BABAR - PowerPoint PPT Presentation

About This Presentation
Title:

BABAR

Description:

babar ifr upgrade detector assembling and mounting detector layout exploded detector layout assembled iarocci tube tube material : noryl or pvc the tube is not self ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 18
Provided by: VittoreC9
Category:

less

Transcript and Presenter's Notes

Title: BABAR


1
BABAR
  • IFR UPGRADE
  • DETECTOR ASSEMBLING
  • AND
  • MOUNTING

2
DETECTOR LAYOUTEXPLODED
3
DETECTOR LAYOUTASSEMBLED
4
IAROCCI TUBE
  • TUBE MATERIAL NORYL OR PVC
  • THE TUBE IS NOT SELF SUPPORTING

5
RIB
  • RIB MATERIAL STEEL
  • NUMBER OF RIBS TO BE OPTIMIZED DEPENDING ON
    DETECTORS EFFICIENCY AND STIFFNESS REQUIRED
  • ASSUMING A RIB OF 1 MM THICK FOR EACH TUBE, THE
    TOTAL LENGTH NEEDED IS ABOUT 8000 m THE
    CORRESPONDING WEIGHT IS 1260 Kg AND THE COST
    3.61260 4536 (20 VAT INCLUDED)

6
DETECTORS STIFFNESSTHE HELP OF THE RIBS
7
GLUEING PHASE 1
  • THE RIB IS GLUED ON THE TUBES SIDE

8
GLUEING PHASE 2
  • THE DETECTORS MODULE IS ASSEMBLED

9
GLUEING PHASE 3
  • STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS
    ARE ASSEMBLED
  • THE TOTAL THICKNESS IS ABOUT 1 MM

10
GLUEING PHASE 4
  • STRIPS, GROUND, SIGNAL PCB AND INSULATOR FOILS
    ARE GLUED ON THE TUBES

11
DETECTORS VERTICAL STIFFNESS
12
MOUNTING AND DISMOUNTING THE DETECTOR
  • THE STRIPS FOIL GOES IN TO THE GAP (SLIDE 13) A
    PROPER TOOLING KEEPS IT IN SHAPE AND PLACE
  • THE MODULES OF THE DETECTOR ARE INSERTED ONE BY
    ONE FROM THE BOTTOM TO THE TOP, THE NEXT SLIDING
    ON THE PREVIOUS ONE (SLIDES 14, 15)
  • EACH MODULE CAN BE HELD ON BOTH EDGES, WHICH
    ALLOWS THE LIFTING AND THE ADJUSTMENT.
  • WHEN THE CORNER PIECES ARE MOUNTED THE DETECTOR
    DISASSEMBLY IS STILL POSSIBLE AFTER THE CENTER
    PIECES REMOVAL (SLIDE 16) THE PROCEDURE IS THE
    FOLLOWING

    1) LIFTING THE UPPER MODULES


    2) EXTRACT THE CENTRAL MODULES


    3) IN THE MIDDLE OF THE GAP THERES THE SPACE TO
    LOWER OR LIFT THE OTHER MODULES.AND REMOVE THEM.
  • THE OPERATION OF ASSEMBLY AND DISASSEMBLY NEED A
    TOOLING, HOLDING AND HANDLING THE MODULES OF THE
    DETECTOR.

13
INSERTING THE STRIP FOIL
  • THE STRIP FOIL SLIDES INTO THE GAP
  • A TOOLING HOLDING AND MOVING THE FOIL IS NEEDED

14
INSERTING THE DETECTOR - 1
15
INSERTING THE DETECTOR - 2
16
EXTRACTING THE DETECTOR
17
THE LAYER IN PLACE
Write a Comment
User Comments (0)
About PowerShow.com