential for IMT-Adv. at Amendment level detail CFC Issued for Feature RG Target for completion
12 Inter-Radio Access Technology Functions (No SDD text) No NA ----
13 LBS No To be decided in July09 Nov09
14 E-MBS No To be decided in July09 Nov09
15 Relay No To be decided in July09 Nov09
16 Co-deployment and Co-existence (No SDD text. Section deleted this session) No NA ----
17 Femtocell No May09 Sept09
18 Self organizing networks No To be decided in July09 Nov09
20 Interference Mitigation No Mar09 Sept09
22 Inter-ABS Synchronization No To be decided in July09 Nov09
6