Cost Behavior Analysis
Chapter 3
2
Types of Cost Behavior Patterns
Recall the summary of our cost behavior
discussion from Chapter 2.
3
The Activity Base
A measure of the event that causes the incurrence
of a variable cost a cost driver
4
True Variable Cost Example
  • Your total long distance telephone bill is
    based on how many minutes you talk.

Total Long DistanceTelephone Bill
Minutes Talked
5
Variable Cost Per Unit Example
  • The cost per minute talked is constant. For
    example, 10 cents per minute.

Per MinuteTelephone Charge
Minutes Talked
6
Step-Variable Costs
Total cost remainsconstant within anarrow range
ofactivity.
Cost
Activity
7
Step-Variable Costs
Total cost increases to a new higher cost for
the next higher range of activity.
Cost
Activity
8
The Linearity Assumption and the Relevant Range
EconomistsCurvilinear Cost Function
Total Cost
Activity
9
Total Fixed Cost Example
  • Your monthly basic telephone bill is probably
    fixed and does not change when you make more
    local calls.

Monthly Basic Telephone Bill
Number of Local Calls
10
Fixed Cost Per Unit Example
  • The fixed cost per local call decreases as more
    local calls are made.

Monthly Basic Telephone Bill per Local Call
Number of Local Calls
11
Cost Behavior
Examples of normally variable costs
Service Organizations Supplies and travel
Merchandisers Cost of Goods Sold
Merchandisers and Manufacturers Sales commissions
and shipping costs
Manufacturers Direct Material, Direct Labor, and
Variable Manufacturing Overhead
Examples of normally fixed costs
Merchandisers, manufacturers, and service
organizations PBB taxes, Insurance, Sales
salariesDepreciation, Advertising
12
Types of Fixed Costs
Discretionary May be altered in the short-term by
current managerial decisions
Committed Long-term, cannot be reduced in the
short term.
Examples Advertising and Research and Development
Examples Depreciation on Buildings and Equipment
13
Fixed Costs and Relevant Range
  • Example Office space is available at a
    rental rate of 30,000 per year in increments of
    1,000 square feet. As the business grows more
    space is rented, increasing the total cost.

14
Fixed Costs and Relevant Range
90
Total cost doesnt change for a wide range of
activity, and then jumps to a new higher cost for
the next higher range of activity.
Relevant Range
60
Rent Cost in Thousands of Dollars
30
0
0 1,000 2,000
3,000 Rented Area (Square Feet)
15
Fixed Costs and Relevant Range
Step-variable costs can be adjusted more quickly
and . . . The width of the activity steps is much
wider for the fixed cost.
How does this type of fixed cost differ from a
step-variable cost?
16
Semivariable Costs
A semivariable cost has both fixed and
variablecomponents. Consider the example of
utility cost.
Total semivariable cost
Total Utility Cost
Variable Cost per KW
Fixed MonthlyUtility Charge
Activity (Kilowatt Hours)
17
Semivariable Costs
Total semivariable cost Y a bX
Total Utility Cost
Variable Cost per KW
Fixed MonthlyUtility Charge
Activity (Kilowatt Hours)
18
The Analysis of Semivariable Costs
1. High-Low Method
2. Scattergraph Method
3. Least-Square Regression Method
19
The Scattergraph Method
Plot the data points on a graph (total cost vs.
activity).
20
The Scattergraph Method (2)
Draw a line through the data points with about
anequal numbers of points above and below the
line.
Y
20








Total Cost in1,000s of Dollars


10
Intercept is the estimated fixed cost (a)
10,000
0
X
0 1 2 3 4
Activity, 1,000s of Units Produced
21
The Scattergraph Method (3)
The slope is the estimated variable cost per
unit. Slope Change in cost Change in units
Y
20








Total Cost in1,000s of Dollars


10
Horizontal distance is the change in activity.
Vertical distance is the change in cost.
0
X
0 1 2 3 4
Activity, 1,000s of Units Produced
22
The High-Low Method
  • WiseCo recorded the following production activity
    and maintenance costs for two months
  • Using these two levels of activity, compute
  • the variable cost per unit
  • the fixed cost and then
  • express the costs in equation form Y a bX.

23
The High-Low Method
Change?in costChange in units
  • Variable cost per unit Change in cost
    change in units

24
The High-Low Method
  • Variable cost per unit 2,400 3,000 units

  • 0.80 per unit

25
The High-Low Method
  • Variable cost 2,400 3,000 units 0.80
    per unit
  • Fixed cost Total cost Total variable cost
  • Fixed cost 9,800 (0.80 per unit
    8,000 units)
  • Fixed cost 9,800 6,400 3,400

26
The High-Low Method
  • Variable cost 2,400 3,000 units 0.80
    per unit
  • Fixed cost Total cost Total variable cost
  • Fixed cost 9,800 (0.80 per unit
    8,000 units)
  • Fixed cost 9,800 6,400 3,400
  • Total cost Fixed cost Variable cost (Y a
    bX) Y 3,400 0.80X

27
Least-Squares Regression Method
  • Software can be used to fit a regression line
    through the data points.
  • The cost analysis objective is the same Y a
    bx

Least-squares regression also provides a
statistic, called the R2, that is a measure of
the goodnessof fit of the regression line to the
data points.
28
Least-Squares Regression Method
R2 is the percentage of the variation in total
cost explained by the activity.

Y
20










Total Cost
10
R2 for this relationship is near100 since the
data points arevery close to the regression line.
0
X
0 1 2 3 4
Activity
29
Cost Estimation MethodsRegression Analysis
A statistical method used to create an equation
relating independent (or X) variables to
dependent (or Y) variables. Past data is used to
estimate relationships between costs and
activities.
30
Cost Estimation MethodsRegression Analysis
The simple cost model is actually a regression
model TC F VX
Caution Before doing the analysis, take time to
determine if a logical relationship between the
variables exists.
This model will only be useful within a relevant
range of activity.
31
Cost Estimation MethodsRegression Analysis
  • A set of data can be regressed using several
    techniques
  • Manual computations
  • SPSS or SAS Statistical Software
  • Excel or other spreadsheet

Each regression model has an R-square (R2)
measure of how good the model is. Range of R2 0
to 1.0
The result of the regression process is a
regression model TC F VX
32
Simple Regression AnalysisExample
Fasco wants to know its average fixed cost and
variable cost per unit. Using the data to the
right, lets see how to do a regression using
Excel.
33
Simple Regression AnalysisExample
  • You will need three pieces of information
    from your regression analysis
  • Estimated Variable Cost per Unit (line slope)
  • Estimated Fixed Costs (line intercept)
  • Goodness of fit, or R2

To get these three pieces of information we
will need to use THREE different excel
functions. LINEST, INTERCEPT, RSQ
34
(No Transcript)
35
The Contribution Format
36
The Contribution Format
37
End of Session 3
Write a Comment
User Comments (0)
About PowerShow.com