ADVANCED POWER QUALITY MEASUREMENT CAMPAIGN - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

ADVANCED POWER QUALITY MEASUREMENT CAMPAIGN

Description:

... false voltage dips Instability problems Interaction between different renewables Increased operation of load-tap-changers Higher than rated power production ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 13
Provided by: Aim
Category:

less

Transcript and Presenter's Notes

Title: ADVANCED POWER QUALITY MEASUREMENT CAMPAIGN


1
ADVANCED POWER QUALITY MEASUREMENT CAMPAIGN
Tarjei Solvang Norway Session 2 Paper 0942
2
Content
  • Introduction
  • Campaign objectives
  • System description
  • Measurement locations
  • Measurement results
  • Concluding remarks

3
Introduction
  • The importance of performing power quality
    measurements has gained increased interest in
    Norway
  • SINTEF Energy Research are currently performing a
    power quality measurement campaign in Norway (a
    previous campaign 1993 2003)
  • The first meters were deployed in 2007
  • A total of 25 instruments are measuring
    continuously
  • The measurement campaign is funded by the
    Norwegian Research Council, Norwegian utilities,
    power producers and industry companies

4
Campaign objectives
  • Establish database
  • Map PQ in different networks
  • Analyse how disturbances spread
  • Analyse the influence of DG
  • Develop a VQ disturbance recognition prototype
  • New models and methods for load modelling

5
System description
  • Wave shape stored for voltage and current
  • Sample rate 25,6 51,2 kHz
  • Instruments synchronized through GPS or NTP
  • Data download by FTP through 3G or broadband
  • SQL database
  • Data compression
  • Parameter computing (from sine wave raw data)
  • Data viewing and analysis
  • Vendor software
  • Matlab analysis by raw data export to Matlab

6
Measurement locations
7
Distribution of measurement instruments by
category
Category Number of instruments
Small scale hydro power 9
Wind power 7
Heavy industry 3
Critical infrastructure 2
Office building/Service sector 2
Rural areas (mainly overhead lines) 21
City networks (mainly power cables) 4
High voltage level (U gt 22 kV) 6
Medium voltage level (1 kV lt U 22 kV) 12
Low voltage level (U 1 kV) 6
8
  • Measurement results

9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
Concluding remarks
  • Measurement of power quality increasingly
    important
  • Distributed generation from new renewables
  • New challenging loads
  • Sensitive equipment
  • Stressed system with ageing infrastructure
  • New and advanced measurement systems
  • Enhanced system overview and control
  • No loss of data
  • Automatic diagnostics of measurement data
  • Valuable measurement results
  • Saturation of measurement transformers false
    voltage dips
  • Instability problems
  • Interaction between different renewables
  • Increased operation of load-tap-changers
  • Higher than rated power production
Write a Comment
User Comments (0)
About PowerShow.com