Title: Welcome to the Session on Financial Management and Procurement
1Procurement Procedure in SSA
Technical Support Group, SSA
2Main Considerations
PROCUREMENT
Accountability and Ethical Standards
Economy
Efficiency
Transparency
Fairness
3Main Considerations of Proficient Procurement
- Economy Give the purchaser best value for money.
- Efficiency Best procurement is simple and swift,
producing positive results without protracted
delays. - Fairness Impartial, consistent, and therefore
reliable. - Transparency Maintains rules and procedures that
are accessible and unambiguous. It is not only
fair, but should be seen to be fair. - (v) Accountability and Ethical Standards A key
deterrent to collusion and corruption, and a key
prerequisite for procurement credibility.
4Why is Procurement Important?
- In procurement terms inputs are generally grouped
into three categories - (i) Civil Works School Infrastructure and
facilities like New PS, UPS, Residential Schools,
Hostel, ACR, HM Room, BRC/URC, CRC, Drinking
water, Toilets, Girls Toilet, Ramps, Handrail,
Electrification, Retro-fitting, Boundary wall/
fencing, Major Repairs, etc. - (ii) Goods - Typically equipment, computers,
furniture, textbooks, library books, uniforms,
TLE, TLM, other materials, supplies, commodities,
etc. - Services Hiring of services including
academic, technical and resource support provided
by institutions/organizations in all areas,
research studies, third party quality evaluation
of civil works, auditors etc. - The quality, timeliness, local appropriateness
and affordability of those procured inputs can
largely determine whether the public investments
will succeed or fail.
5Effective Procurement
Objectives
Timely Delivery as per schedule
Right Quality product
Lowest possible price
Meeting recognized standards
Reliable suppliers
Right quantities
6PROCUREMENT IN SSA
- Strictly follow procurement procedure prescribed
in Chapter IX of the Manual on Financial
Management and Procurement (FMP). - Mandatory to follow the Manual provisions for all
procurements under SSA. - Follow States financial ceilings except when
not prescribed by MHRD. - Strictly follow MHRDs financial ceilings
prescribed for various method of procurement on
17-09-2008 as extended on 2-7-2010 which shall
prevail on States ceilings. - Convert the Ceilings in US to Indian Rupee by
adopting RBIs buying rate of exchange prevailing
on the date of issue of purchase order/work
order.
7 MHRDs Financial ceilings per contract
(In US equivalent)
Category Open Tender Limited Tender Single Tender Community
Goods gt50,000 lt3000,000 lt 50,000 lt30,000
Works gt40,000 lt300,000 lt50,000 lt40,000 lt40,000
Text books Upto 1 million lt500.000
SIEMAT Upto 800,000
Information Technology equipment gt50,000 lt4 million lt50,000
Books, Teaching materials school facility improvement, hiring of vehicles of equipment lt30,000
Service Contract lt200,000 lt200,000 lt200,000 lt200,000
- Any contract in excess of the maximum limit
indicated above shall not be procured using SSA
funds.
8Points to be kept in view
- Identification of Needs.
- Ensure availability of specific budget provision.
- Assessment of bulk requirement at the beginning
of the financial year. - Computer, equipment, furniture, books etc in
economic lots as per annual need. - Procure miscellaneous items of stores not covered
by bulk requirement as per actual need. - Make all purchases to the best advantage after
comparison of competitive prices. - Strictly follow the level of procurement
prescribed in the Manual - Encourage decentralized procurement
- Avoid centralized procurement of items
prescribed at lower level
9PROCUREMENT
- Strictly follow the levels of procurement
provided in Para 112 of the Manual on FMP
9
10- School/KGBV level
- All civil works, except buildings for Residential
Schools/Hostels and KGBV. - Furniture to Govt. UPS
- Library Books for schools
- Teaching Learning Material
- School grant.
- Maintenance grant.
- Teaching Learning Equipment
- REMS
- Learning Enhancement Programme (LEP).
- Items required for KGBV.
- Uniform
- Special Training related Items
- TLM, Contingency etc.
11CRC/BRC level
- Furniture/ equipment/computer etc.
- Office contingencies
- Teaching Learning Material
- Teacher Training
- Community Training
- Civil works for construction of BRC, augmentation
of BRC and CRC - Maintenance of BRC and CRC
- Printing work
- REMS
12District level
- Office equipment for DPO
- Office furniture for DPO
- Textbooks/other books/supplementary materials
- Computers and accessories
- Aids and appliances for CWSN
- Office contingencies
- Hiring of vehicles
- Maintenance of equipment and vehicles
- District level training and workshops
- Printing work
- REMS
- ECCE Kit
- Educational Kits for girls
- Learning Enhancement Programme (LEP)
- Construction of Residential Schools/Hostel and
KGBV
13State level
- Textbooks
- Computers and its accessories
- Office equipment for SPO
- Office furniture for SPO
- Equipment for distance education
- Aids and appliances for CWSN
- Office contingencies
- Hiring of vehicles
- Maintenance of equipment and vehicles
- State level training and workshops
- Printing work
- Engagement of consultancy firms (service
contract) - Engagement of Auditors for external and internal
audit - Engagement of experts/resource persons
- Engagement of NGOs
- REMS
- Learning Enhancement Programme (LEP).
14PROCUREMENT
- Prepare the Procurement Plan every year and
upload on SSAs website as envisaged in Para 113
of the Manual. - A Model Procurement Plan tentatively prepared at
the National level is given separately. - Strictly follow financial ceiling prescribed for
each method. - Urged the States on 16th June 2011 to prepare the
annual procurement plan for 2011-12 and upload
the same on the web site. - Information received from 9 States of Chandigarh,
Haryana, HP, Madhya Pradesh, Maharashtra,
Meghalaya, Rajasthan, Uttarakhand, West Bengal. - Information yet to receive from the remaining 26
States. - Defaulting States to ensure preparation of
procurement plan on priority. - Linkage of all procurements with plan will be
looked in audits, post review and concurrent
review.
15Method of Procurement
Method of Procurement
Procurement through communities
Open Tender
Limited Tender
Single Tender
Procurement without tender / quotation
16OPEN TENDER
- Meaning
- Competitive bidding procedure and is the most
efficient and economic way of procuring goods or
works. - Provides for adequate competition in order to
ensure reasonable prices. - Ensures transparency and equal opportunity to
all. - The methods used in the evaluation and the award
of contracts are made known to all bidders. - Items covered
- Civil works construction of BRC, Residential
schools / Hostel, KGBV, SIEMAT and any other
civil works specifically approved by Project
Approval Board through contractors. - Goods
17OPEN TENDER
- Steps
- Preparation of tender documents
- Notification / Advertisement
- Issue of tender documents
- Pre-bid Conference
- Submission of tender documents
- Public opening of tender
- Evaluation
- Selection of lowest evaluated responsive bidder
based on post qualification - Negotiation with L-1 (if necessary)
- Contract award and
- Contract performance
18- Tender documents
- Should be user friendly, self contained,
comprehensive, unambiguous and relevant to the
objective of purchase. - Use Standard State Governments tender documents
duly modified, if necessary, to cover the
following sections - Section - I Invitation for Bids (IFB)
- Section - II Instructions to Bidders (ITB)
- Section - III General Conditions of Contract
- Section - IV Special Conditions of Contract
- Section - V Schedule of Requirements
- Section - VI Technical Specifications
- Section - VI-A Post Qualification Criteria
- Section - VII Bid form and Price Schedule
- Section - VIII Bid Security Form
- Section - IX Contract Form
19- Section - X Performance Security Form
- Section - XI Performance Statement
- Section - XII Manufacturers Authorization Form
- Section - XIII Form for Bank Guarantee for
Advance Payment - Section - XIV Performa for Equipment and
Quality Control employed by the Manufacturer - Important Clauses
- Notification of Tender Notice
- Sale of tender documents
- Schedule of requirement
- Bid Form
- Bid Prices
- Technical Specifications
- Post-Qualification Criteria
- Bid Validity Period
20- Earnest Money
- Pre-bid Conference
- Signing of Bids
- Submission of bids
- Opening of bids
- Evaluation criteria
- Negotiation with L1
- Award of contract
- Security deposit
- Retention money
- Signing of agreement/contract
- Payment terms
- Adjudicator
- Force Majeure
- Liquidated damages
- Corrupt or Fraudulent Practices
- General Conditions of Contract (GCC)
- Special Conditions of Contract (SCC)
21Procurement Steps
- Repeat Orders
- Quantity increase/decrease as per State procedure
- Place order within one month from the date of
last supply - Prices have since not reduced
- Purchases not made on urgent basis
- Right to Accept any Bid or Reject all Bids
- The purchaser has the right to accept or reject
any bid and to annul the bidding process and
reject all bids at any time prior to award of
contract. - Rejection of all bids
- Lack of competition
- Tenders not substantially responsive
- Review the causes justifying the rejection
- Obtain the approval of competent authority
22Procurement Steps
- Award of Contract
- Award Criteria
- Award the contract within the bid validity
period. - Award the contract to the successful lowest
evaluated responsive bidder - The selected bidder need not undertake work not
specified in bidding documents or to modify his
bid. - Single offers received
- Consider if
- publicity was adequate,
- bid specifications / conditions were not
restrictive or unclear and bid prices are
considered reasonable.
23LIMITED TENDER
- Items covered
- Goods including books, uniforms
- Teaching learning materials,
- School equipment,
- Hiring of vehicles, and
- Operation and maintenance of equipment
- Invitation for quotations
- Based on comparing price quotations obtained from
several suppliers, usually at least 3 to ensure
competitive prices. - Issue a letter to the supplier to furnish the
quotations for the required goods/equipment.
24LIMITED TENDER
- Invitation for quotations
- No need of publication of notification in the
newspaper/website. - Issue the request letters to suppliers on the
approved list. - The request letter should indicate description,
specifications and quantity of the goods as well
as desired delivery time and place. - Only one quotation by each supplier.
- Bid Price
- Quote for the full quantity as described in the
invitation letter. - Corrections, if any, made by crossing out, dated
initialing and re-writing. - Include all duties, taxes and other levies
payable by the Vendor/Supplier in the total
price. - The rates quoted by the Vendor/Supplier be fixed
for the duration of the contract and not subject
to adjustment on any account. - The prices are quoted in Indian Rupee.
24
25LIMITED TENDER
- Steps
- Identifying items
- Laying down specifications
- Estimating total numbers and costs of items
- Need not notify in newspaper/website
- Identifying likely agencies borne on the approved
list of contractors/ suppliers (minimum 3, 8-10
for more competitive rates) - Obtaining approvals of competent authority
- Issuing letters of invitation
- Processing quotations received
25
26- Obtaining orders of competent authority for
placing orders for supply - Issuing letters placing orders for supply and
delivery period - Quoted price shall include all duties, taxes and
other levies - Rates quoted be fixed and not subject to
adjustment - Ensuring inspection
- Ensuring timely supply and
- Making payments after delivery in satisfactory
condition. - The financial ceiling prescribed for limited
tender shall be applicable for Rate contracts of
DGS D and Rate contracts of State Governments.
27SINGLE TENDER
- Followed in the case of
- Articles specifically certified as of propriety
nature or - Manufactured by a particular firm
- Goods including books
- Teaching materials
- School grant
- Hiring of vehicles and
- Operation and maintenance of equipment etc
- Appropriate for
- Extension of existing contracts
- Standard equipment/spare parts for existing
equipments from original supplier. - Items obtainable from one source
- Early delivery
- In exceptional cases such as natural disaster.
28- WITHOUT TENDER / QUOTATION
- Procurement of goods or group of goods estimated
to cost the equivalent of the ceiling of State
Govt. - Issue suitable guidelines by the SIS
- THROUGH COMMUNITIES
- Construction of all civil works except, BRC,
Hostel, KGBV and SIEMAT - BRC construction if the community is technically
capable - Purchase of materials as per ISI certification,
if available - SPD may provide simple procurement guidelines
29- Identify the committee locally operating in the
area. - Keep the following points in view
- Active involvement of community in planning and
implementation - Who will procure the materials or goods used in
works - Goods / works have to be executed as per approved
plans and specifications - The name and designation of the Engineer for
technical supervision and certification.
30- Suggested advance payments based on the
certificate issued by the Supervising Engineer - Advance (mobilisation advance
- upon start up of the work and
- on reaching lintel level)
75 of total cost - Plastering and completion of
- work
25 of total cost - School toilet and other repair works
- Advance (mobilisation advance
- upon start up of the work) cost 75
of total - Plastering and completion
- of work cost
25 of total
31Service Contract
Considerations
High Quality
Efficiency
Transparency
Economy
32Service Contract
- Selection process
- Preparation of Terms of Reference
- Preparation of Cost Estimate and Budget
- Advertisement, seeking Expression of Interest
(EOI) - short listing of consultants/firms based on EOI
- Issue of Request for Proposal (RFP) to short
listed Consultants/firms. - Receipt of RFP in two envelope system, technical
and financial proposals separately. - Formation of Evaluation Committee
- Evaluation of Technical proposal and assign
individual mark by each member on the basis of
responsiveness to the TOR - Open the Financial proposals of the qualifying
Consultants publicly in the presence of the
Consultants/representatives - Final discussions including negotiations
- Award of contract
33Service Contract
- Terms of Reference (TOR)
- Prepare a well-defined TOR specifying the
services to be provided on the following lines - Background information
- A precise statement of objectives
- An outline of tasks to be carried out
- A time schedule for completion of tasks
- The support/inputs provided by the Client
- Composition of Review Committee to monitor the
services - List of key personnel whose CV and experience
would be evaluated. -
34Service Contract
- Preparation of Terms of Reference
- Preparation of Cost Estimate and Budget
- Advertisement, seeking Expression of Interest
(EOI) - short listing of consultants/firms based on EOI
- Issue of Request for Proposal (RFP) to short
listed Consultants/firms. - Receipt of RFP in two envelope system, technical
and financial proposals separately. - Formation of Evaluation Committee
- Evaluation of Technical proposal and assign
individual mark by each member on the basis of
responsiveness to the TOR - Open the Financial proposals of the qualifying
Consultants publicly in the presence of the
Consultants/representatives - Final discussions including negotiations
- Award of contract
- Performance of contract
35Service Contract
- Cost Estimate and Budget
- Based on the assessment of resources needed to
carry out the assignment, staff time, logistical
support and physical inputs. - Costs divided into two broad categories (a) fee
or remuneration and (b) reimbursable. - Ensure that the requested services are within the
current financial budget. - Advertising
- Not necessary for short term consultancy
services. - Advertisement seeking Expression of Interest for
other services, is published in regional and
national newspapers having wide circulation and
uploaded in the web site of the Client. - Specify requisite qualifications, experience etc.
in the notification.
36Service Contract
- Short list of Consultants
- Short list the Expression of Interest received
based on the relevant qualifications and
experience specified in the notification. - Receipt of proposals
- Issue letter of Invitations along with the TOR to
the short listed consultants/firms. - Seek proposals from the short listed consultants
/ firms in two envelope system i.e, technical
proposal in one envelope and financial proposal
in another envelope. - Evaluation Committee
- Constitute evaluation committees separately for
technical and financial evaluation - This committee will evaluate the proposals
received from the consultants / firms
37Service Contract
- Evaluation
- Carried out in two stages, first the quality and
then the cost - Until the technical evaluation is concluded the
evaluators of technical proposals will not have
access to the financial proposal - Evaluation of Technical Proposal
- Carried out on the basis of the responsiveness to
the TOR. - The technical evaluation committee will prepare
an evaluation report on the technical aspects of
the proposal. - The report shall substantiate the results of the
evaluation and describe the relative strength and
weaknesses of the proposals. - Individual marks will be assigned by each member
and a consolidated mark sheet is prepared. - Minimum qualifying marks should be provided in
the Letter of Invitation and those who are not
obtaining this will be disqualified
38Service Contract
- Evaluation of Financial Proposal
- On completion of technical evaluation, notify
those consultants whose proposals did not meet
the minimum qualifying marks that their financial
proposals will be returned after completing the
selection process. - Simultaneously notify the consultants who have
secured the minimum qualifying marks and intimate
the date and time set for opening the financial
proposal. - Allow sufficient time for attending the opening
of financial proposals - The financial committee shall open the financial
proposal publically in the presence of
representatives of the consultants / firms who
choose to attend. - Read aloud the name of the consultant / firm, the
quality scores and the proposed prices when the
financial proposals are opened - Prepare the minutes of the public opening.
39Service Contract
- Final discussions (negotiations)
- Held with the selected consultant /firm on the
following issues - The selected consultant /firm shall not be
allowed to substitute key staff unless both
parties agree that undue delay in the selection
process makes such substitution unavoidable or
that such changes are critical to meet the
objectives of the assignment. - Financial discussions shall include in addition
to fee / remuneration, clarification of the
consultants / firms tax liability and how this
tax liability shall be reflected in the contract. - In case these discussions fail to result in an
acceptable contract, terminate the process and
invite the next ranked consultant / firm for
discussion - After the process is successfully completed,
promptly notify other consultants /firms on the
short list that they were unsuccessful
40Service Contract
- Award of Contract
- Award the contract to the selected consultant /
firm - Use the prescribed contract agreement form for
signing the contract - Indicate the fee/remuneration negotiated with the
selected consultant/firm to be paid for the
services in the contract agreement and also the
terms of payment
41Non-Government Organizations
- Preparation of Terms of Reference
- Publication of advertisement
- Formation of Evaluation Committee
- Short-listing of NGOs on the basis of
specifications and scope of the work specified in
the TOR. - Desk appraisal and if found suitable, field
appraisal by the Evaluation Committee - Recommendation by the Evaluation Committee for
the selection of NGOs to the Grant-in-Aid
Committee. - Approval by Grant-in-Aid Committee based on the
report of the Evaluation Committee on the desk
and field appraisal.
42- Post Review
- Government of India or the funding agencies shall
undertake post review of the contracts awarded on
procurement of goods, works and services on a
random basis. - All procurement documents should be retained and
made available to the review team. - Mis-procurement
- Goods, works and services that have not been
procured as per the Manual shall be treated as
mis-procurement and SSA funds cannot be used for
such procurement.
43- Complaint Handling Mechanism
- Set up complaint handling mechanism at national
as well as State level to deal with complaint
received from contractors/suppliers. - Dealt with at a level higher than that of the
level at which the procurement process is being
undertaken - Undertake a thorough enquiry of the allegations
made - If found correct, take appropriate remedial
measures - Initiate disciplinary proceedings against the
delinquent staff - Receipt of any illegal gratification by staff is
considered as misconduct and result in
disciplinary proceedings against such staff, in
addition to imposing penalties under the law.
44Thank You