Title: Western Washington Hydrology Model Version 3
1Western Washington Hydrology ModelVersion 3
- Vancouver, WA, Workshop
- October 17, 2007 PM
2WWHM3 Advanced Features
- offsite basin
- bypass basin
- sand filter
- lateral flow basins
- gravel trench bed/porous pavement
- bioretention/rain gardens (PRO)
- green roofs (PRO)
- culverts/HY8 (PRO)
- time series
- criteria checker (PRO)
- water tags (PRO)
- LID Analysis Tool
- Summary Report (PRO)
- Your topics of interest?
3Offsite Basin
An offsite basin is a basin outside the project
basin that drains through the project site to the
project mitigation pond.
4Bypass Basin
A bypass basin is a basin that is in the project
site, but does not drain to the project
mitigation pond.
5Sand Filter
A sand filter is a water quality facility that is
required to filter 91 of the total runoff volume.
6LID Modeling
- Lateral flow basins/Impervious runoff
dispersion. - Rain gardens.
- Green roofs.
- Porous pavement.
7Impervious Runoff Dispersion Modeling
Dispersion of impervious roof runoff on adjacent
pervious lawn allowing some water to infiltrate
before becoming stormwater runoff.
8Lateral Flow Basins
Lateral flow basins allow the lateral flow from
an impervious drainage basin to flow across a
pervious drainage basin. Total runoff is reduced.
9Bioretention/Rain Gardens
Rain garden/bioretention/landscape swale
Water infiltrates into the soil before runoff.
10Bioretention/Rain Gardens
Bioretention swale/rain garden is a stormwater
mitigation facility. It stores and infiltrates
runoff.
11Green Roof Modeling
Green/vegetated/eco-roof
Water is stored in the soil prior to runoff.
12Green Roofs
Green roof (also called a eco-roof or vegetated
roof) is a stormwater mitigation facility on the
roof of a building.
13Porous Pavement Modeling
- Currently represented by the gravel trench bed
element.
14Gravel Trench Bed/Porous Pavement
Gravel trench bed is a stormwater mitigation
facility it can also be used to represent porous
pavement.
15Other WWHM3 Features
- Culverts / HY8 program
- Time series
- Criteria checker
- Water tags
- LID Analysis Tool
- Summary Report
16Culverts/HY8
Culverts are conveyance facilities. The Federal
Highway Administration HY8 program can be used to
define the culverts hydraulics (optional).
17Time Series
Time series is a flow or precip period of record
from another WDM to be used as input to the
project.
18Criteria Checker
Criteria checker checks to set if certain
user-defined flow criteria are exceeded at a
specified POC.
19Water Tags
Water tags are used to track the movement of
water from a specific source through the
conveyance system.
20LID Analysis Tool
LID Analysis Tool compares different development
options selected by the user and shows the runoff
distribution.
21Summary Report
Summary Report provides a detailed summary of the
project input information.
22WWHM3 packages
- WWHM3 Standard free from Ecology.
- WWHM3 PRO available for a fee from CCS.
- PRO Basic Includes culverts, bioretention/rain
gardens, green/eco-roofs, criteria checker,
multiple time steps, water tags, the ability to
read HSPF UCI files, and the Summary Report
option. - PRO GIS Includes GIS Import and PRO Basic
features. - PRO SWMM Includes optional SWMM routing and PRO
Basic features. - PRO Complete Includes optional SWMM routing and
GIS Import and PRO Basic features.
23Questions?Contact Doug Beyerlein
425.892.6454beyerlein_at_clearcreeksolutions.com
Joe Brascher 360.236.1321brascher_at_clearcreeksol
utions.com