Timing Controls - PowerPoint PPT Presentation

1 / 6
About This Presentation
Title:

Timing Controls

Description:

Timing Controls Outline Requirements External Interfaces Schedule Date Needed Prototype Completion Date Hardware Order Date Installation Test Period Design – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 7
Provided by: DayleK4
Category:

less

Transcript and Presenter's Notes

Title: Timing Controls


1
Timing Controls
  • Outline
  • Requirements
  • External Interfaces
  • Schedule
  • Date Needed
  • Prototype Completion Date
  • Hardware Order Date
  • Installation
  • Test Period
  • Design
  • Design Maturity (what reviews have been had)
  • State of Wiring Information
  • State of Prototype

2
Requirements
  • Timing triggers are sent to devices to synch
    acquisitions and measurements down the beamline
  • Triggers are synched to the RF clock
  • Input timing patterns (PNET SLCNET) arrive at 360
    Hz, 1/120 sec in advance of when they are
    executed
  • Late updates (during 1/120 sec prior to
    execution), for eg, MPS status updates, are also
    accepted
  • PNET pattern does not include everything. Eg.
    EPICS timestamp, LCLS MPS rate-limit and
    mitigation device status must be appended on.

3
External Interfaces
  • PNET to LCLS MPG
  • 128 bit PNET pattern _at_ 360 Hz including PP, YY,
    incl/excl mask and a 4 bit countdown to pulse id
    rollover
  • LCLS MPG to EVG
  • 128 bit PNET pattern EPICS timestamp LCLS MPS
    rate limit _at_ 360 Hz
  • MPS to LCLS MPG
  • 16 bit digital input signal containing
  • Rate limit 0, 1, 10, 30, 60, 120, 360 (4 bits)
  • Rate limit originnumber of 360 Hz pulses before
    the new rate limit will begin (7 bits)
  • Portion of pulse id for comparison (2 bits)
  • Mitigation device(s) in place none, Pockels
    cell, single bunch beam dumper, both(2 bits)
  • EVG to EVG fanout to EVRs
  • EVG sends LCLS MPG data (above) to EVRs at 360 Hz
    via an EVG fanout module
  • EVRs to EVR transition modules
  • EVRs send triggers out after once timer counting
    programmed delay is done
  • EVR transition modules to devices
  • Trigger signals data acquisition and measurement

4
External Interfaces (2)
5
Schedule
  • Date Needed to BC1 Dec/06
  • Prototype Completion Date VME Mar/06

  • PMC Jul/06
  • Hardware Order DateApr/06
  • Hardware Delivery DateJun/06
  • Installation in injector Oct/06
  • Test Period Nov/06

6
Design
  • Design maturity (what reviews have been had)
  • EPICS Collaboration Meeting Timing Session
  • Establishing collaboration between LANL, ORNL,
    KEK and SLAC for next generation timing system
  • PNET Design Review 19May2005
  • Timing presentation at Lehman Review, May 10-12,
    2005
  • Timing SCR/PDR by controls group, Nov 16-17, 2005
  • Docs at http//www.slac.stanford.edu/grp/lcls/con
    trols/global/subsystems/timing/
  • State of wiring percent complete Captar input
    will be given at time of presentation
  • State of prototype PNET part done. EVG/VME EVR
    200 in house. Converting driver and device
    support to RTEMS
Write a Comment
User Comments (0)
About PowerShow.com