Presentation of a Construction Project Assignment 3 Unit 21 Kyle Barrass First Stage of the Construction Building The first step was to design a drawing of the ... – PowerPoint PPT presentation

Number of Views:80
Avg rating:3.0/5.0
Slides: 21
Provided by: KyleBa
Category:

less

Transcript and Presenter's Notes

Title: Assignment 3 Unit 21Kyle Barrass


1
Presentation of a Construction Project
Assignment 3 Unit 21 Kyle Barrass
2
First Stage of the Construction Building
  • The first step was to design a drawing of the
    building to give the client an idea of what he
    wanted.

3
First Stage of the Construction Building
  • The client decides on what he wants.

4
First stage of the construction Building
  • Before the building was even started there was a
    Gant chart make to know what was going to happen,
    when it was going to happen and how long it
    should take.

5
Designing the Building
  • After the design on the building was chosen I
    designed a mini version of the timber frame.

6
Designing the Building
  • Before the brick walls started the timber frame
    flooring was put into place.

7
Designing the Building
  • After the mini model of the timber frame was done
    the work on the foundations had already been done
    so work on the brick and block walls was started.

8
Designing the Building
  • The work on the building was set back down to the
    bad weather, it was set back by a few weeks.

9
Designing the Building
  • As the brick walls had been held back the timber
    frame walls were being put together.

10
Designing the Building
  • After the timber frame walls were built the work
    on the window frames and door frames started.

11
Designing the Building
  • The Gant chart had to be changed as the bad
    weather set the building back by a few weeks, as
    you can see in the photo below.

12
Designing the Building
  • As you can see the brick walls had been kicked
    down by someone coming onto the site, so the
    brick and block building was set back even more.

13
Designing the Building
  • Here are the students putting the plywood on the
    timber floor.

14
Designing the Building
  • The timber framed walls were put up and as you
    can see we ran into a little problem that was
    easily solved.

15
Designing the Building
  • The first timber roof trust was built and the
    only thing that needed changing was the length of
    the overhang.

16
Designing the Building
  • The plywood was put onto the timber walls and the
    roof trusts were constructed with more overhang.

17
Designing the Building
  • The work on the brick and block building was
    started again and the block work was started on
    the timber and block building.

18
Designing the Building
  • The rest of the roof trusts were put in place and
    then the ply wood was put in place.

19
Designing the Building
  • The work on the tiling being done and the rest of
    the brick and block building is being done at the
    same time.

20
Summary
  • Timber frame construction was erected quicker
    than traditional building
  • Adverse weather had little impact on timber frame
    construction
  • Quality issues with some of the timber walls and
    roof construction to improve inspection