PLM(Product Lifecycle Management) in - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

PLM(Product Lifecycle Management) in

Description:

PLM(Product Lifecycle Management) in HMC(Hyundai Motor Company) * * * * * * * PLM ... – PowerPoint PPT presentation

Number of Views:962
Avg rating:3.0/5.0
Slides: 27
Provided by: 6649732
Category:

less

Transcript and Presenter's Notes

Title: PLM(Product Lifecycle Management) in


1
PLM(Product Lifecycle Management) in HMC(Hyundai
Motor Company)
2
Contents
3
1. Introduction
4
Introduction
Strategies to get competitiveness
Recent tendencies of the automobile industry
5
Innovation
6
Information System Area of PLM
Need/ Opportunity
Concept/ Dev.
Process Product Design
Production
Deployment
Retire
Support/ Maintenance
Communication
CRM
CRM
Business Partnership
SCM
Integration of Resources Process
ERP
Product Development Data Control
PLM
7
Location of PLM in e-BIZ Model
Business Value
Process of managing Lifecycle Conceptiondesignm
anufacture People, data, process, biz
system Product information
SM
KM/QM
8
2. HMC (Hyundai Motor Company)
9
Overview of HMC(Hyundai Motor Company)
  • Established in 1967
  • The worlds fifth largest automaker
  • The worlds largest integrated automobile
    manufacturing facility in Ulsan
  • The Korean second largest company in terms of
    total assets in 2008 (except public enterprises)
  • Ranked second in "initial quality" in a
    survey/study by J.D. Power and Associates.

10
Motivation of adapting PLM
Effects of PLM adaptation in GM
Product development cycle 48 months ? 18 months
Research cost 12 ? 6 of total income
11
3. System Architecture of PLM in HMC
12
System Architecture of PLM
PDM Product Data Management DMES Digital
Manufacturing Engineering System
13
System Architecture of PLM
14
System Architecture of PLM
Development of P/T
Development of vehicle
Product planning
PMS(Project Management System)
PDM(Product Data Management)
P/T collaboration system
Product development
E-BOM (next generation BOM)
DMES(Digital Manufacturing Engineering System)
Production arrangement
15
System Architecture of PLM
Development of P/T
Development of vehicle
Product planning
PMS(Project Management System)
P/T collaboration system
PDM(Product Data Management)
Product development
E-BOM (next generation BOM)
DMES(Digital Manufacturing Engineering System)
Production arrangement
16
System Architecture of PLM
Development of P/T
Development of vehicle
Product planning
PMS(Project Management System)
P/T collaboration system
PDM(Product Data Management)
Product development
E-BOM (next generation BOM)
DMES(Digital Manufacturing Engineering System)
Production arrangement
17
System Architecture of PLM
Development of P/T
Development of vehicle
Product planning
PMS(Project Management System)
P/T collaboration system
PDM(Product Data Management)
Product development
E-BOM (next generation BOM)
DMES(Digital Manufacturing Engineering System)
Production arrangement
18
System Architecture of PLM
Development of P/T
Development of vehicle
Product planning
PMS(Project Management System)
P/T collaboration system
PDM(Product Data Management)
Product development
E-BOM (next generation BOM)
DMES(Digital Manufacturing Engineering System)
Production arrangement
19
4. Case Development of Powertrain
20
Case Development of Powertrain
What is the Powertrain?
  • The group of components that generate power
    deliver it to the road surface, water, or air
  • The engine, transmission, drivershafts,
    differentials and the final drive(drive wheels,
    continuous track)

21
Product Development via IT
Pre-Review
Detail Design
Fixed Model
Manufacturing
M
Platform Development
Proto-type
Maintenance DATA
Analysis
Detail Design
Maintenance Manual
Parts/Assembly
Car Design
Design Platform
Conflict/Fatigue..
Manufacturing Technology
Package,/Lay out
Design
CATIA Pro/E Viewing Tool -Viswiew -Modeview
CATIA..
Assembly/Manufacturing
Sight/Control
Digital Shape/Skin
Mold
PowerTrain Design/Analysis
Quality Inspection
Pro/E..
Parts/Car
22
Product Development via IT
Each design step using catia
Development isolated modeling method in each
design part
23
5. Conclusion
24
Conclusion
Expected effect by PLM
Profit Reducing cost in product lifecycle
Competitiveness Process improvement
Efficiency in DATA management
Productivity Quality Accumulation
Recycling knowledge
Support cooperation development Enterprise,
partner, etc
Innovative Ability Product Related service
25
Conclusion
Requirement for success in PLM
26
Reference
  • Catia V5 ????????????, ???????
  • PLM???????,????????
  • CAD????PLM???????????,???, ???????
  • ?????? ?????? ?? PLM????? ?????, ???????
Write a Comment
User Comments (0)
About PowerShow.com